Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Guide to Drafting a Specification for Micropiles (XXII International Mineral Processing Congress)

    By Joint Micropiles Committee

    "The three types of specifications which are used for micropile work are: • Performance Specifications: The contractor is permitted control over certain design and/or construction procedures but must

    Jan 1, 2004

  • DFI
    Design Of The BMIP Boat Section - Introduction

    By Kenneth Pidgeon

    The Boston Marine Industrial Park (BMIP) Boat Section, which is part of contract C04A2 of the Central Artery/Tunnel (CA/T) project, is currently under construction in South Boston, Massachusetts (Fig.

    Jan 1, 1994

  • DFI
    Information Technology And Monitoring - Technologies De L'Information Et Monitoring - Innovations In Diaphragm-Wall Construction Plant

    By Maurice Guillaud

    The most striking innovations on diaphragm-wall construction plant are those associated with continuous real-time trajectory monitoring of the excavating tool (either a grab or a hydro-cutter). Th

    Jan 1, 2002

  • DFI
  • DFI
    Load In A Drilled Foundation. Where Did It Go And When Did It Get There?

    By Walter E. Vanderpool

    Three drilled foundations for an elevated water-tank were instrumented, tested and monitored during construction and the first two years in service. One shaft was load tested by the Osterberg method.

    Jan 1, 2004

  • DFI
    Holding Back The Watchung Mountains

    By Ryan C. Linthicum

    A system of steel sheeting and multiple levels of high capacity double corrosion protected soil anchors were used to restrain a major slope failure that occurred at the base of the Watchung Mountains

    Jan 1, 2003

  • DFI
  • DFI
    Impact And Ramifications Of Setup For Pile Foundations

    By Cory G. Rice

    A significant portion of the piling industry has long felt relying on soil setup to gain the required capacity is a complexity that would rather not be dealt with. Instead, the pile are driven to the

    Jan 1, 1992

  • DFI
  • DFI
    Insitu Ground Reinforcement Techniques

    By Peter J. Nicholson

    The methods of reinforcement to be discussed in this paper are all insitu methods, ones that can be used on the soil structure as it exists in the ground, and do not rely on excavation and replacement

    Jan 1, 1991

  • DFI
    Ground Improvement for the Distressed Earth Bund Using Stone Column - A Case Study

    By M. Kumaran, A. Vetriselvan, A. Purantharan

    "This paper presents a case history of evaluating the stability of a distressed earth bund and rectification measures carried out. A 5.45 km long, 7m high earth bund for drinking water storage was con

    Jan 1, 2017

  • DFI
    Recent Experience With The Omega Pile And New Applications - Synopsis

    By Maurice Bottiau

    The recent evolution of the piling market clearly shows a growing demand for screw piles with soil displacement. The recently developed Omega Screw pile ful-fill these new expectations, combining the

    Jan 1, 1996

  • DFI
    Dynamic Testing For Bored Pile Bearing Capacity - Summary

    By Jörn M. Seitz

    Dynamic load testing is employed with ever increasing frequency to estimate the strength and elastic settlement behavior of piles of all types. For dynamic loading ram masses up to 20 Mg have been use

    Jan 1, 1987

  • DFI
    Hollow Core Bar Micropiles - Design Parameters Interpreted From 404 Load Tests

    By Jesús E. Gómez

    This work is a continuation of a paper presented in the 32nd DFI Annual Conference, Colorado 2007, titled ?Hollow Core Bar Micropiles - Design parameters interpreted from 260 load tests.? The first pa

    Jan 1, 2008

  • DFI
    Case History Of The Support Of Excavation System At The Dulles Automated People Mover (DAPM) Tunnels And Stations

    By Marlion T. McQuinn

    This paper will discuss the design, construction, and performance of the support of excavation on the Dulles East and West Automated People Mover Tunnels and Station projects. The elements of the sys

    Jan 1, 2006

  • DFI
    Current Pile Foundation Practice In Taiwan ? Synopsis

    By Za-Chieh Moh

    This paper presents a summary of the current pile foundation practice in Taiwan. Constructions of driven piles, drilled shafts, and barrette foundations are reviewed. This paper also briefly summarize

    Jan 1, 1996

  • DFI
  • DFI
    Load Testing Of Deep Foundations Using The Osterberg Load Cell

    By David E. Thompson

    This paper describes the full-scale field load testing of three deep foundation units using the Osterberg Load Cell. The load tests were completed on three separate projects, two in Massachusetts and

    Jan 1, 1989

  • DFI
    Case Histories, Part 1 - Études De Cas, Partie 1 - Jet Grouting Underpinning Of A Building In The Us

    By Gustavo E. Armijo

    This job was done in Morristown, NJ, with mono fluid system jet grouting for the construction of a new bank building. After the demolition of the existing two story structures, an excavation in loose

    Jan 1, 2002

  • DFI
    Case Study of Deep Mix Pile Supported Diaphragm Wall for a Stilling Basin Structure in Malaysia

    By Chandrasegaran, Tamilmani

    "This paper describes a case study of a retaining wall structure using a diaphragm wall to construct a stilling basin at Tanjung Bin T4 power plant in Johor Bahru, Malaysia. The stilling basin is part

    Jan 1, 2015