Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Paste Production Storage Mechanism (PPSM), a Major Advance in Solids Concentration Technology
By Rudy Tenbergen, Dick Farmery, Jim Naylor
"Paste backfill has replaced cemented rock fill as one of the components to improve ground · control and mine safety at the Macassa Operation of Kinross Gold Corporation in Kirkland Lake, Ontario. It
Jan 1, 1997
-
Mining Operations and Slurry Pipelines Update and Future
By R. A. Hill, J. D. Pitts
"Long distance slurry pipeline systems have been successfully trans-porting steam coal, iron concentrates, copper concentrates and limestone for an aggregate of nearly 60 years and nearly three billio
Jan 1, 1978
-
Grinding Circuit Improvements at Barrick Cortez Gold Mine
By James R. Wickens, David La Rosa, Robert E. McIvor, Adrian Dance
"The comminution circuit at Barrick Cortez Gold Mine uses an open circuit primary jaw crusher followed by a standard SABC grinding circuit. The grinding circuit incorporates a 26’Ø x 11’ SAG mill, an
Jan 1, 2009
-
Development of a 3D Modeling System For the Monitoring of the Daniel-Johnson Dam
By Vincent Roy
Numerous on going activities at the Daniel-Johnson Dam : ? Surveillance / monitoring ; ? Structural investigations & evaluation ; ? Injection work ; ? Crack mapping ; ? Instrumentation management
Aug 1, 2013
-
Case Study of Plant Trial on the Improvement of Gold Recovery of Preg-Robbing Ores by Surfactant
By H. Cay, J. Zachwieja, T. Esplin, R. Ravenelle, T. Olsen-Tank
Barrick Goldstrike mine utilizes a carbon-in-leach (CIL) circuit to simultaneously leach gold into solution with cyanide and adsorb the gold-cyanide complex onto activated carbon for further refinemen
Jan 1, 2014
-
Towards a Better Understanding of Stirred Milling Technologies - An Overview of Scale-Up Methodologies
By Adam Moore, Peter Radziszewski, Matt Gallimore
"Stirred mill technology dates back to 1928 where the idea to use “an agitator and spherical grinding media” was presented. In the context of the mining industry, interest in stirred milling technolog
Jan 1, 2016
-
Bumps in No. 2 Mine, Springhill, Nova Scotia (6b22a26e-d82e-4ce9-8c21-9da88f205566)
By Walter Herd
For the past eight years, No. 2 mine of the Cumberland Railway & Coal Co., Springhill-a subsidiary of the Dominion Coal Co., Ltd.-has had an unenviable reputation for bumps. As the workings extended i
Jan 1, 1929
-
Continuous SAG Volumetric Charge Measurement
By Andre Vien, Jean-François Dupont
"Over the past several years, Svedala has developed a continuous charge monitor (CCM) for tumbling mills. It consists of a strain gauge embedded into a rubber lifter and associated electronics. This p
Jan 1, 2001
-
Encapsulation of Mercury in Gossan Tailings Murray Brook Mine, New Brunswick, Canada
By Robert Harris, Peter Pheeney
"The Murray Brook gold mine operated from September 1989 to March 1991. Approximately 1.2 million tonnes of gossan were mined from an open pit and treated at a rate of 900 tonnes per day. The facility
Jan 1, 2001
-
Discovery and first production of diamonds in the Northwest Territories
By Jon A. Carlson, W. Scott Williams
The EKATI"" Diamond Mine commenced operation in October 1998. It is operated by BHP Diamonds Inc., which is a part of the Non-Ferrous and Industrial Materials Division of BHP Minerals, a business unit
Jan 1, 2001
-
Improved Concentrate Grade and Recovery through the Application of the 6 Sigma Methodology at Noranda Matagami Mill
By Martin Plante, Denis Hamel, Marie-Pier Bédard, Jeff McLaughlin
"The results and methodology for the optimisation of the zinc flotation circuit at the Matagami Mill using the 6-Sigma methodology are shown in detail while only the base line and final results are pr
Jan 1, 2001
-
Management of Copper Solvent Extraction Plants Running At Reduced Throughput
By D. Kachongo, Y. Cheng, A. Kashala, D. Samal, G. Mitshabu
Many copper processing flowsheets in the Democratic Republic of Congo include the leaching of oxide ores containing copper and cobalt, copper solvent extraction, copper electrowinning, and precipitati
Jan 1, 2019
-
Andritz Metals Spray-Roast Acid Regeneration Pilot Plant
By S. K. Mitterecker, T. Hofbauer, F. Baerhold
"Acid regeneration is a very important process step in each acid leach circuit. It is required to recover dissolved metals and HCl from spent leaching acid. Andritz Metals presents its recently commis
Jan 1, 2016
-
The integration of condition monitoring into the maintenance process (16e8fde4-e738-4229-a500-8c29dcc904ed)
By M. W. Lewis, J. Werner
Fluctuating metal prices, declining head grade, and increased operational costs are forcing many open pit mining companies to look to their balance sheets for significant cost reductions in order to r
Jan 1, 2005
-
Introduction -Papers on Cemented Backfill
By J. R. Emery, D. F. Coates
"FOUR PAPERS ON CEMENTED BACKFILL were given at the Annual General Meeting of The Canadian Institute of Mining and Metallurgy in 1970:Weaver, W. S., and Luka, R., ""Laboratory Studies of Cement-Stabil
Jan 1, 1970
-
Optimising Plant Feed Quality and Process Performance Using Geoscan Elemental Analysis (ca3c00f6-f1ec-4b33-9dcb-bab9729026ee)
"Geoscan is used for multi-elemental analysis of conveyed bulk materials in the minerals industry with proven performance and demonstrated paybacks of weeks or months in iron ore, manganese, copper, z
Jan 1, 2016
-
A liquefaction incident in a fill raise: A case study
By F. Hassani, K. Moozar, J. Ouellet, P. Gauthier
"This paper describes a sudden spill of waste rock used for backfilling from a waste pass at an underground mine in Canada, thus causing a major failure/accident. The mine operator immediately launche
Jan 1, 2004
-
Simple Mechanisation of Narrow Vein Deposits in South Africa
By Julian Wills
The Candrill was developed with Soredem as a one-operator rockdrill for Canadian narrow vein mining. It provides the benefits of increased drilling rates, lower noise and vibration, mass reduction of
Oct 1, 2001
-
Hollinger Shaft Practice
By V. J. Southey
HOLLINGER mining operations have required development by 24 vertical shafts having a total length of 28,160 feet. Seventeen of these are sunk from surface and seven are interior shafts. Four surface s
Jan 1, 1939
-
Leaching Of Copper Flash Furnace Dusts with Weak Acid Bleed and Arsenic Precipitation as Scorodite and Arsenical Jarosite
By A. Roca, G. Ríos, I. Ruíz, M. Cruells
Flash Smelting Furnace (FSF) hot dust-laden is cooled in a waste heat boiler (WHB) and then dedusted in electrostatic precipitators (ESP’s) before being treated, together with the Peirce Smith Convert
Jan 1, 2019