Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Vibration Effects of Coal Pit Blasts on Tower Pithead Concrete Structures
By Mark Svinkin
To save time for construction of coal pits, the contractor decided to combine erection of the tower pitheads with digging of skip shafts to the depth necessary for placing proper coal pit equipment. I
Jan 1, 2004
-
Detection of Geological Features using Aerial Image Analysis and Machine Learning
By Ravi Sahu, Ankit Jha, Sudarshan Rajagopal, Purushotham Tukkaraja
Geologic structures are one of the crucial parameters in blast design. Structural geology and rock properties influence drilling patterns, blast layout, and initiation systems. A comprehensive underst
Feb 1, 2020
-
Blast Preconditioning – A Development and Operational Challenge
By Jeff Gore, Jack Dermody, David Gribble, Brett Macaulay, Bart Sharpe, Paul Klaric, Paul Thornley, Ben DeVries
Optimal Fragmentation in Block Caving is difficult to achieve as it is generally defined by the rock mass itself and the way in which the cave is initiated. The lower portion of the cave has even less
Jan 1, 2013
-
Blast Optimization using Air Decking with Gasbags – An Open Pit Gold Mine Case Study.
By Angelina Anani, Seffit Aderuyi, Sylvester Avane, Joseph Wilson-Sey, Amatus Niminye
The Edikan mine in Ayamfuri, Ghana, faces economic challenges and community resistance due to its proximity to residential areas, particularly concerning blasting operations. Controlled blasting trial
Jan 21, 2025
-
Importance of Straight Hole Drilling
By Stephen Hamilton
This case history details the issues surrounding the rock drilling industry’s growing demand for straight holes, the importance of straight holes and the introduction of a new production drilling syst
Jan 1, 1999
-
Median and Mean in the Kuz-Ram Model
By CVB Cunningham
"The Kuz-Ram model as originally proposed included an error in assuming that the mean fragmentsize predicted by Kuznetsov’s equation was actually the 50% passing size. In 2003 Spathis began discussion
Jan 1, 2016
-
Estimating Damage Caused by Rock Vibration
By Raimo Vuolio
"Over the past 30 years, the Nordic countries have developed similar practices for estimating damage caused by rock blasting vibrations. However, over the last few years the risk of damage has sometim
Jan 1, 1991
-
Buffer Blasting Techniques in Open Pit Mines
When CIL presented their new theory of the Breakage Process and Delay Blasting at the 74th Annual Meeting of the CIM in 1972(1), there was hardly any open pit operation in Canada that was using longer
Jan 1, 1979
-
Improvement of Safety Practices for Loading of ANFO-based Explosives in Zones with Reactive Rocks in Chile
By María Virginia Ramírez, Alejandro Alarcón, Alea Reyes
Reactive grounds (presence of FeS2, CuFeS2) can create hazards in a mine; misfires to premature deflagration or detonation of loaded blast holes. This occurs because some minerals can react to ANFObas
Jan 1, 2018
-
Update on Blasting Near a Crusher
By Scott G. Giltner, Alex Schwenk
This paper is an update on a paper presented at the 2022 ISEE conference. The original paper presented how the mine operator desired to open up ore reserves near several mine structures including two
Jan 21, 2025
-
Modelling Complex Shock Tunnel for Shock Interaction and Transfer Testing
By Catherine Johnson, Barbara Rutter
The shock tunnel located at the Missouri University of Science and Technology Experimental Mine is 65 feet 9 inches (20.0406 m) in length. The tests performed inside of this tunnel are either arena te
Jan 1, 2018
-
The 8 Millisecond Rule is Dead – Or Is It?
By Daniel Richards, Dr Rob Farnfield, Dr Geoff Adderley
The 8-millisecond rule has been in use for many years as a basic technique to help minimize vibration levels from surface blasting operations. The rule was based on work carried out in the 1960’s by t
Jan 21, 2025
-
Blasting In Close Proximity to Densely Populated Communities
By Radhe Krishna, Mutale William Chanda, Timothy Mwale
Blasting as a process is the emplacement of industrial explosives into blast holes suitably located to a free surface and detonated. Every blast hole containing a certain amount of explosive charge un
Jan 1, 2015
-
Demolition Using Water-Cased Kicker Charges
By Emily Johnson, Catherine Johnson, Rachel Bauer, Paul Pitzel
Demolition projects involving explosives may incorporate cutting charges to sever columns in collaboration with kicker charges that “move” the columns out of alignment. Traditional kicker charges ofte
Feb 6, 2023
-
Hoover Dam Project
By Joe Strobbe, Kevin Joe
The U.S. Bureau of Reclamation awarded PCL Civil Constructors the project to build a new visitor's center and parking lot structure at the Hoover Dam. The excavations for these structures present many
Jan 1, 1993
-
Comparison of Recent and Past Blast Induced Pipeline Strain Responses
By Travis A. Davidsavor, Charles Dowding, David A. Provost, Yonggang Gou
This paper compares measured blast induced strains on operating, full scale, buried pipelines with three similar past studies. The recently performed study represents realistic and modern pipeline bla
Feb 1, 2020
-
Mobile Radio Transmitter Safety Regulations
By D T. Froedge
To preface these remarks, it is not intended that this paper be a criticism of anyone or any organization involved in drafting the current regulations, for it appears that everyone involved in the pro
Jan 1, 1975
-
Blasting Optimization using 3D Photogrammetry in a South Brazilian Quarry
By L. O. Souza, J. F. Gewher, M. P. Scussiatto, C. S. Mendonca, R. A. McClure, B. T. Kuckartz, J. Kloeckner
Blasting is the most effective and economical tool available to fragment and move rock for most applications. If properly executed, it can improve down-stream operations such as loading, hauling and c
Jan 1, 2013
-
Analysis of Rock Vibrations for Decomposed Tunnel Rounds
By R Mancini, G Borla
This paper analyses the first results of a part of an EEC research project ("Blasting control for underground mining"). This research that involves three universities (Paris, Torino and Leoben) has be
Jan 1, 1995
-
Journal: 100 Years / The breakup of DU PONT
By Robert Hopler
On June 13, 1912, the final decree of dissolution of the DuPont explosives trust was handed down, and the resulting new companies began operating at the beginning of the new year. The property assets
Jan 1, 2014