Search Documents

  • CIM
    Remote Real-Time Tire Monitoring in Open Pit Mines

    By Joel T. Werner

    Tire costs represent one of the highest controllable costs in open-pit mining, accounting for approximately 10% of mining costs. Tire monitoring technology has evolved rapidly in recent years and is e

    May 1, 2002

  • AUSIMM
    Minimum Industry Gold Room Security

    Gold rooms represent a high security area and preventing theft is a challenging task. Where gravity concentrates or high value unit intermediate products are present, particular and specific security

    Aug 1, 2010

  • ISEE
    A New Generation of Shock Tube Detonators

    By John Watson

    The earliest known records related to mining document in dramatic terms the fact that mining methods have undergone significant change over the centuries. Wooden wedges, hammers and chisels, “fne sett

    Jan 1, 1997

  • ISEE
    Blasting Effects on Pore Pressure in Coal Impoundments (Dry Conditions - Part I)

    By Joshua Micah Hoffman, Jhon Silva-Castro, Kylie Larson-Robl

    A coal mine impoundment failure has the potential to be environmentally devastating and life-threatening. It is well documented that after seismic events slope failures in impoundments can occur. It h

    Jan 1, 2015

  • CIM
    Long-term planning at Raglan (b8ce356e-c666-4ad8-a03a-11ba76659079)

    By L. W. T. Weitzel

    "This paper reviews the Falconbridge- SMRQ’s Raglan project in northern Quebec and the process that was used in developing its current long-term mine plan. Challenges were many and not only limited to

    Jan 1, 2003

  • SME
    Development of Slurry Wall Technique and Equipment and CSM Cutter Soil Mixing for Open Cut Tunnels

    By W. G. Brunner

    The slurry wall technique has undergone an evolution from its invention to its today’s status. In the early stages slurry walls were built with cable grab, later on with much stronger hydraulic grab a

    Jan 1, 2007

  • DFI
    Temporary Secant Wall For A Subway Rehabilitation Project In An Urban Environment

    By Vincent Tirolo

    Two separate secant pile cofferdams were constructed as part of an extensive rehabilitation and modernization of the New York City Transit's Lexington Avenue/Third Avenue IND Station at 53rd Stre

    Jan 1, 2003

  • SME
    The Role Of The MMAJ And The Activities Of The Japanese Mining Industry In Global Resources Development

    By H. Ikeda

    INTRODUCTION [Slide 1] The Role of the MMAJ Ladies & Gentlemen, it is a pleasure for me to be able to make a speech at this SME annual meeting, representing the Metal Mining Agency of Japan.

    Jan 1, 2001

  • SME
    Job Site Security: Risk Management beyond Gates, Guards and Guns

    By Eric Jacobs

    "Building and operating tunnels has been a highstakes endeavor in terms of costs, complexity, safety and impact on contractors, owners and the public for a long time. There are many variables that nee

    Jun 1, 2019

  • SME
    Diesel Emissions Control Strategies For The Use Of Diesel Engines In Underground Coal Mines – Preprint 97-144

    By N. Paas

    Diesel powered equipment has been operated in underground coal fir mare than 50 years. According to the Mine Safety and Health Administration (MSHA), there are approximately 3,000 diesel units operati

    Feb 24, 1997

  • TMS
    Development of a High-temperature Micro-indentation Technique for Material Mechanical Property Evaluation up to 1200 oC

    By J. M. Tannenbaum

    A depth-sensing micro-indentation technique is developed for evaluating mechanical properties of materials at elevated temperatures (to 1200°C). System description and design considerations of the tes

    Jan 1, 2010

  • SME
    Thermal Exposure Limit in a Simulated Refuge Alternative

    By C. D. Ashley, X. P. Garzon-Villalba, R. M. Lopez, T. E. Bernard

    Federal standards for refuge alternatives (RAs) mandate that they not exceed a Steadman apparent temperature (AT) of 95 °F (35 °C) at an assumedmetabolic rate of 325W, a limit that appears to be arbit

    Nov 8, 2019

  • DFI
    Slurry Wall Design For Hong Kong Station

    By Stephen T. Young

    The construction of Phase 2 of Hong Kong Station, its retail podium and International Finance Centre Two, the tallest building in Hong Kong, will be completed in the middle of 2003. This paper describ

    Jan 1, 2003

  • AUSIMM
    A Synopsis of the Geology of the Lyell District, Tasmania

    IT is not intended that this paper should be regarded as an account of the geology of the Lyell district. It is merely a synopsis of some of the conclusions recently arrived at in regard to the strati

    Jan 1, 1927

  • AIME
    Mining - Underground Mining - The Mathematics of Mine Sampling

    By R. F. Shurtz

    The problem of estimating the precision of systematic samples from a mineral deposit is attacked by interpolating the quality, or other attribute measured, by using Fourier approximation. Such approxi

    Jan 1, 1967

  • CIM
    Towards Optimum Value in Underground Mine Scheduling

    By Bryan M. Maybee

    The scheduling of underground mining activities is a complex task, in particular because of the requirement to satisfy a large number of constraints. A Schedule Optimization Tool (SOT) for underground

    May 1, 2009

  • SME
    Mini Symposium ? Mill Design And Grinding Performance Of Large Ball Mills I ? Mill Design - Grinding Performance Of The Ball Mill At The Dizon Operation Of Benguet Corporation

    By Eduardo M. Sacris

    The performance of the grinding circuit, from the initial stages of operation to the present, is discussed. The mill efficiency as measured by the Bond grindability data and the operating work index i

    Jan 1, 1983

  • SME
    Thermodynamic Analysis Of Gold Leaching By Ammoniacal Thiosulfate Using Eh/Ph And Speciation Diagrams (1b00c1b6-1d3c-49da-aa8d-881dd0b4bd68)

    By D. M. Muir

    Thiosulfate offers a non-toxic alternative to cyanide for processing gold ores. The mechanism of leaching gold using ammoniacal thiosulfate solution is driven by the Cu(II)-Cu(I) redox couple and is c

    Jan 1, 2001

  • IIMP
    Optimización de ore control con metodología Six Sigma

    By Lytman Jordán

    En la actualidad, el proceso de Ore Control de Tintaya se convierte en un reto porque la naturaleza del yacimiento Metasomático de Contacto Tipo Skarn presenta una mineralización compleja a manera de

    Sep 9, 2007

  • NIOSH
    IC 7268 Tentative Bituminous-And Lignite-Mine Inspection Standards -Revised September 1943 ? Introduction

    These inspection standards have been prepared for use in the Federal inspection of bituminous and lignite mines. They are a revision of "Tentative Coal-Mine Inspection Standards," published as Bureau

    Jan 1, 1943