    Teck’s Secondary Leaching Technology

    By H. M. Lizama, R. L. Stephens

    Secondary leaching of previously leached supergene copper ore has been developed and implemented at Teck’s Quebrada Blanca operations. This consists of using in-situ leaching techniques aided by geoph

    Jan 1, 2019

  • CIM
    Difficult Gold Gravity Recovery Separations

    By J. Ling, L. Racine, P. Cousin, A. R. Laplante

    "The problem of gold recovery by gravity from high density gangues is first discussed from a fundamental perspective. Three potential difficulties are presented: poor liberation and fine gold particle

    Jan 1, 1997

  • CIM
    Optimization of Pellet Plant Process Parameters Using Six Sigma Methodology

    By Andrea McGlynn

    Iron Ore Company of Canada, Labrador City 2011?Canada's largest iron ore producer, leading global supplier of iron ore pellets and concentrates ?Rio Tinto (58.7%), Mitsubishi Corporation (26.2%

    May 1, 2011

  • CIM
    On-Line Flotation Simulator at Pyhäsalmi Mine

    By K. Zenger, J. Kaartinen, J. Huuskonen, S. Torttila, S. Lähteenmäki, J. Pietilä

    "Pyhäsalmi Mine in Finland has a long history of continuous process development. The concentrator processes Cu-Zn-sulphide ore with high recoveries. An on-line flotation simulator has been developed t

    Jan 1, 2015

  • CIM
    A Benchmarking Tool for Assessing Flotation Cell Performance

    By Jan E. Nesset, James A. Finch, Wei Zhang

    "Bubbles are unquestionably the heart of the flotation process. Their size and combined surface area are largely what drive the recovery process. This suggests that plant engineers should be aware of

    Jan 1, 2012

  • CIM
    Optimizing Performance at the David Bell Mine Concentrator

    By K. Meyer

    "The largest cost centres of the David Bell Mine concentrator are grinding, leaching and effluent treatment. Optimizing results during the 6th year of operation are listed below: o SAG mill slurry den

    Jan 1, 1991

  • CIM
    Pressure Leaching of Copper-Cobalt-Zinc Containing Calcine with the Outotec Pressure Oxidation Process

    By Mehmet Canbazoglu, Kaarlo Haavanlammi, Hannu Laitala

    Cobalt is currently a critical metal because of the increasing number of electrical vehicles forecast for production. Copper and zinc are base metals that are used in many everyday applications, inclu

    Jan 1, 2019

  • CIM
    Stope Stability Monitoring at the Goldex Mine

    By Patrick Frenette

    The Goldex Mine is an underground gold mine using a unique mining method where a single very large stope is being created. In order to maintain stability of the walls and roof of the stope which is 45

    May 1, 2011

  • CIM
    LIDAR Geotechnical Mapping for the Construction of Deep Underground Science and Engineering Laboratory at the Former Homestake Mine

    By Zbigniew J. Hladysz

    A Deep Underground Science and Engineering Laboratory (DUSEL) is being planned at the site of the former Homestake Gold Mine in Lead, South Dakota, under the sponsorship of the US National Science Fou

    May 1, 2011

  • CIM
    Developing a Unified Display Design for Mining Shovels

    By Andrew Chapman

    The scope of the SA (Situational Awareness) working group is to analyze the effectiveness of information delivery systems in mining equipment and develop a unified display design, to mitigate against

    Aug 1, 2013

  • CIM
    Secondary Recovery of Bitumen Using Jameson Downcomers

    By R. Siy, O. Neiman, B. Hilscher

    "A full-scale prototype of “Jameson Downcomer” technology has been installed and tested on a Tailings Oil Recovery (TOR) vessel in Syncrude’s Mildred Lake extraction plant. Jameson Downcomers are a ty

    Jan 1, 2012

  • CIM
    The contour method of estimating mineral resources

    By W. E. Roscoe, H. Agnerian

    The contour method can be used to estimate the mineral resources of a mineralized body. It relies on geological interpretation and allows the geologist to determine the plunge of a mineralized ore sho

    Jan 1, 2002

  • CIM
    Site Selection

    By Rob Boom, Yasuyuki Tozaki, Frank M. Wheeler

    Selection of a suitable site for a metallurgical plant is crucial for the success of the business case. For a brownfield project, with the decision to locate the project on a site with existing produc

    Jan 1, 2015

  • CIM
    A review of the first 25 years of mobile machine automation in underground hard rock mines

    By Malcolm Scoble, Nick Vagenas, Greg Baiden

    Recent advances in underground communications technology have demonstrated the feasibility of teleoperation and automation in underground metal mines. One major challenge lies in the automation of und

    Jan 1, 1997

  • CIM
    The Development of Gold Mining in Canada

    By G. E. Cole

    "Amongst the mineral products of Canada gold holds the second place in value of yearly output. . . . . .The production of gold has increased steadily during the past six years and has somewhat more th

    Jan 1, 1927

  • CIM
    Pneumatic Flotation as Key for the Ultra Fine Flotation of Different Ores and Minerals

    By Lutz Markworth, Evren Ören

    "The worldwide demand of ores and the depletion of the high-purity deposits make it necessary to recover ores in increasingly finer size fractions in the feed material. The flotation technology of mor

    Jan 1, 2009

  • CIM
    Statistical Multi-Scale Method of Mechanics Parameter Prediction for Rock Mass

    By J. Z. Cui

    In this paper a statistical multi-scale method for the mechanics parameter prediction of the rock mass with random distribution of multi-scale cracks/joints is presented. First the micro-structure of

    May 1, 2009

  • CIM
    Technology Selection for the Genesee Phase 3 Electricity Generating Station Expansion

    By Les Johnston

    _ BACKGROUND - About EPCOR - Genesee Generating Station - Phase 3 Expansion _ TECHNOLOGY SELECTION - Selection Criteria - Combustion Options - Flue Gas Emission Control Options _ STAKEHOLDER V

    May 1, 2002

  • CIM
    Quantitative characterization of the REE minerals by QEMSCANTM from the Nechalacho Heavy Rare Earth Deposit, Thor Lake Project, NWT, Canada

    By Tassos Grammatikopoulos, Sarah Prout, William Mercer, C. Gunning

    "The Nechalacho rare metal deposit is located in NWT, Canada. Avalon Rare Metals Inc. is now evaluating processing techniques for recovery of REE to be used in the industry. QEMSCANTM analysis coupled

    Jan 1, 2011

  • CIM
    Design, testing and performance of the world’s first fuel cell mine vehicle—a production locomotive

    By A. R. Miller, G. Desrivières, T. MacKinnon, H. Bursey, M. C. Bétournay, B. Replogle, D. L. Barnes, P. Laliberté

    "A mine production locomotive, the world’s first applied industrial fuel cell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Pr

    Jan 1, 2004