    A knowledge-Based System for a Off-Line Optimization of Ball Milling Circuits

    By A. Farzanegan, D. A. Lowther, A. R. Laplante

    "Off-line optimization studies are often necessary to improve the efficiency of grinding circuits. These studies are primarily based on the mathematical modelling of processing units (e.g., ball mills

    Jan 1, 1997

  • CIM
    Rust Surface Area Determination of Steel Bridge Component for Robotic Grit-Blast Machine

    By N. Hwang

    There has been increasing interest in the use of robotic machines, and several prototype robotic machines have been developed to automate the grit-blasting process for the purpose of steel bridge main

    Aug 1, 2013

  • CIM
    Ultrafast Recovery of Hydrophobic Particles Using a Novel Hydrophobic Binder Medium

    By K. van Netten, T. P. Ernst

    "Froth flotation has been used successfully for about a century in the beneficiation of both coal and mineral particles. With the on-going trend towards lower feed grades, however, there is a need to

    Jan 1, 2016

  • CIM
    Mining Construction Safety Documents for Safety Concept Structure Discovery using Formal Concept Analysis

    By H. H. Wang

    Construction safety documents regulate significant safety actions and requirements by which construction workers or employees should abide in order to secure them from occupational hazard events. Ther

    Aug 1, 2013

  • CIM
    Control of Recrystallization in Cold-Rolled AlMn(Mg)ScZr Sheet for Brazing Applications

    By M. F. Gallerneault, V. Fallah, A. Howells, W. M. T. Gallerneault

    "The occurrence of recrystallization in cold-worked aluminum sheet during the brazing process leads to loss of strength, an inhomogeneous grain structure and reduced corrosion resistance. AlMgScZr all

    Jan 1, 2018

  • CIM
    Metallurgical Optimisation after the Replacement of two BOF Vessels at Dillinger Hütte/Germany

    By V. Fiedler, H. Lachmund, R. Bruckhaus

    "After producing some 50 million tonnes of crude steel the two BOF vessels at Dillinger Hüitte steel plant had to be replaced in 2000/01 due to large deformations. The new vessel design was optimised

    Jan 1, 2004

  • CIM
    40 Years of Flash Smelting Operations in Huelva: Learning from our History

    By J. C. Moreno, G. Rios, M. Palacios

    The Huelva smelter was commissioned in 1970 coinciding with the shutdown of the old smelter in the Rio Tinto mine site. That new smelter consisted of two Momoda blast furnaces with a capacity of 500 d

    Jan 1, 2014

  • CIM
    Wear of High Speed Steels as Materials for Bearings in Aero-Gas Turbines

    By R. Ghomashchi

    Wear, fatigue and corrosion are the most widely encountered modes of failure in materials used in engineering applications, including aero-gas turbines. Although wear is distinctly classified as adhes

    Jan 1, 2005

  • CIM
    Measurement of CTOD Using Area of Load/Plastic CMOD For SE(T) Samples

    By G. Shen, W. R. Tyson

    In most fracture toughness test standards, such as ASTM E 1290 and BS 7448, crack-tip opening displacement (CTOD) is measured by using three-point bend (SE(B)) or compact (C(T)) samples with deep crac

    Jan 1, 2005

  • CIM
    Comments on "The Estimation of Mineralized Veins: A Comparative Study of Direct and Indirect Approaches," by D. Marcotte and A. Boucher

    By Michel Dagbert

    "In their paper, Marcotte and Boucher (2001) cast some new light on the old problem of 2D estimation of vein-type deposits with thickness and grade of intercepts. Using a theoretical approach, some ex

    Jan 1, 2001

  • CIM
    The Murray Brook Deposit, Bathurst Camp, New Brunswick: Geologic Setting and Recent Developments

    By M. P. Rennick, D. M. Burton

    Abstract -The Murray Brook massive sulfide deposit, which was the first geochemical discovery in the Bathurst camp, is one of the largest sulfide deposits in the area. The massive sulfides are hosted

    Jan 1, 1992

  • CIM
    An Exploration Application for Lead Isotope Ratios, Stewart Mining Camp, Northwestern British Columbia

    By Dani J. Alldrick, Alastair J. Sinclair, Colin I. Godwin

    "The Stewart mining camp has a long history of precious and base metal mining. The camp is abundantly mineralized, with more than 200 widespread, varied, vein prospects, deposits and orebodies. These

    Jan 1, 1993

  • CIM
    Bent Beam Coupon Testing for the Investigation of Stress Corrosion Cracking in Rockbolts

    "Coupon testing has been used to investigate stress corrosion cracking (SCC) of rockbolts in a laboratory based experimental program. This program has focused on the use of ASTM G39 three- and four-po

    Jan 1, 2015

  • CIM
    Iron Ore Company of Canada ZV Concentrator: Flowsheet Description and Process Development

    By G. Gagnon

    "HistoryMining of the Schefferville iron deposits began in 1954 on completion of the 357 mile railway linking the mines and the St-Lawrence river port of Sept-Iles. Apart from crushing, no treatment o

    Jan 1, 1981

  • CIM
    Innovative Techniques Employed to Construct Slurry Cutoff Trench for Syncrude's Beaver Creek Dam

    By Michael T. G. Brown

    Syncrude Canada Ltd. has recently completed construction of its ambitious tar-sand mining and processing facilities at Mildred Lake, Alberta. The Syncrude site is approximately 48 km (30 miles) north

    Jan 1, 1979

  • CIM
    A Framework for Integrating Mine Ventilation Optimization (MVO) with Ventilation On Demand (VOD)

    By A. J. Basu

    Air quality in underground mining operations can fluctuate significantly during the working day, but until recently the only way to ensure a mine had sufficient air quality was to over-ventilate and,

    Aug 1, 2013

  • CIM
    Process Engineering for the Freeforming of Al-Based Components using CSC-MIG Welding:

    By S. Brophy

    Controlled Short Circuit ? Metal Inert Gas (CSC-MIG) welding is a process that can be referred as a "Cold Welding" technology. The CSC process is based on accurate control of the welding wire position

    Jan 1, 2011

  • CIM
    Alternative to Improve the Traditional Chinese Copper Smelter

    By S. Demetrio

    China has a traditional segment of Copper Smelters with its own Chinese technology, typically small in size from 20.000 to 50.000 tCu/a, and they are responsible for the processing and production of m

    Jan 1, 2007

  • CIM
    Review of Methods for Removing Pollutants from Flue Gases in "Clean Coal Technologies"

    By M. R. Shadnam

    This contribution provides an assessment of research and development efforts to optimize SOx, NOx and mercury capture in flue gas. Coa, characteristics and combustion conditions in a power plant have

    Jan 1, 2010

  • CIM
    Quasi-Real Time Seismic Hazard Maps for Mining (336da3c3-b002-41ab-b591-f666f29da050)

    By Marty Hudyma

    Mining-induced seismicity and rockbursting is one of the primary risks in deep mines. Seismic data management software has been created to facilitate analysis of mining-induced seismicity. The Mine Se