Search Documents

  • SME
    Integrating Hydro-Fracturing Technology And Geophysics Into 3d Mapping And Extraction Of Metals In Heap Leaching; Hydro-Jex And High Resolution Resistivity ?.

    By Seal. Thom

    Large heap leach operations around the world contain significant under-leached metal values that present recovery challenges to operators. The first challenge is to find the location of the highest

    Jan 1, 2008

  • ISEE
    Alternative Velocity Loading Techniques and Detonations in a Production Environment

    A simple and cost effective technique to increase fragmentation and burden velocities without making major modification to the overall blast design is with ALTERNATE VELOCITY LOADING OR BOOSTERING OF

    Jan 1, 1989

  • IIMP
    El rol de los circulos de mejoramiento continuo en las operaciones mineras

    By Wilson Bardales

    El presente trabajo describe la experiencia de la Gestión de la Calidad en la Cía. Minera Poderosa S.A., específicamente en el rol que desempeñan los Círculos de Mejoramiento Continuo (CMC´s) como un

    Sep 12, 2005

  • AUSIMM
    Tellurium in the Ores of the Hauraki Goldfields

    New Zealand has often been quoted by metallurgists and others as one of the countries in which Tellurium is found, and locally it has been recorded that appreciable quantities of tellurium have been m

    Jan 1, 1901

  • NIOSH
    Emerging Technologies And The Future Of Geotechnical Instrumentation

    By E. L. McHugh, J. M. Girard

    This paper discusses the results of two recent case studies in which high-tech prototype instruments were used. The first case study describes the results of a ground-based hyperspectral imaging tool

  • ISEE
    Predicting the Envelope of Damage Resulting from the Detonation of a Confined Charge (aa576ad1-736a-4e7e-9977-8fe1a93c21b3)

    By Jason M. Ryan, T Michael LeBlanc, John H. Heiiig

    Drill trajectory deviation is a recurring problem in the Mining Industry retreat stoping operations. As a result of this deviation, it is quite concevable that 60 kg (165 mm 0) and 103 kg (203 mm 0) e

    Jan 1, 1995

  • CIM
    Agnico-Eagle Laronde Plant: Metallurgical Challenges Present and Future

    By Jean Cayouette, Paul Blatter, Paul Cousin

    "The Laronde mill was commissioned in 1988 and has been treating the Laronde Penna ore since 2000. The Laronde plant, situated in the Abitibi region of Quebec, has experienced mill expansions to accom

    Jan 1, 2011

  • SAIMM
    Practical Aspects Of The Ventilation Of High-Speed Developing Tunnels In Hot Working Environments

    The excavation of ramps and tunnels often requires high-speed development with (or without) the use of high-energy mining equipment such as loaders, dump trucks, TBMs and roadheaders. This high-spee

    Jan 1, 2000

  • TMS
    Measurement Of Natural Convection In GA Melts With And Without Applied Magnetic Fields

    By B. Xu

    Keywords: Magnetic damping, g-jitter, Hot-film anemometry Results from an experimental study on natural convection induced by temperature gradient in molten gallium contained inside a rectangular

    Jan 1, 2005

  • SAIMM
    Automated Structure Mapping Of Rock Faces

    By M. K. Elmouttie, G. V. Poropat

    Mapping of exposed rock walls provides data on geological features such as joints, bedding planes, faults etc critical to the economics and the safety of mine operations. Traditional, manual methods o

    Jan 1, 2006

  • AUSIMM
    MinerÆs Rights: Legal and Illegal Mining by Automatic Citizens under the present Mining Act

    Every automatic citizen is an automatic recipient of a miner's right under the present Mining Act (Chapter 195), but this alone does not entitle any automatic citizen to mine for minerals on

    Jan 1, 1991

  • SME
    Evolution Of Controlled Blasting Practices Dragon Products Company, LLC Quarry Operations, Thomaston, Me

    By K. Boakye

    This paper presents the results of a review of historic blast design practices at the Dragon Products Company, LLC (Dragon) Quarry Operation, along with the results of two different blast design vibra

    Feb 27, 2013

  • AUSIMM
    The Problem of Surplus Productive Capacity in the Coalmining Industry

    The coalmining industry in most countries has, at various times, suddenly been confronted with a decrease in demand for coal. Readjustments made to reduce productive capacity to match the reduced dema

    Jan 1, 1961

  • AUSIMM
    Underground Organization

    IN the underground department of a mine, we may fairly say that "good management is based upon three elementals: first, sound engineering; second, proper coordination and efficiency of every huma

    Jan 1, 1912

  • AIME
    Municipal-water Needs vs. Strip Coal Mining

    By Gregory M. Dexter

    Recent litigation in Pennsylvania between three coal-mining companies and a private water company resulted in the payment by the coal companies of the equivalent of about $500,000 to buy a new water s

    Jan 1, 1949

  • IIMP
    Variación de parámetros de resistencia y deformabilidad de macizos rocosos basándose en dos criterios de falla y la influencia de la voladura: Aplicación a la minería superficial evaluando geostadísticamente la probabilidad de ruptura y la estabili

    By Luis Martín Tejeda

    El presente texto señala cómo los parámetros geotécnicos de resistencia y deformabilidad pueden generar mayor confiabilidad en un estudio técnico. En este sentido, la literatura geotécnica indica que

    Sep 19, 2006

  • SAIMM
    Spinel Removal From PGM Smelting Furnaces

    By A. R. Barnes, A. F. Newall

    Keywords: Pyrometallurgy, furnace, smelting, spinel, PGM, phase diagrams As Merensky reef ores are replaced by UG2 ores, chromium levels in PGM smelting furnace feeds have steadily increased. Inc

    Jan 1, 2006

  • AUSIMM
    Treatment of Wolfram, Bismuth, and Molybdenite Ores at Burma Queensland Corporation Mill, Wolfram, N.Q.

    THE old mill erected by the .Irvinebank Company consisted of 10 heads of stamps (850 lb.), rock-breaker, Hartz jig, two Krupp tables, two Luhrig vanners, three sand-pumps, one mixer; six flotation ves

    Jan 1, 1920

  • DFI
    Pittsburgh Steelers Stadium - Deep Foundations Case Study

    By Larry Rayburn

    In the spring of 1999, construction commenced on the new Steelers Football Stadium in downtown Pittsburgh, Pennsylvania. Richard Goettle, Inc. (RGI) was the successful bidder to install the specified

    Jan 1, 2001

  • IIMP
    Monitoreo y control de sismicidad inducida en la U.M. El Porvenir

    By Aquiles Vivar

    Ante los problemas de sismicidad inducidos por el sistema de minado en la Compañía minera Milpo, se planteó una solución a través del sistema de monitoreo sísmico único, donde se da una distribución

    Sep 9, 2007