    Performance of Large Low- and High-Aspect Ratio SAG Mills at Gold Fields’ Ghanaian and Australian Mines

    By Michael I. Brittan, Craig M. Sams

    "Economies of scale and the variable characteristics of many large ore deposits have resulted in grinding installations using very large SAG mills fitted with variable speed drives. Low-aspectratio si

    Jan 1, 2006

  • CIM
    A New Method for the Stabilization of Arsenic from Enargite Concentrates

    By R. Barbaroux, B. Dubreuil, D. Lemieux, K. Nasrallah, G. Garcia Curiel

    "As conventional, base or precious metal ores are being depleted worldwide, the mining industry is being faced with an increasing exploitation of arsenical sulfidic ores. Enargite is a common example.

    Jan 1, 2017

  • CIM
    Replacement of Classification Screens with Cyclones in the McArthur River Uranium Mine Grinding Circuit

    By Ken Dyck, Chuck Edwards

    "Cameco's McArthur River is the world's largest high grade uranium mine. Production started in late 1999. Cameco carried out the engineering design and construction management for the McArthur River p

    Jan 1, 2004

  • CIM
    The safety imperative?transforming the workplace to protect people

    By G. Winkel

    Safety conditions in industry have greatly improved over time. However, around the world, in Canada, and in each province or territory, people are still the victims of serious industrial accidents. Th

    Sep 1, 2004

  • CIM
    High Pressure Grinding Rolls (HPGR) - In Comparison to SAG Milling Technology

    By Hassan Ghaffari

    ? HPGR Process/Overview ? HPGR vs. SAG ? The Manufacturers ? Mine Operations using HPGR ? Projects by Wardrop/Tetra Tech ? Economic Benefits ? Questions Main Operating Parameters ? Press Force

    Aug 1, 2013

  • CIM
    The Role of Alumina in Slags

    By F. E. Lathe

    INTRODUCTION THE present study, based largely upon phase equilibrium diagrams and other theoretical considerations but nevertheless addressed primarily to the practical metallurgist, has been underta

    Jan 1, 1951

  • CIM
    Experiences from Implementation of Advanced Process Control Projects

    By E. Sharifi

    Advanced Process Control (APC) has been one of the most beneficial tools in the past decades available to minerals processing industry. Low capital cost together with significant improvements in proce

    Jan 1, 2014

  • CIM
    Terrestrial Heat Flow in the St. Lawrence Lowland of Quebec_

    By T H. Clark, R P. Doig, V. A. Saull, R B. Butler

    Terrestrial heat flow has been determined for four boreholes in the Montreal area. The mean value of the results (uncorrected for glacial effects) is 0.790 ± 0.053 x 10-6 cal/ cm2/sec (95 per cent con

    Jan 1, 1962

  • CIM
    Necessity Driving Change and Improvement to the Cleaner Circuit at Lumwana Copper Concentrator

    By G. Cordingley, A. Mwanza

    Lumwana is an open pit Copper mine located in the Northwestern Province of Zambia approximately 80 km west from the provincial capital of Solwezi, approximately 300 km northwest from the Copperbelt an

    Jan 1, 2014

  • CIM
    Industrial Minerals of Canada in 1938

    By L. H. Cole

    FOR many years Industrial Minerals, or as they were formerly called, 'the Non-Metallic Minerals', compared with the metallics, were considered of only minor importance and as such were given

    Jan 1, 1939

  • CIM
    Remote Real-Time Tire Monitoring in Open Pit Mines

    By Joel T. Werner

    Tire costs represent one of the highest controllable costs in open-pit mining, accounting for approximately 10% of mining costs. Tire monitoring technology has evolved rapidly in recent years and is e

    May 1, 2002

  • CIM
    Long-term planning at Raglan (b8ce356e-c666-4ad8-a03a-11ba76659079)

    By L. W. T. Weitzel

    "This paper reviews the Falconbridge- SMRQ’s Raglan project in northern Quebec and the process that was used in developing its current long-term mine plan. Challenges were many and not only limited to

    Jan 1, 2003

  • CIM
    Towards Optimum Value in Underground Mine Scheduling

    By Bryan M. Maybee

    The scheduling of underground mining activities is a complex task, in particular because of the requirement to satisfy a large number of constraints. A Schedule Optimization Tool (SOT) for underground

    May 1, 2009

  • CIM
    Average Relative Error in Geochemical Determinations: Clarification, Calculation, and a Plea for Consistency (31b12265-3348-4f2c-b091-f58cbc224f80)

    "The measurement of error in assays collected as part of a mineral exploration program or mining operation historically has been undertaken in a variety of ways. Different parameters have been used to

    Jan 1, 2007

  • CIM
    Folding And Faulting of the Wabana Ore Deposits

    By J. B. Gilliatt

    The discovery of ore at Wabana was quickly followed by the mining of the ore beds where they outcropped in the land areas. The third phase, as at present carried out, consists of extensive submarine o

    Jan 1, 1924

  • CIM
    Assessing Vertimill Ultrafine Grinding Performance: The Gibraltar Mine Case

    By Keith Merriam, Jim McDonnell, Peter Radziszewski, Rob Rotzinger, Ian DeHart

    "Taseko Mines Limited Gibraltar copper-molybdenum mine recommenced operation in 2004 with the initiation of a series of development projects to increase throughput capacity as well as modernize the mi

    Jan 1, 2015

  • CIM
    Magnetic Gold: Losses from a Gold Recovery Circuit

    By Adil Aledresse, N. Emre Altun, Bern Klein, Nuri Hmidi, Brent Hilscher

    A study was conducted to investigate high gold grades in water lines and carbon fines collected from the Musselwhite gold recovery circuit. It was discovered that fine magnetic particles in the overfl

    Jan 1, 2014

  • CIM
    ntroduction of the Autoloader at Mattagami Lake Mines

    By G Anders

    The mucking out of sub-level headings by slusher and by Autoloader is described, and the performance and costs of both methods are compared. The introduction of the Autoloader is taken as an example t

    Jan 1, 1965

  • CIM
    Partial Roasting of Copper Concentrate with Stabilisation of Arsenic and Mercury

    By K. Lundholm, M. Andersson, L. Nevatalo, Å. Holmström, L. Hedström

    "Several copper deposits have the arsenic bearing minerals enargite (Cu3AsS4) and tennantite (Cu12As4S12). Since this mineral contain both arsenic and copper, it is not possible to remove the arsenic

    Jan 1, 2014

  • CIM
    Review of Self-Heating Testing Methodologies

    By J. E. Nesset, F. Rosenblum, J. A. Finch

    "The self-heating of sulphides can be a major hazard in mining operations and concentrate handling, particularly during transportation and associated storage. Self-heating results from the oxidation o

    Jan 1, 2014