  • DFI
    8000 Series Piling Rig

    By Roger A. Bullivant

    The introduction of this size and type of piling rig is intended to address a multipurpose foundation activity. The 8000 denotes the size of equipment that is attached to the mast, namely 8000 Kg. Lar

    Jan 1, 1995

  • DFI
  • DFI
    Cockatoo Island Seawall Seepage Barrier

    By Chris L. Powell, Russell J. Denny

    "The remotely located Cockatoo Island iron ore mine off the Kimberley coast in the northwest of Western Australia has been in operation since 1951. The mine was recently expanded up to about 50 m (165

    Jan 1, 2017

  • DFI
    Cockatoo Island Seawall Seepage Barrier (b791f2b4-d692-4b8a-afba-0ecd9b385be1)

    By Chris L. Powell, Russell J. Denny

    "The remotely located Cockatoo Island iron ore mine off the Kimberley coast in the northwest of Western Australia has been in operation since 1951. The mine was recently expanded up to about 50 m (165

    Jan 1, 2017

  • DFI
    Ethical and Risk Aspects of Deep Foundation Subcontracts

    By Alexander Filotti, Richard Kalson

    "In the last decade, the construction industry has witnessed significant changes in the project delivery systems and contractual relationships between the general contractors (GC) and Deep Foundation

    Jan 1, 2016

  • DFI
    Earth Retention Using Augered Cast-In-Place Piles - A. Introduction - 1. Applications

    By William S. Heckman

    a. When to use: high surcharges, vertical capacity required, limit noise and eliminate vibrations, low headroom, eliminate vibration induced settlements. b. Advantages: eliminates impact noise and

    Jan 1, 1997

  • DFI
    Reverse Circulation Drilling (Rcd) Technology For Largediameter Piles

    By Nikolas Schmitz

    For today’s construction industry, large-diameter piles are common practice, as they are more competitive than drilling a larger number of smaller piles. More and more piles are installed by drilling

    Nov 1, 2022

  • DFI
    Cofferdam Failures ? Introduction

    By Richard J. Hartman

    This presentation identifies some of the more common problems associated with cofferdam construction. After the various problems are identified, they are briefly explained and possible solutions and p

    Jan 1, 1987

  • DFI
    An In-Situ Model Test For A Large Hydraulic Press Foundation ? Synopsis

    By R. J. Yan

    There was a plant equipped with a 32000t Hydraulic Press to be built, under which a box foundation of 22.5m x 15m x 14.25m (depth) with a base slab of, varying thickness was proposed. The subgrade rea

    Jan 1, 2010

  • DFI
    Proceedings Of Earth Retention Systems 2003: A Joint Conference - Earth Retention Systems In The Urban Environment - Special Considerations

    By George J. Tamara

    The urban environment presents special challenges for the design and construction of earth retention systems. Complications arising from difficult subsurface conditions are compounded by the presence

    Jan 1, 2003

  • DFI
    Guidelines for Selecting Cutoff Wall Systems

    By Mary Ellen Large

    This publication of Deep Foundations Institute (DFI) is intended to provide project owners, design engineers and construction professionals with guidelines for selecting cutoff wall and barrier system

    Jan 1, 2021

  • DFI
    CFA Secant Piling In California

    By Philip Derbyshire, Dale J. Scheffler

    "Continuous Flight Auger (CFA) piling is a variation of Augered Cast-In-Place (ACIP) or augercast piling. In both cases a continuous auger with a hollow stem is used to drill a hole and a pile is form

    Jan 1, 2005

  • DFI
    Instrumentation And Interpretation ? Introduction

    By H. Mori

    The session chairman, Dr. H. Mori, welcomed the delegates to Discussion Session 8. AUTHORS PRESENTATIONS 1 . G. Price, Building Research Establishment. UK Mr. Price expanded on the content

    Jan 1, 1991

  • DFI
    Carbon Footprint Of Common Quay Structures

    By Dr Karsten Galipp, Kai-Julian I. Hendler, Prof. Manuel G. Pinheiro, Dr Peter J. Bourne-Webb

    With a share of approximately 11% of global greenhouse gas emissions, the construction industry contributes significantly towards climate change. This is why construction projects should not only be a

    May 1, 2022

  • DFI
    Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging Project

    By José Carlos do Amaral, Marcelo Groszownik, Jorge Beim

    "Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the

    Jan 1, 2015

  • DFI
    Evaluation Of A New P-y Analysis Tool For Lateral Analysis Of Drilled Shafts Using Load Tests In Nevada

    By David H. Sanders, Ramin Motamed, Fahim M. Bhuiyan, Raj V. Siddharthan

    Large-diameter drilled shafts (DS) are a critical part of a seismic-resistant system, and therefore it is important to be able to accurately model lateral resistance. To undertake the lateral load ana

  • DFI
    Systematic Evaluation of Driving Criteria and Performance of Tapered Piles in Glacial Sand

    By Terrence M. Carroll, Chu E. Ho, Dimitrios Niarchos

    "Construction of the new extension to Terminal 4 at John F Kennedy International Airport in Queens, New York involved the application of tapered piles for foundation support. Initial design based on p

    Jan 1, 2017

  • DFI
    List Of Exhibitors

    A technical exhibition was held in conjunction with the 4th DFI International Conference on Piling and Deep Foundations, Stresa. The exhibition was located in the ground floor of the Conference Hall.

    Jan 1, 1994

  • DFI
    Investigation and Design for Large Drilled Shaft Foundations in Southwest Arizona

    By John C. Tosh, Peter M. Kandaris, Sheldon John

    Geologic, geotechnical and hydrologic studies were performed for the design of 115 deep, large diameter drilled shaft reinforced concrete foundations (6 to 12 feet) to support tall steel monopoles for