Search Documents
Search Again
Search Again
Refine Search
Refine Search
- 
                    
                Improving Truck-Shovel Energy Efficiency Through Discrete Event ModelingBy K. Awuah-Offei
Energy efficiency has become significant due to cost and environmental considerations. Comminution and material handling have been identified as the two most energy intensive processes in mining. The
Jan 1, 2012
 - 
                    
                VertiMill« - Development of Circuit Survey and Performance Evaluation ProtocolsBy K Kermanshahi, J Allen, MáHilden, M Powell, S Mwansa, S Palaniandy
Approximately 420 VertiMills« (VTM) have been installed in mineral processing plants throughout the world, mainly in tertiary and regrind applications plus several in secondary grinding duties. Metso
Jul 15, 2013
 - 
                    
                Operating Ideas That Have Saved Me Some Bucks-Gold Milling at RayrockBy Debbie Laney
DOUG HALBE: Second in our quick run-through on "Operating Ideas That Have Saved Me Some Bucks," was Debbie Laney of Rayrock Mines. Debbie apologizes. She can't be here. But she said, "Doug, don&a
Jan 1, 1998
 - 
                    
                A Case History of Geochemistry and Prospecting in North-West QueenslandBy Branagan D. F
The geology of the area studied is briefly described, together with the prospecting methods used in the search for copper, lead, zinc and uranium ore bodies.Four prospects, Mt. Corella, Yanasinga, Law
Jan 1, 1960
 - 
                    
                The ?Other Class? Of Pipeline CoatingsBy Gerard de Vries
pipeline industry and are still growing in size. Liquid epoxy and polyurethanes are an excellent choice for whatever the aggressiveness of the substance transported and whatever the harmful outside in
Jan 1, 2006
 - 
                    
                On Rock Failure Criteria for Coal Measure RocksBy Murali Gadde
Design of underground excavations in coal mines involves two major tasks: estimation of stresses and determination of rock mass strength. Owing to the complicated nature of rock mass, progress in its
Jan 1, 2007
 - 
                    
                Pillar Design Considering the Plastic Behavior of the Coal SeamBy Andre Zingano
The variation in pillar behavior at underground coal mines working in the Bonito coal seam is observed in both research and mining company case studies. There is no consistency in pillar behavior, as
Jan 1, 2012
 - 
                    
                Ventilation System Operating Cost Comparison Between A Conventional And An Automated Underground Metal MineBy C. K. Kocsis, S. Hardcastle
Mine ventilation, requires electricity to operate the fans and fossil fuel for heating. Typically, this accounts for approximately 40% of the overall underground energy consumption. This is considerab
Jan 1, 2002
 - 
                    
                Analysis and Optimisation of life-of-Mine Haulage Cost using SimulationBy Niklas Frank
Ore and waste transports form an integral part of any mining operation and represents a substantial portion of the mine´s total operating cost. Mine layout, truck fleet and size, production rates, hau
May 1, 2003
 - 
                    
                Direct Pressure Alkaline Leaching of Scheelite Ores and Concentrates Mining, Metallurgy and Exploration (Springer)By António Fiúza, Anthony Danko, Patrícia Leitão, Aurora Futuro, Cristina Vila, Lurdes Dinis
The average global recovery rates for processing scheelite ores by physical methods are normally in the range 50 to 70%, and it is problematic to attain a minimum grade of 60% WO3 in the concentrates
 - 
                    
                Minor Pyrometasomatic Mineralization in the Wuuluman Granite, Central Western New South WalesThe occurrence of molybdenite in a small shaft in the western margin of the Wuuluman Granite in central western New South Wales is noted. Full petrographic and mineragraphic descriptions are given of
Jan 1, 1968
 - 
                    
                Metallurgical Considerations For Recycling Siliceous- Bearing Materials In The Mitsubishi Continuous Copper ConverterBy Fumito Tanaka
The Mitsubishi Process is the sole pyrometallurgical process for the continuous production of blister copper from copper concentrates. Continuous converting originates from the application of the pro
Jan 1, 2005
 - 
                    
                Mejorando la eficiencia de la operación mediante el control avanzado en MoliendaBy Juan Kobashicawa, Bernardo Falcón
En este trabajo se explican los controles automáticos desarrollados (In-House) e implementados en el circuito de Molienda de Compañía Minera Antamina, el cual abarca Molinos SAG, de Bolas y los Hidroc
Sep 1, 2017
 - 
                    
                Banquet, Train Ride Highlight Hall of Fame WeekendBy Tim O’Neil
Dressed in black tie and Victorian attire, some 200 people came to Leadville, CO, for a September weekend featuring a National Mining Hall of Fame and Museum (NMHF&M) induction banquet and a scenic mo
Jan 1, 2005
 - 
                    
                Immediate Internet distribution of vibration data from the historic Byward Market, Ottawa, CanadaBy Robert Lee, Jeff Corace, Rob Cyr
Blasting in the heart of the historic Byward Market District of Canada’s capital, Ottawa, presents a unique set of challenges. The obvious difficulties arising on projects requiring blasting within 3
Jan 1, 2006
 - 
                    
                Analyzing the Load-Transfer Behavior (T-Z Curve) for Instrumented Test Piles Driven in Clayey SoilBy Murad Y. Abu-Farsakh
This paper presents the analyses of load-transfer (t-z) behavior of twelve prestressed concrete (PSC) instrumented test piles that were driven in different locations of Louisiana. The load transfer me
Jan 1, 2018
 - 
                    
                Fully-Grouted, High-Strength, Mechanical Shell Tensioned Bolt Improves Pittsburgh Seam Primary Roof SupportBy Daniel Su
Approximately 90% of the primary roof bolts used in CONSOL?s Pittsburgh seam coal mines is 2-piece, 8-foot long, 7/8? (or ¾?), high-strength, resin assisted, mechanical shell tensioned bolt. The remai
Jan 1, 2007
 - 
                    
                The Evolution of Falcon Continuous Concentrators at Tantalum Mining Corporation of CanadaBy Claude Deveau
"With ever decreasing feed grades, finer mineralogy and increased demand for product, it became obvious that a major step in equipment performance was required to reduce operating costs and increase p
Jan 1, 2000
 - 
                    
                Managing The Geotechnical And Mining Issues Surrounding The Extraction Of Small Pillars At Shallow Depths At Xstrata Coal South Africa ? SynopsisBy S. Z. Pethö
Pillar extraction at shallow depths with small pillars that were not originally intended for secondary extraction can provide a huge benefit to the coal mining industry in those areas where a signific
Jan 1, 2012
 - 
                    
                Tanana River Bulkhead Expansion, Flexibility In Construction; Key To Arctic Dock ConstructionBy Roy Peratrovich
An innovative cost-saving design for a 1,100 ft bulkhead on the Tanana River at Nenana in central Alaska won Alaska Construction & Oil magazine's Construction Achievement Award. The designers uti
Jan 1, 1985