Development and Implementation of Major Hazard Management Plans
By D Hume
During 2001 the Ridgeway Gold Mine, driven by company initiatives and recent NSW legislation (General Rule 2000), developed and implemented Major Hazard Management Plans to control significant hazards
Jan 1, 2002
-
A Capitals Based Approach – Leading Innovation in Planning for Life-of-Mine Sustainability
By L Dyer, A Keith, G D. Corder
As mining activity moves to remote and less developed locations globally, a holistic approach to mine development is fundamental for achieving a balance between strong financial returns and corporate
Jul 16, 2014
-
Can robots break the drill and blast bottleneck in underground roadway development in hard rock?
By M Berner, N A. Sifferlinger, E Fimbinger
Today, the advance rate of underground roadway development by drill and blast operation is limited by the need to ventilate the toxic blast fumes after each cycle. In deep mines this usually is only p
Sep 1, 2024
-
Case study – Ernest Henry Mine: designing step out zones in an inclined sub-level cave
By P Nichols, C te Kloot, A Harrison
Ernest Henry mine (EHM) is a sub-level caving operation located in north-west Queensland, Australia. Located below a previously mined open pit, the underground operation ramped up production to 6.8Mt/
Nov 21, 2018
-
Paving the Future - A Case Study Replacing Truck-and-Shovels by Shovel-and-Conveyor Continuous Mining at Carajas Open Pit Mines
By C T. Senra, A Souza
Increasing fuel prices, unavailabilty and high prices of tyres have imposed tremendous challenges for large open pit operations. Carajßs open pit mines, one of the largest iron ore projects in the wor
Jan 1, 2009
-
Critical Assessment of Machine Learning Algorithms as Estimation Techniques for a Polymetallic Ore Deposit
By D Misra, R Ganguli, S Bandopadhyay
The objective of this paper is to assess the accuracy and applicability of recent state-of-art methods such as the machine learning algorithms (MLA) for mineral resource estimation. Conventional metho
Sep 26, 2011
-
Water as Risk in Mining – Media Analysis and the RISKGATE Body of Knowledge
By J Harris, M Shi, S Vink, P A. Kirsch
Across the life-of-mine, water is both an essential commodity to mining, and one of the most significant hazards. In Australia, a land of drought and floods, availability of water is a critical strate
Jul 16, 2014
-
Olympic Dam open stope observations, tactics and characterisation
By G Capes, L Morizzi, N Mitkas, E Jones, D Grant
This paper describes the mining setting for the sub-level open stoping (SLOS) mining method used at Olympic Dam (OD), and investigates the range of stope performance conditions encountered over 30 yea
Mar 15, 2021
-
Designing Flotation Cells For Optimised Flow Dynamics
By T Niitti, J Turunen, P B, A Rinne
In todayÆs marketplace, with high metals prices, many operations are faced with the challenge of improving recovery in the particle size ranges which are normally difficult to recover. This presentati
Jan 1, 2006
-
Mentoring and Your Career
Young professionals are riding the current wave of high demand for their services and relatively little competition for placements. The attraction and retention of quality incumbents has therefore bec
Jan 1, 2006
-
Conveying of Paste Backfill ù Focusing on Zero Harm on the Environment at Cannington
The BHP Billiton Cannington Mine uses paste as the principal method of backfill. The paste consists of mine tailings and cement. The pastefill process at Cannington includes a surface plant where the
Jan 1, 2002
-
Sunrise Dam Short- to Long-Term Ventilation Planning
By M Podreka, P Merry, L van den Berg
Anglo Gold AshantiÆs Sunrise Dam operation is located in Western Australia approximately 55 km south of the town of Laverton. Currently, the mine is producing from both its open pit and underground op
Jul 1, 2013
-
Implementation of an Expert Control and Online Image-Based Oversize Detection at the Pilbara Iron Tom Price Operation (c28c0d5f-5fb9-42f8-9b13-de3161c056c3)
By M Wortley, J McKay, D La Rosa, O Guyo
It has been a generally held concept that crushing operations were, by their nature, too simple to benefit from the implementation of advanced process control. The commissioning of an OCS¬ expert cont
Jan 1, 2006
-
Investing in new process improvement technology: reducing the risk of implementation – a way forward
By S H. Algie, E J. Knoblauch, I A. Lovatt, S G. Doig
Mill operating teams are expected to engage in a perpetual quest for process improvement – pushing the boundaries of practical process limits and testing new technology to achieve the next step-change
Aug 29, 2018
-
Confirmation of Multiseam Extraction Rules for Black Rock Manganese Operations, Assmang, Northern Cape, South Africa
By M K. C Roberts, M G. Magwaza, J W. L Hanekom, P Piper, R Lousteau
Due to the perceived potential to extract the second economic manganese seam at its Black Rock Operations in the Northern Cape Province, South Africa, Assmang commissioned an investigation with respec
Nov 5, 2014
-
In-Line Pressure Jig Preconcentration Plant at the Pirquitas Mine
By A H. Gray
Gekko Systems Pty Ltd engaged in the test work, design, manufacturing and commissioning of the pre-concentration plant at Silver Standard Resources Inc’s Pirquitas mine in the north western Jujuy prov
Aug 8, 2011
-
Rock Bolts for Permanent Tunnel Lining
By J de Witte
When used in suitable ground conditions, rock bolts can have advantages over other permanent tunnel lining solutions. Permanent rock bolts offer flexibility in tunnelling profile and rapid rock bolt i
Mar 8, 2011
-
Integrating Native Title Agreement Implementation with the Culture and Operation of a Business to Deliver Social Licence and Commercial Licence to Operate
Rio Tinto Iron Ore is currently working towards finalising comprehensive Native Title land access agreements, which cover all of the current eleven mines and infrastructure owned and operated by the c
Jun 1, 2010
-
Transforming dust control – lessons from tunnelling
By A De, B Palmer, rade, P Stowasser, A Fanning
Mining and tunnelling share many commonalities (eg confined working environments, excavation equipment and processes), but of significance is an overarching commitment to provide safe work conditions
Apr 16, 2024
-
Optimisation of Wash Water on an Iron Ore Spiral to Improve Grade
By C M. Ramotsabi, F Bornman, W Erasmus
Spiral concentrators are gravity based separation devices used for the preparation of coal, iron and heavy mineral ores (Wills, 1992). Gravity concentration remains the main separation method for fine
Jul 13, 2015