Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Geochemical Assessment of Mine Waste Materials and Prediction of Final Pit Lake Water Quality at a Proposed Gold Mine in Mongolia
By I Swane, R Rait, A Robertson
Geochemical assessment of mine waste materials prior to commencement of a proposed mining operation is a fundamental component of mine feasibility studies and the regulatory approvals process. Static
Sep 29, 2013
-
Processing of Magnetite Iron Ores - Comparing Grinding Options
By A Jankovic, D David, P Payne
Although the majority of current steel production is supported by iron ore sourced from high-grade haematite deposits, the long-term growing demand for steel has led to higher raw material prices and
Jan 1, 2009
-
Metallurgical QA/QC – who needs it? The Olympic Dam experience
By K Ehrig, V Liebezeit, E Macmillan
The results from metallurgical test programs are used in feasibility studies for design of new plants and brownfield expansions, in long term mine plans, and to make decisions in an operating plant. T
Sep 11, 2017
-
Ventilation contaminant characterisation for a greenfield project
By A Hatt
This paper presents a case study of characterisation work undertaken at a greenfield exploration project to provide engineering and OH&S inputs for the design of a ventilation system. The paper discus
Oct 12, 2022
-
Health Impacts Extend from the Life of a Mine to the Life of a Community - Knowledge Gaps
By P Kirsch, P Jagals, D Viswanathan, J Shandro, R LaBouchardiere
The planning, design and operation of mines must include the development of positive environmental, community and land-use benefits if it is to achieve good corporate social responsibility and minimis
Jul 10, 2012
-
Effect of horizontal stress on shallow coalmine slopes
By I Canbulat, A Mcquillan
This paper presents a parametric analysis showing the impact of virgin in situ stresses on a shallow (less than 100 to 150 m) high slope in a jointed sedimentary rock environment. Slope stability is a
Nov 29, 2022
-
The interaction between slag and MgO refractory at conditions relevant to nickel laterite ore smelting
By A D. Pradana, D R. Pradana, Y H. Putra, Z Zulhan, T Hidayat
The high temperature processing of nickel laterite ore is currently dominated by the Rotary Kiln- Electric Furnace (RKEF) technology. The ratio of SiO2/MgO (S/M) in the ore is one of the critical para
Aug 21, 2024
-
Carbon kiln selection, operation and maintenance
By J K. Claflin, S R. La Brooy, A M. Claflin
Rotary kilns have been in service in the gold industry to regenerate carbon for 65 years. At the time oxide ores with gold head grades of 8 to 10 g/t were being treated. Carbon could be regenerated ad
Aug 29, 2018
-
Flotation of Unclassified Ball Mill Discharge for the Recovery of the Lead and Zinc Concentrates
The sulphide ore occurring in the North Mine at Broken Hill is of a complex nature, consisting of an intimate mixture of argentiferous galena, marmatite (zinc-iron sulphide), and gangue minerals. A ty
Jan 1, 1933
-
VertiMill® Performance Updates in Secondary and Regrind Duties at Cannington Mine, BHP Billiton
By J Allen, B Oats, S Palaniandy, M Lollback
The Julius Kruttschnitt Mineral Research Centre has conducted an intensive VertiMill® (VTM) survey program at the Cannington mine concentrator as part of the ‘collaborative research in stirred milling
Sep 1, 2014
-
Considerations for the design and support of underground portals
By M P. Sandy, R M. Stephenson
Portals to access underground mines are important infrastructure and their design requires careful consideration. Portals are generally expected to last for the life of the mine. Typically, the exposu
Mar 15, 2021
-
Investigation on Collector Optimisation in the Reverse – Iron Ore Flotation
By M S. Cassola
It’s expected that the world economy will face a stable and continuous growth in the demand of iron ore, reaching more than two billion tonnes per year within the next year. After decades exploiting r
Jul 11, 2011
-
Iron Ore Grade Control for Flitch Mining – An Alternative Method for the Hope Downs Operation, Hamersley Province, Western Australia
By A D. Caccioppoli
Grade control systems within Rio Tinto Iron Ore have proven to be robust, when mining full benches. The Hope Downs 1 operation hosting two Marra Mamba Iron Formation deposits (North and South Deposits
Aug 22, 2011
-
Adequacy of Sampling and Volume Estimation for Premining Potential Acid Forming Waste Evaluation Using Statistical and Geostatistical Methods
By A Garvie, D Kentwell, J Chapman
"Most new mining projects require an initial assessment of the locations and volumes of potential acid forming (PAF) waste that is likely to be moved and dumped in surface waste stockpiles. This requi
Jul 10, 2012
-
Surface-to-inseam (SIS) Drilling at Oaky Creek Coal Mine – SIS Design Aspects and Drilling Environment
By E Corpuz, J Weissman, S Winter, R Evans
The surface-to-inseam (SIS) directional drilling technique has been utilised at Oaky Creek Coal for more than a decade to predrain both the Oaky No 1 and Oaky North mining areas. The cumulative drilli
Aug 31, 2015
-
Sustainable Development Reporting in the Australian Minerals Processing Industry
By A Bossilkov
Although environmental and sustainable development reporting has now become widespread in the Australian mining and minerals processing sector, there remains a great deal of diversity in reporting con
Jan 1, 2004
-
Total Integrated System Simulation for Master Planning of the Dalrymple Bay Coal Chain
By B Olsson, R Norman, M Volz
Australia has seen unprecedented demand for coal exports in the last ten years and this demand is set to expand further still according to many analysts. This rapid increase in demand has placed press
Sep 26, 2011
-
Character of Simulation Material of Coal – Rock and Gas Solid-gas Coupling and Engineering Application
By C Bie, S Li, P Xiao, P Zhao, H Lin
"Based on solid simulation material research, the simulation conditions for methane and coal solid-gas coupling were obtained using solid-fluid coupling theory. Using sand as the aggregate and paraffi
Aug 31, 2015
-
Design of Yield Pillars for Improved Stability of Colliery Roadways
By Bhattacharyya A. K
A major constraint on sustaining high rates of production in the collieries of the Southern Coalfield of New South Wales is the inability to develop panels fast enough to match the rates of extraction
Jan 1, 1995
-
Designing Energy Efficiency Assessments that Work - Thiess Australian Mining û Case Study
By P Crittenden
Thiess Pty LtdÆs Australian Mining business unit used 7.6 PJ of energy in the 2007/2008 financial year. This represented more than 85 per cent of Thiess Pty LtdÆs total energy use and therefore meant
Jan 1, 2009