Search Documents

  • NIOSH
    RI 6029 Pyrolysis Of Five Salts Of Yttrium, Lanthanum, And Cerium

    By Louis P. Domingues

    As part of a study on high-temperature ceramic materials, the ammonium sulfate, carbonate, nitrate, oxalate, and sulfate salts of yttrium, lanthanum, and cerium were analyzed thermogravimetrically. Th

    Jan 1, 1962

  • DFI
    Untangling The Octopus" Bored-In Pile Construction - On Nysdot Project D256424 Ithaca, New York - Executive Summary - Bored-In Pile Construction

    By Andrew L. Peterson

    CATOH Inc. of Weedsport, New York recently completed a very challenging Bored-In Pile project which features unique construction techniques in the installation and load testing of 45 and 100 ton capac

    Jan 1, 1997

  • AUSIMM
    The Mine Management System at Olympic Dam Mine

    The operations management system at Olympic Dam has evolved over a two-year period to the state described in this paper. This evolution has been driven largely by the requirements of the recent expans

    Jan 1, 2000

  • SME
    Episyenites—Characteristics, Genetic Constraints, and Mineral Potential Mining, Metallurgy and Exploration

    By O. T. Rämö, E. Suikkanen

    Episyenites are sub-solidus, quartz-depleted alkali-feldspar-rich rocks. They form veins and lenticular bodies in granitoid rocks and migmatites in a late- to post-orogenic or anorogenic setting. Leac

  • AUSIMM
    Laboratory Studies in Comminution: Part III Effect of Mill Parameters on Grinding a Tin Ore

    By K B. Quast, A Schuurmans

    Laboratory batch rod and ball milling tests were conducted on samples of Heavy Medium Separator (HMS) sinks from Renison Limited. The effects of mill rotation speed, rod volume and ball size on the re

    Jan 1, 1998

  • CIM
    VXP2500 Stirred Mill Optimization at Casmyn Mining Turk Mine

    By D. Rahal, I. Shah, B. Hines, S. Reddick

    "The development of stirred milling technology has proven to be an enabling technology in fine grained metallic deposits. The increased grinding efficiency allows for the economic size reduction requi

    Jan 1, 2014

  • ISEE
    Case History: Controlled Demolition of a Reinforced Concrete Structure in San Sepolcro, Italy

    By Roberto Folchi

    This note deals about the controlled demolition work for the dismantling of an industrial structure in San Seplocro, Italy. The structure to be demolished, the FLOWERS SILOS, consisted in a multilevel

    Jan 1, 1994

  • CIM
    Design, Implementation, and Commissioning of the Gibraltar Development Plan 3

    By S. A. H Tyrrell, R. Rotzinger

    "Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G

    Jan 1, 2014

  • CIM
    Management cost control at Fording Coal Limited's Genesee Operations

    By Phil A. Keele

    "IntroductionGeneralThe Genesee Coal Mine is a joint venture of Fording Coal Limited and the city of Edmonton. The mine supplies thermal coal to the Genesee Generating Station operated by Edmonton Pow

    Jan 1, 1994

  • SME
    Episyenites—Characteristics, Genetic Constraints, and Mineral Potential Mining, Metallurgy and Exploration - Mining, Metallurgy & Exploration (2019)

    By O. T. Rämö, E. Suikkanen

    Episyenites are sub-solidus, quartz-depleted alkali-feldspar-rich rocks. They form veins and lenticular bodies in granitoid rocks and migmatites in a late- to post-orogenic or anorogenic setting. Leac

  • AUSIMM
    Enhancing the Business Environment for Prospecting, Exploration and Mining (Past and New Initiatives)

    By K L. Temel, W P. Player

    The underlying message of this paper is that investment in prospecting, exploration and mining in New Zealand is welcomed. The Government's policy with respect to Crown owned minerals is for cont

    Jan 1, 1997

  • AUSIMM
    Revised Geology of the Tavua Goldfield Fiji

    Differentiation of a basaltic (?) magma occurred in an active volcanic area during the late Miocene and Pliocene, and a change in the general mode of extrusion from fissure flow for the basalt to expl

    Jan 1, 1962

  • SME
    Daylighting Texas Quarry's North Mine

    By H. V. Scotland III

    Lafarge Corporation's Texas Quarry, in Baltimore MD, achieved a substantial expansion of pit reserves by removing an inactive underground mine. The day lighting program, designed, and completed i

    Jan 1, 1999

  • SME
    Production Scheduling At LKAB’s Kiruna Mine Using Mixed Integer Programming

    By M. Kuchta, A. Newman

    LKAB’s Kiruna Mine, located in northern Sweden, produces about 24 Mton of iron ore yearly using sublevel caving. For efficiency, the mine must deliver planned quantities of three ore products. We use

    Jan 1, 2002

  • CIM
    An Economical Vertical Transport System to Hoist 3 Mt of Ore per Annum from 1640 m

    By Wendy L. Naysmith

    This paper deals with the various options considered and factors that influenced the final selection of the headframe, shaft layout and hoisting systems required at the Impala No 16 Shaft in order to

    Oct 1, 2010

  • SME
    A Successfully Service Tested Hard Iron With Superior Abrasion And Corrosion Resistance Is Available For The Mineral Processing Industry.

    By G. A. Calboreanu

    One way of cost reduction is attained when using materials with improved erosion ? corrosion resistance. For many years hard irons successfully answered the Mining Operation needs however application

    Jan 1, 2012

  • NIOSH
    OFR-39(2)-82 Experiments On Personal Equipment For Low Seam Coal Miner: I. Comparison Of 10/60 And Standard Self-Rescue Devices

    By Mark Sanders

    This report compares a proposed 10/60 "piggyback" 02 generating self-rescue unit to the standard CO self-rescue unit with respect to work task interference. A simulated low seam coal mine was construc

    Jan 1, 1980

  • SME
    Environmental Assessment Study For Extension Of Spadina Subway In Toronto

    By Verya Nasri, Scott Thorburn

    The City of Toronto and the Toronto Transit Commission (TTC) have conducted an Individual Environmental Assessment (EA) for a 6.2 km, 4-station underground extension of the Spadina Subway from Downsvi

    Jan 1, 2007

  • AUSIMM
    Why Accounting for Uncertainty and Risk can Improve Final Decision-Making in Strategic Open Pit Mine Evaluation

    The objectives of this paper are two-fold. First, it will show what problems can arise when single estimated values are substituted for a distribution of values when evaluating an open pit mine projec

    Jan 1, 2009

  • AUSIMM
    Carbon kiln selection, operation and maintenance

    By J K. Claflin, S R. La Brooy, A M. Claflin

    Rotary kilns have been in service in the gold industry to regenerate carbon for 65 years. At the time oxide ores with gold head grades of 8 to 10 g/t were being treated. Carbon could be regenerated ad

    Aug 29, 2018