Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Human Resources and Exploration Economics in a Developing Pacific Rim
A vital ingredient in ensuring that metals exploration companies, working in the developing countries of thePacific Rim, support the development of national geologists is making such a learning progra
Jan 1, 1995
-
Paleodepth Studies of Epithermal Au-Ag Deposits in the North Island of New Zealand û Progress Toward a 4D Model
By R L. Brathwaite
Previous paleodepth studies of low-sulphidation epithermal Au-Ag deposits in the Coromandel region indicated that economic gold mineralisation was generally limited to a depth zone of 100 to 400 m bel
Jan 1, 2003
-
Understanding Damage Source Mechanisms in a Caving System Using Virtual Reality Scientific Visualisation
By B K. Hebblewhite, F T. Suorineni, J D. Tibbett
Block caving is an underground mining method that can provide high production capacities at low operating costs. This enables the profitable extraction of massive, low-grade orebodies and attracts ind
May 9, 2016
-
Potential for the Utilisation of Micro-Organisms in Gold Processing
By D C. McPhail, S L. Rogers, J Brugger
Using iron- and sulfur-oxidising bacteria to catalyse the breakdown of sulfides that host the gold is an important biological method for the pretreatment of refractory gold ores. Following this biolog
Jan 1, 2007
-
Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessment
By A Kemp, I Taylor, S C. Lamoureux
Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo
Jul 24, 2017
-
Quality Control Procedures in a Large Iron Ore Open Pit
By K Firmin
The Mt Tom Price orebody of Hamersley Iron Pty Limited consists of a folded hematite - shale sequence capped by a layer of goethite. Consequently, variations in iron content occur within the ore body,
Jan 1, 1971
-
Stope Filling with Thickened Classified Flotation Tailings
By Yates C, Gillie E. W, Finucane K. J
During the year 1940 a complete investigation was made of the whole of the stoping operations throughout the Great Boulder Mine and, as a result, it was decided to convert some of the existing shrinka
Jan 1, 1945
-
Mineralogical and Geochemical Analysis of Ironsand at Taharoa, New Zealand
By S Jokanovic, J L. Mauk
The Taharoa ironsand deposit covers approximately 16 km2 and is located 144 km south of Auckland on the west coast of the North Island, New Zealand. The heavy mineral-rich sands predominantly contain
Jan 1, 2003
-
A Convenient Method for Survey of Stopes and Development
THE most important part of the routine survey work on a mine is the keeping up-to-date of plans and sections showing progress of stoping and development work, and the direction of the latter for the p
Jan 1, 1928
-
Iron ore grade modelling using geostatistics and artificial neural networks
By B C. Sarkar, D Ray, V Sarkar, P K. Sinha, R K. Singh, A Kumar
Estimation of iron ore grade distribution has been attempted using geostatistics and artificial neural network (ANN) based models for a banded iron formation (BIF) type iron ore deposit of East India.
Jul 24, 2017
-
The Petrology and Paleoenvironmental Setting of Coal at Waitewhena Coalfield û Relationships Between Paleoenvironment, Coal Type and Analytical Data
Lower Miocene Maryville Coal Measures at Waitewhena Coalfield, in the Taranaki coal region, include seams of sub-bituminous coal up to 4 m thick. During coalfield exploration Fletcher Challenge Ltd dr
Jan 1, 1987
-
Wireframe-Free Geological Modelling – An Oxymoron or a Value Proposition?
By E J. Cowan
Efficiency demands that mine geologists devote the most time to tasks where they can have the biggest effect on production. One of the most time-consuming tasks is geological interpretation of the ore
Aug 22, 2011
-
Long-term Stability of Mine Tailings, Macraes Mine, Otago: Comparison to a Geological Analogue
By D Craw
Bulk ore tailings from the Macraes gold mine gold extraction process are stored in a large (ca 0.6 km2, 80 m deep) mixed tailings impoundment whose pH is maintained near 8 by natural rock neutralizing
Jan 1, 2000
-
Three-Dimensional Hydromechanical Simulation for Large, Faulted Pit Slopes
Owing to improvements in computer capacity, it is now possible to undertake fully coupled or partially coupled, three-dimensional (3D) hydromechanical Finite Element (FE) simulation of mines, includin
May 1, 2010
-
Failure of Aluminum to Prevent Experimental Silicosis
By King E. J
Department of Pathology, British Post-graduate Medical School, London:The experiments here recorded were devised and carried -out during the last two years in an attempt to corroborate the important w
Jan 1, 1945
-
High-Si Rhyolites and Shoshonitic Volcanics - A Late Cretaceous Bimodal Association, Noumea Basin, New Caledonia
The transgressive sedimentary sequence of the Noumea Basin contains rhyolitic lavas and less voluminous mafic and intermediate volcanics of shoshonitic affinities which erupted simultaneously during t
Jan 1, 1995
-
The Crushing and Conveying Operation at the Martha Mine
In November 1999 Waihi Gold Mining Company commissioned its new crushing and conveying plant used to transport both ore and waste from the Martha Mine to its ore processing plant and also its tailings
Jan 1, 2001
-
Driving productivity by increasing feed quality through application of innovative Grade Engineering® technologies
By S G. Walters
The minerals industry is facing a productivity and investment crisis. The ‘Millennium Super Cycle’ from 2003–2011 was an unprecedented period of growth and investment resulting in increased throughput
Sep 20, 2017
-
Management of Seismicity at the Beaconsfield Gold Mine, Tasmania
By A R. Penney
Since mining-induced seismicity first became apparent at the Beaconsfield Gold Mine in 2002, there has been an ongoing program of geotechnical investigations to understand the phenomenon and allow for
Jan 1, 2008
-
Opportunities for Integrated Mine Management to Minimise Risk and Create Value
By D Rattray, D Macfarlane, I Robb, N Halpin, G T. Dale
Mining faces many environmental, social and regulatory liabilities of which water management is just one. Others include site rehabilitation, carbon emissions, biodiversity offsets, strategic cropping
Nov 26, 2013