Keynote Address for 24th International Conference on Ground Control in Mining, August 2- 4, 2005 - Like Deja Vu All Over Again
By Peter B. Lilly
Thank you, Syd, for the kind introduction and for inviting me to give the Keynote Address at this very prestigious gathering of some of the finest intellect and talent in the domestic and internationa
Jan 1, 2006
-
The Back Pressures Associated With Resin Rock Bolt Installations And Methods To Control And Predict It (1a0250a7-1c1e-4686-8a66-dbfc2dd6e095)
By Anthony S. Spearing
The vast majority of the estimated 100 million rock anchors installed in mines in the USA per year use resin cartridges (Tadolini and Mazzoni, 2006). About 4.5 million per annum of these are bolts wi
Jan 1, 2009
-
Analysis of Coal Pillar Stability (ACPS): A New Generation of Pillar Design Software
By Zach Agioutantis, Christopher Mark
"Thirty years ago, the Analysis of Longwall Pillar Stability (ALPS) inaugurated a new era in coal pillar design. ALPS was the first empirical pillar design technique to consider the abutment loads tha
Jan 1, 2018
-
Footwall Stability and Final Pit Design in the PT. Adaro Coal Mine, Indonesia
By Takashi Sasaoka
The PT. Adaro Coal Mine targeted in this research is located in South Kalimantan, Indonesia. The coal production of this mine is increasing year, with about 35 M tons of coal produced in 2006. Th
Jan 1, 2008
-
Advancements in the Use of High-Modulus Polymer Mining Grids to Speed Longwall Recovery
By Thomas A. Bailey
Since the advent of longwall mining, various methods and materials have been used during relocation to control the intrusion of the gob in the shield/panline area. (figure 1) Controlling this gob is c
Jan 1, 2006
-
Subsidence Misconceptions And Myths
By Richard E. Gray
Subsidence due to coal mining is poorly understood by non-specialists. This has led to numerous misconceptions and myths based on limited observations and lack of knowledge. The three most common are:
Jan 1, 1996
-
Knowledge Is Power: Introducing the Midas, a New Permissible Datalogging System for Use in Mines
By Tristan H. Jones
Beginning in 1987, miniature dataloggers approved by the Mine Safety and Health Administration (MSHA) were publicly available for sale. The principal among these was the model CR21XQM, manufactured by
Jan 1, 2012
-
Applications of Microseismic Monitoring in China?s Underground Coal Mines
By Xiangxi Wu
Longwall and continuous mining are prevalent methods employed by Chinese underground coal operations. The main ground control challenges include roof skin deformation, roof collapse, and outbursts of
Jan 1, 2012
-
Roof Pressure Monitoring Using The Integrated Longwalt Automation System By WESTFALIA
By Ulrich Paschedag
The WESTFALIA group of companies developer and manufactures underground mining machinery for complete high-performance longwalls. WESTFALIA uses a state of the art electrohydraulic system as the most
Jan 1, 1994
-
Development of Mains in Challenging Ground Conditions
By Kot F. v. Unrug
The present combination of coal market prices and reserves, situated in the Central Appalachian Coal Field, is such that mining of smaller coal reserve blocks has become economically attractive. In
Jan 1, 2006
-
Pre-mining stresses at some hard rock mines in the Canadian Shield (2c76bca0-8dd2-4a44-bc9b-85524b3514cf)
By B. Arjang
ABSTRACT: Ground stresses are one of the significant factors in the context of rockbursts and underground instability at some hard rock mines in Canada. Overcoring strain relief measurements using tri
Jan 1, 1989
-
Requirements and Performance of Pumpable Cribs in Longwall Tailgate Entries and Bleeders
By Peter Zhang
Pumpable cribs are being increasingly used in longwall tailgate entries and bleeders for roof support under abutment pressure. Their high peak capacity and confinement-controlled yield characteristics
Jan 1, 2012
-
Strata Management with Ground Behavior Assessment for Mass Exploitation of Coal Deposits: A Case Study of Continuous Miner
By Sanjay Kumar Singh
The mechanics of load transfer in bord-and-pillar mining is not well understood despite the evolution of the art of pillar extraction over the last 20 years via trial and error (empirical) or Rock Mas
Jan 1, 2012
-
Development of Low Profile Remote Roof Bolting Module
By Bill Kyslinger
In underground mining, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Boart Longyear Poland and KGHM, J. H. Fletcher & Company was ta
Jan 1, 2006
-
Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)
By Larry DeGraff
With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr
Jan 1, 2009
-
FlexKnot: An Innovation in Roof and Rib Surface Control
By Anand Bhagwat
Surface control can prevent the falls of ground between primary roof support systems and rib support. Using existing industrial products, and adopting them for mining applications, has historically at
Jan 1, 2014
-
Application Of Hilti Onestep Bolts For Roadway Support In German Deep Coal Mines
By Michael Bayerl
The HILTI OneStep rockbolt was implemented for roadway development in German deep coal mines in 2004. The development by HILTI Company is based on a technical joint venture with RAG Deutsche Steinkoh
Jan 1, 2009
-
Computer Modeling Of Rock Mass Geomechanic State In Longwall Design
By V. D. Jalevsky
A new methodology of an experimental-analytical approach has been developed. It is used in building an information geomechanic monitoring system for the modeling of geomechanic processes during coal s
Jan 1, 1996
-
Trail Mountain Mine: A Case Study For Improving Locations Of Mining-Induced Seismicity With Double-Difference Relocation (2de3a4ff-91be-4a02-947a-fc4fd7ffaac8)
By Eleanor Sonley
In October 2000, temporary seismographic stations were installed above the Trail Mountain Mine, Emery County, Utah, USA to supplement a regional network. Over seven months, 1826 mining-induced seismi
Jan 1, 2009
-
The Unpredictable Life Cycle of a Coal Pillar (b2bcadc5-82a3-454e-be3a-6b79e9867244)
By Stephen Tadolini
A unique circumstance created by monitoring a pre-driven longwall recovery room permitted measuring the stresses of a coal pillar throughout its entire life cycle in less than a week. A fender pillar
Jan 1, 2007