Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Virtual Reality Scientific Visualisation – A Solution for Big Data Analysis of the Block Cave Mining System

    By J Tibbett, A Colebourn, B Hebblewhite, F Suorineni

    The concept of Big Data refers to data sets that are so large, variable and/or complex that traditional data processing applications struggle to integrate the data for effective investigation, analysi

    Nov 4, 2015

  • AUSIMM
    Decision Support for an Underground Gold Mining Operation - A Case Study using the Schedule Optimisation Tool

    By B Maybee, L Fava, D Millar

    In the context of a case study for an underground gold mine, the value generated by a schedule optimisation tool (SOT) is assessed. SOT is a software tool for underground mine planning that maximises

    May 24, 2012

  • AUSIMM
    Exploration and Geology of the Goodall Gold Mine

    By D R Quick

    The Goodall gold mine is located 30 km east of Adelaide River, within the Pine Creek 1:250 000 map sheet, at 8 525 000 mN: 750 000 mE, on the AMG grid. The first gold was poured in April 1988 and th

    Jan 1, 1994

  • AUSIMM
    A Formal Approach to Economic Analysis of Pit Slope Design

    By Coates D. F, Neil T. J, O&apos

    A proper economic analysis of pit slope design must reflect the trade-off between the benefits and the increased risks of slope fail- ure inherent in steeper slope angles. However, no formal framewo

    Jan 1, 1977

  • AUSIMM
    Downstream impacts of Grade Engineering and preconcentration

    By J Salaya, J Kwak, L Keeney, S Dehkhoda

    In addition to volatile commodity prices influencing decision making, in recent years, social and environmental performance have become important decision drivers within the mining industry. There are

    Nov 10, 2020

  • AUSIMM
    Longwall Extraction at South Bulli Colliery

    The Bellambi Coal Company Limited com menced longwall mining at South Bulli Colliery in 1965. At present it operates three long- wall units in two seams. Although results to date have been less succ

    Jan 1, 1976

  • AUSIMM
    Diesel Particulate Matter in Underground Mines ù Controlling the Risk

    By F Djukic, T Fisher, G Irving

    Questionnaires were sent to 12 underground metalliferous mines in Queensland to enquire how these mines control diesel emissions from mobile diesel engines used underground. Where responses or control

    Jan 1, 2007

  • AUSIMM
    Experimental study and thermodynamic modelling of phase equilibria in the FeO-FeO1.5-SbO1.5-SiO2 system in equilibrium with metal

    By C Zschiesche, alam, A Abadias Llamas, A K

    An integrated experimental and thermodynamic modelling study of the phase equilibria in the FeOFeO1.5- SbO1.5-SiO2 system in equilibrium with liquid Sb and Sb-Ag metal has been undertaken to develop t

    Jun 17, 2024

  • AUSIMM
    The Ore-Deposits of Captain's Flat, New South Wales

    The revival of the mining industry at Captain's Flat after a long period of years of inactivity has attracted attention to the importance of the ore-deposits of that field as potential sources of

    Jan 1, 1941

  • AUSIMM
    Physical and Mechanical Characterisation of Paste Backfill by Laboratory and In-Situ Testing (6467738c-7044-43a0-9a73-ca12bdc18202)

    By Bidwell TJ, Servant S

    Paste back-fill technology is gaining rapid acceptance in the Canadian mining industry. The authors were able to work on four different mining sites employing paste technology in their operation. In

    Jan 1, 1998

  • AUSIMM
    Comparison of Diamond Drill Size on Iron Ore Geometallurgical Results

    By T Sua, B Wright

    "BHP Billiton West Australian Iron Ore (WAIO) conducts an extensive geometallurgy program for its iron ore deposits in the Pilbara with the focus on determining the lump yield (the mass percentage of

    Jun 15, 2016

  • AUSIMM
    Optimised drill targeting using dynamic 3D modelling, Martabe Gold Mine, Indonesia

    By H Indirawati, R Ayres, A Nur Kasnanto, S Konopa

    As a project moves through the mine life cycle, the quantity of data available increases and the understanding of the orebody matures. Incorporating new information quickly and efficiently in current

    Nov 21, 2018

  • AUSIMM
    Advancements in Condition Monitoring on Mill Drive Trains for Proactive Maintenance and Early Fault Detection Purposes

    By T Roesch, M Neurohr, S Stratton

    "Dwindling commodity prices are forcing today’s mining operations to increase output. Sometimes the solution is to upgrade the existing infrastructure; however, in most cases it has to be achieved wit

    Oct 10, 2016

  • AUSIMM
    Efficient material descriptions for modelling high-temperature processes

    By J H. Zietsman

    The transition to more sustainable metal production is receiving much attention at present, and the iron and steel industry is at the centre of the conversation. New, more environmentally friendly pro

    Aug 21, 2024

  • AUSIMM
    Special Problems of Management General Report (ee1c3839-95c3-44a2-8c39-4d3652a67bb4)

    The three papers reviewed here consider different problems of mine management. Comparison of two of the papers demonstrates a marked contrast between the old and the new, in terms of mine management

    Jan 1, 1988

  • AUSIMM
    Analysis and Adaptability of Belt Filter Presses and Other Technologies for Tailings Dewatering over a Range of Mineral Processes, Plant Designs, Conditions, Regions and Operating Philosophies

    By M S. Fenzel

    Increased environmental regulations and pressures have created changing and new demands for tailings management strategies in a variety of mining applications. Critical among these items is the dispos

    Jul 27, 2015

  • AUSIMM
    Utilization of Victorian Brown Coal-Future Prospects

    By Royston D

    Victoria has an extensive brown coal resource, 202,000 Mt, of which 43,300 Mt is regarded as readily recoverable. This brown coal is located principally in the Latrobe Valley as thick seams and is

    Jan 1, 1987

  • AUSIMM
    Muck Pile Shaping for Draglines and Dozers at Surface Coalmines

    By M Nagarajan, S Esen

    This paper presents three case studies from three surface coalmines. The first case study is from a coalmine where a dragline operates in 60 m wide and 1 km long strips. Typical overburden height rang

    Aug 24, 2015

  • AUSIMM
    Sludge Conditioning Technology to Reduce Sludge and the Cost of Acid Mine Drainage Treatment

    By K Banerjee, C Dube

    Veolia Water Technologies was contracted by a global coal mining company to design a retrofit acid mine drainage treatment facility using DenseSludge™ technology on a former coal refuse disposal site.

    Jul 27, 2015

  • AUSIMM
    Has there been progress on nano Diesel Particulate Matter in the Australian underground hard rock industry?

    By C W. Davis

    Every diesel engine emits approximately 100 million nano diesel particles (nDP) per cubic centimetre of raw exhaust. Each nDP has a diameter of between 50 and 70 nano metres or 1/100th the size of red

    Mar 15, 2021