Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Study of the Behavior for Backfilling Material in Room-and-Pillar Coal Mining

    By Joao Felipe Costa, Jair C. Koppe, Andre Zingano, Cleber Gomes

    "Run-of-mine Brazilian coal has high ash content and low calorific power. Therefore, the coal must be washed to achieve the power plant specifications for burning coal. A large amount of waste results

    Jan 1, 2010

  • SME-ICGCM
    Mistakes, Misconceptions, and Key Points Regarding Secondary Roof Support Systems (b87a5324-ac75-480a-90d7-e642733c14a4)

    By Thomas M. Barczak

    Roof support systems are necessary to provide stable mine openings and much research has been conducted to design a variety of roof support systems that will function in various manners to ensure that

    Jan 1, 2001

  • SME-ICGCM
    Application Of A Static And Geophysical Monitoring System For Detection Of Stability Problems

    By Maleki. Hamid

    The U.S. Bureau of Mines implemented an inte¬grated static and geophysical monitoring program in a southern Wyoming mine to study changes in seismic wave propagation properties in roof strata. The pur

    Jan 1, 1993

  • SME-ICGCM
    Sidewall Fracturing In Coal Room And Pillar And Pillar Extraction Panels (fdea63a5-d54d-46e2-aad5-6c4f1c72e2f1)

    By André Vervoort

    In coal room and pillar, and pillar extraction panels, the sidewall conditions were investigated based on underground measurements and numerical simulations. Three-dimensional linear elastic models pr

    Jan 1, 1992

  • SME-ICGCM
    Bailey Mine Slurry Impoundment Longwall Subsidence Monitoring

    By Richard J. Perin

    Subsidence monitoring was conducted in proximity to the 1-A and 2-A longwall panels at Consol Pennsylvania Coal Co.'s (CPCC) Bailey Mine slurry impoundment. Monitoring fullfills federal Mine Safe

    Jan 1, 1988

  • SME-ICGCM
    The Stress And Failure Paths Followed By Coal Mine Roofs During Longwall Extraction And Implications To Tailgate Support

    By Ross Seedsman

    Discussion on the design of roof support in tailgates has often been conducted without a clear statement of the stress and failure conditions acting. There is general agreement that in the tailgate th

    Jan 1, 2001

  • SME-ICGCM
    Highwall Mining of Thick, Steeply Dipping Coal: A Case Study in Geotechnical Design and Recovery Optimization

    By David P. Conover, Jake Bain, Christopher M. Ross

    "Highwall mining of thick (up to 100 ft) steeply dipping (20° or more) coal seams provides many challenges, both geotechnically and operationally because seam dips near or in excess of highwall mining

    Jan 1, 2017

  • SME-ICGCM
    Mapping and Application of Roof Joint Patterns for Ground Control inAn Illinois Mine

    By Kenny D. Basnett

    An analysis of the Roof Falls Data Base (RFDB) for underground coal mines in Illinois for the period 2004?2008 indicated that about 80% of the roof falls occur at intersections and are associated with

    Jan 1, 2011

  • SME-ICGCM
    The Search For A Method To Provide Warning Of Coal And Gas Outbursts

    By Fred Leighton

    Outbursts, or the sudden and sometimes catastrophic expulsion of coal and gas into the working area of a coal mine, are a little understood and growing problem. The AE/MS (Acoustic Emission/Microseism

    Jan 1, 1982

  • SME-ICGCM
    Simulated Materials Modeling And Analysis Of The Overburden Strata Movement In Top Coal Caving Mining

    By Zhou Ying

    Based on the mining condition and roof lithology of the 2-3 coal seam at Gengcun Mine, the simulated materials modeling method was used to study the movement process and characteristics of overburden

    Jan 1, 2001

  • SME-ICGCM
    Mine Planning For Longwall And Pillar Retreat Panels Subject To Seam Interaction Effects

    By Thomas L. Vandergrift

    Multiple-scam mining is becoming more common in the United States, especially in the East, where primary reserves arc being depleted, forcing mining companies to develop secondary seams, Although mine

    Jan 1, 2000

  • SME-ICGCM
    Longwall Mining-Induced Abutment Loads and Their Impacts on Pillar and Entry Stability

    By Jinsheng Chen

    Longwall mining-induced abutment loads on the surrounding coal pillars can be grouped into two categories in terms of the relative position of the coal pillars and the longwall face. They are the fron

    Jan 1, 2002

  • SME-ICGCM
    Investigations Of Underground Coal Mine Bursts

    By K. Haramy

    Coal mine bursts or bumps involve the violent, rapid failure of coal and rock in or around a mine excavation. Failure is normally associated with high stress and brittle or brittle-elastic materials;

    Jan 1, 1984

  • SME-ICGCM
    Tensile roof failure arising from horizontal compressive stress and geological slips

    By Alan Bugden

    Goedehoop colliery in South Africa has experienced a number of substantial roof falls in roadways and intersections. Many of these have been associated with geological slips and/or horizontal compress

    Jan 1, 2003

  • SME-ICGCM
    Resin-Grouted Cables For Longwall Tailgate Support Stability

    By Stephen C. Tadolini

    The U.S. Bureau of Mines (USBM) is conducting research to provide alternatives for traditional secondary support methods. These cost-saving methods are proving to afford safer installation, improve en

    Jan 1, 1994

  • SME-ICGCM
    Enhanced Surface Control For Roof And Rib Support (8fec630d-2a24-4d9d-8993-15ef5bf95858)

    By Stephen C. Tadolini

    The risk of injury caused by minor roof falls continues to increase in underground mining. Most ground control injuries result from small rock falls that occur in a supported area, but do not involve

    Jan 1, 2001

  • SME-ICGCM
    Causes of Massive Directional Roof Falls in Room and Pillar Mines - Two Case Studies

    By S. S. Peng

    In recent years many roof falls have been conveniently attributed to the adverse existence of a high horizontal stress. The normal practice of not conducting a follow-up study in a roof fall investiga

    Jan 1, 1999

  • SME-ICGCM
    Longwall Mining-Through the Backfilled In-Panel Entries at Cyprus Emerald Mine

    In recent years, improvements made to the longwall system have accelerated at a faster pace than those made to the gate entry development system. As a consequence, unless planned years ahead of time,

    Jan 1, 1997

  • SME-ICGCM
    Optimization Of District-Wide Mine Layout In Multi-Seam Mining: A Case Study

    By Huamin Li

    Mine # 8 of Pindingshan Coal Group, Henan Province, China has an annual production 2 million metric tons. But it encounters many problems, e.g. mine layout is complicated, roadway maintenance is diffi

    Jan 1, 2000

  • SME-ICGCM
    Failure Modes Of Mine Tunnels In Stratified Rock Structures With Reference To Stress Field Conditions

    By Hui Chen

    The paper describes the use of a physical model technique to investigate the failure modes of mine tunnels with reference to the in situ stress field. The characteristics of stratification commonly en

    Jan 1, 1993