Search Documents

  • SME
    Design Risk Mitigations for Contract CQ028 of the East Side Access Project

    By Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso

    INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p

    Jan 1, 2007

  • SME
    A Skeletal Model For An Intelligent And Integrated Design System For Underground Coal Mines

    By A. J. Basu

    An overview of the evolution of computerized mine planning and design has been given, emphasizing the need for a knowledge-based system for planning and design of underground coal mines. An outline fo

    Jan 1, 1991

  • SME
    WROC ? An Improved Waste Rock Oxidation Code

    By S. Sunkavalli

    Acid rock drainage (ARD) is produced when sulfides are exposed to oxygen and water. Oxidation reactions typically result in a depression of pH and leaching of solutes and metals. Many oxidation models

    Feb 27, 2013

  • NIOSH
    IC 8034 Bibliography Of Bureau Of Mines Articles On Thermodynamics Of Petroleum Constituents And Related Compounds: January I, 1944-December 31, 1960 ? Introduction

    By J. P. McCullough

    In 1943, the Federal Bureau of Mines began a program of thermodynamic investigations of petroleum constituents and related compounds. These systematic, long-range studies, which were conducted in the

    Jan 1, 1961

  • AUSIMM
    Exploration for Platinum Group Element Deposits in Mafic and Ultramafic Rocks

    Platiniferous horizons such as the Merensky Reef that are mined chiefly for their PGE contents constitute one end member of a continuum of Ni-Cu-PGE sulfide deposits; Ni-(Cu) sulfide deposits in which

    Jan 1, 2002

  • AUSIMM
    An Experimental Appraisal of the Beneficiation of Fine Coal by Selective Agglomeration

    By Brown A

    An experimental evaluation of a selective agglomeration process in which an agglomerated coal rich phase was produced as a result of mixing light oil to various raw coal slurries is described. The ben

    Jan 1, 1977

  • DFI
    Eglinton Crosstown, a New Step in Toronto’s Subway System

    By Lars Richter, Franz-Werner Gerressen

    "The Eglinton Crosstown Line was conceived as the Eglinton Crosstown LRT, a partially underground light rail line, announced in 2007 as part of the Transit City plan, which included the implementation

    Jan 1, 2017

  • IIMP
    Aplicación de un sistema de gestión estratégico en las operaciones de la mina San Rafael – MINSUR. S. A

    By Juan Lizana

    El presente trabajo describe el proceso del sistema de gestión estratégica en la mina San Rafael, Puno. En este sentido, la empresa como parte introductoria de sus operaciones, ha propuesto la solució

    Sep 12, 2005

  • SME
    The Price Is Right?Planning Large Water Tunnel Contracts In New York

    By Christian Maguire

    Tunnel contracts in New York have in recent years had few bidders with the bids received being much higher than anticipated. Since 9/11, security has become a key issue in planning key infrastructure

  • DFI
    Estimation Of Settlements Of Piles In Group

    By Kazimierz Gwizdala

    In the paper the method for estimation of settlement of vertically loaded piles in a group is presented. The method is generally based on the hybrid procedure with non-linear solution for single piles

    Jan 1, 2002

  • IIMP
    The sleeper pit lake - a successful model for pit closure

    By Martin Williams

    During the coming decade, many of the first generation of ‘super-pit’ gold and base metal mining operations in North and Latin America will reach the end of their economic lives. The closure of such p

    Apr 22, 2003

  • AUSIMM
    Mineralisation and Alteration at El Pe±on Mine, Northern Chile

    The El Pe±on gold-silver deposit comprises four epithermal, low-sulfidation veins, which contain 2.9 million oz Au and 48 million oz Ag. Provisional data on alteration mineralogy, fluid inclusions, an

    Jan 1, 2002

  • NIOSH
    RI 8730 Sealing Openings in Abandoned Mines by Pneumatic Stowing

    By Slavoljub D. Maksimovic

    The Bureau of Mines, through a memorandum of agreement with the State of Ohio, tested a method of constructing seals in abandoned mine openings in Ohio by means of pneumatic stowing of crushed limesto

    Jan 1, 1982

  • CIM
    Rare Earth and Thorium Recovery in Canada

    By John R. Goode

    "The year 2011 witnessed a major surge in rare earth prices as China, supplier of +95% of the world’s rare earths, reduced export quotas and increased export taxes and duties. In response, companies a

    Jan 1, 2012

  • AUSIMM
    Hismelt« - Direct Ironmaking Becomes a Reality

    Following extensive trials on a 100 000 tpa Research and Development facility at Kwinana, Western Australia, Hismelt Corporation (wholly owned by Rio Tinto) are confident of the future commercial su

    Jan 1, 1999

  • IIMP
    Proyecto de optimización de procesos Geologia, planeamiento, mina y mantenimiento

    By José Porras

    El presente trabajo señala el proceso de optimización en la mina a través del área de Tecnología de la Información, superintendencias y las áreas directas de las operaciones. En ese sentido, durante e

    Sep 9, 2007

  • SAIMM
    The Strategic And Tactical Value Of A 3D Geotechnical Model For Mining Optimization, Anglo Platinum, Sandsloot Open Pit

    Sandsloot open pit is situated on the northern limb of the Bushveld Complex, 250 km north east of Johannesburg, South Africa. Sandsloot is currently the largest open pit platinum mine in the world and

    Jan 1, 2006

  • SME
    Anticipated Behavior Of Silty Sands In Tunneling

    By Ronald E. Heuer, Debra L. Virgens

    INTRODUCTION Behavior of clay soils in response to tunneling is reasonably well understood by reference to the tunnel stability factor NT = Pz/su (Peck, 1969; Heuer, 1974). With this analysis tool,

    Jan 1, 1987

  • DFI
    Value Engineering – Design Risk and Reward at Major Sport Arena Projects

    By Peter Faust, Jeremy Zorne, Timothy Siegel, Diane Fiorelli

    Professional sport venue construction follows a very simple rule. Once the decision has been made to move the team to a new place, construction shall begin immediately, so that not more than one or tw

    Jan 1, 2018

  • NIOSH
    IC 8399 Computer Usage For Evaluation Of Design Parameters And Cost Of Heat Exchangers - With No Change In Phase And Tube Side Pumping Costs As Prime Parameters

    By P. R. Jones

    A computer program was written for design and cost of a shell and tube heat exchanger in which the total cost, which includes annual fixed charges and annual operating costs, was minimized. The progra

    Jan 1, 1969