Search Documents

  • AUSIMM
    The Barewood-Hindon Vein System: A Regionally Extensive Normal Fault-Hosted Gold Deposit in the Otago Schist

    By D Craw, J Youngson

    Recent exploration for mesothermal gold deposits in the Otago Schist has focussed largely on extensions of, or analogies to, the reverse fault-hosted Hyde-Macraes Shear Zone deposit. Abundant normal f

    Jan 1, 2002

  • SAIMM
    Ground Control At Leinster Nickel Operations (0c0084dd-072a-410b-a5aa-88a595999659)

    Leinster Nickel Operations, located in Western Australia, consists of an underground and three open pit mines in relatively adverse ground conditions. This paper reviews our ground control practices i

    Jan 1, 2006

  • CIM
    Wireless Communications in Mineral Processing Applications

    By Peter Metcalfe

    "Wireless communication in the mineral processing environment is not as simple as it is in the home or office environment. The correct design of a wireless network in the mineral processing environmen

    Jan 1, 2014

  • AUSIMM
    Paper No. 168. Presidential Address. Progress of Mining in Western Australia.

    GENTLEMEN, lt is with much pleasure I meet you tonight at this the second meeting of the Australasian Institute of Mining Engineers, held in Western Australia, and I sincerely thank you for the honour

    Jan 1, 1909

  • CIM
    Reverse Osmosis Desalination Plant at the Bougrine Zinc-Lead Mine, Tunisia

    By Ammar Henchiri, Godfrey McDonald

    "Breakwater Tunisia S.A.’s Bougrine mine is located in a semi-arid region of Tunisia characterized with Triassic salt domes. Due to extensive agricultural land-use in the mine area, a zero-discharge t

    Jan 1, 2003

  • CIM
    Electrical Drives for Large Grinding Mills

    By A. G. Spencer

    "The horsepower required to drive large grinding mills has increased dramatically during the past ten years. Limitations on the amount of power which may be transmitted by a single gear and pinion hav

    Jan 1, 1972

  • AUSIMM
    Considerations for Effective Gold Process Development

    By A Giblett, R Dunne, D Appelhans

    There are a number of hurdles that must be negotiated in order to design an effective gold ore treatment facility such that the expectations forming the basis of project economics are valid and can be

    Jul 15, 2013

  • AUSIMM
    Avoiding Unnecessary Drilling

    The extra information brought by further drilling may seem necessary to achieve control over block grades if elementary estimation techniques are used. However a geostatistical study of an Australian

    Jan 1, 1975

  • NIOSH
    Technology News - No. 503 - Hazcom Helper Compliance Tool For MSHA Rule 30 CFR Part 47

    Develop tools that mine personnel can use to comply with 30 CFR,Part 47. Background The new MSHA rule, 30 CFR, Part 47 (also known as the HazCom rule), requires all mines to develop a written pr

    Mar 1, 2003

  • NIOSH
    IC 8755 Design Guide For Metal And Nonmetal Tailings Disposal

    By Roy L. Soderberg

    The Bureau of Mines has conducted substantial research on the design, construction, and operation of metal and nonmetal tailings ponds. This design guide, like related Bureau publications that precede

    Jan 1, 1977

  • NIOSH
    RI 9077 - Acoustic Emission Monitoring of Fracture Development

    By Sterling J. Anderson

    Through the use of nondestructive testing techniques, the Bureau of Mines is pursuing a goal of improving the efficiency of the rock excava-tion process. Toward this end, 44 laboratory tests were cond

    Jan 1, 1987

  • DFI
    "Value Engineering" In United States Of America

    By Maral Papazian Bedian

    Construction contracts in the USA contain the clause "Value Engineering" ? an interesting and curious clause allowing contractor initiated design changes. Misleading is the interpretation of value eng

    Jan 1, 2002

  • SME-ICGCM
    Seismic Events In German Hard Coal Mining (927aed19-540f-49d6-8a7e-8eb1cd5cfc71)

    By Axel Preusse

    Underground coal mining can cause seismic events. There is currently no way to predict such phenomena reliably, in particular stronger events. That is why, according to the current state of the art, e

    Jan 1, 2009

  • AUSIMM
    Production Drill and Blast Practices at Ridgeway Gold Mine

    Newcrest Mining Limited (NML) owns and manages the Ridgeway Gold Mine (RGM) located outside Orange in the state of New South Wales. RGM is a new underground sublevel caving (SLC) operation that is ram

    Jan 1, 2002

  • AUSIMM
    Constitutional Features of the Mount Isa Sulphide Ores and Their Interpretation

    Some 800 analyses for Cu, Zn, Pb, Ag, Fe, S, CaO, MgO, C02, Si02 and Al203 were used to examine the elemental constitution of the Mount Isa ores, and, for comparison, those of the Northern Leases area

    Jan 1, 1963

  • DFI
    Pile Monitoring, Testing, And Data Processing: New Developments And Remaining Issues

    By Alain E. Holeyman

    After scoping out the objectives of this general report, the report reviews the three assigned main themes addressed by the papers submitted to the session: pile monitoring, testing, and data processi

    Jan 1, 2006

  • NIOSH
    IC 9097 Bureau Of Mines Research Into Reducing Materials-Handling Injuries

    By Richard L. Unger

    The Bureau of Mines entered into a cooperative agreement with an eastern Kentucky coal mining company to comprehensively redesign the flow of equipment and supplies throughout its underground mines. I

    Jan 1, 1986

  • CIM
    Dynamic Modeling and Virtual Prototype Simulation of the GAP-Oil Sands Interactions

    By Samuel Frimpong

    The interaction of oil sands with a ground articulating pipeline (GAP) system has been simulated with the dynamic model established in this work by combining the multi-body and soil dynamics with the

    May 1, 2004

  • SME
    Construction Phase Services for Australian and North American SEM Tunneling - NAT2024

    By Yun Bai, Sarah Wilson, Michael Salcher, Mark Trim

    Over the last decade more than 62 miles (100 km) of civil transport tunnels were constructed in Sydney, Australia, using the sequential excavation method (SEM). The WestConnex motorway tunnels, each s

    Jun 23, 2024

  • DFI
    Recent Advances In Quiet & Vibration-Less Steel Pile Installation & Extraction

    By Ray. K. Filip

    The concept of installing a steel sheet pile retaining wall into the ground by "pressing" has resulted in the development of various equipment solutions over the last thirty years e.g. Taylor Woodrow

    Jan 1, 2006