Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Coal Resource Planning in the Hunter RegionBy Short KC
The Hunter Region, with a major part of the coal resources of New South Wales and a long history of coal mining, has experienced a rapid expansion of coal resource development in recent years. Whi
Jan 1, 1987
-
Work Organisation for Attractive Mining – Lean Mining and the Working EnvironmentBy J Johansson, J Lööw
Attractive mining workplaces are good, safe and healthy environments. They are also workplaces that the workforce of the future wants to work in. As skilled miners and engineers are already scarce, th
Nov 4, 2015
-
Design and Construction Contract C916 Beauty World Station and Tunnels, SingaporeBy R McDonough
DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal
Sep 17, 2014
-
Multi-Stage Stochastic Optimisation for Managing Major Production IncidentBy R Razanatsimba, A Galli
A mining company has entered into contractual commitments to supply certain quantities of its product to clients in each time period. Failure to fulfil its obligations would damage its reputation as a
Sep 26, 2011
-
Carbon-in-Pulp in South AfricaThe carbon-in-pulp (CIP) process is now well established in the South African gold industry, with a total of over I million metric tons of material being treated each month in six large plants. This
Jan 1, 1982
-
Implementation of the BIOX® process at the Runruno Gold projectBy J A. van Niekerk, J G. Jardine, J W. Olivier
The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-
Sep 11, 2017
-
The Application of Ausmelt's AM28 Alkyl Hydroxamate Flotation Reagent to Fox ResourcesÆ West Whundo Copper Ore at Radio Hill, Western AustraliaBy K Lee, L Mann, J Bygrave, G Sheldon
Ausmelt is supplying commercial quantities of an alkyl hydroxamate flotation collector AM28 for flotation of oxide and supergene base metal ores and tailings. AM28 is a non-hazardous product used as a
Jan 1, 2007
-
A Study on the High-Water Solidifying Materials for Gob-Along Roadside instead of Coal PillarsBy Yin J, Sun H
A new technology has been introduced - the use of the High-Water Solidifying Material for providing pumped roadside supports to maintain a roadway for re-use in longwall retreating. As a gob edge s
Jan 1, 1992
-
Example of a Dynamic Flotation FrameworkFroth flotation is widely used for the separation of particulate materials in the world. It is a complex process whose operational behaviour in process plants is difficult to predict. A comprehensive
Jan 1, 2005
-
Controls on Disseminated Gold Mineralisation at Fosterville, Victoria, AustraliaThe Fosterville Goldfield has a modest past production (0.3 Moz), but is now emerging as a significant goldfield (2.6 Moz resources, including 1.1 Moz reserves) with implications for exploration withi
Jan 1, 2005
-
Brisbane Airport Link Project – Design and Construction of the 26 m Span Kedron Caverns: Comparing Monitoring Data with the DesignBy I Coombes, M Trim, Y Sun, M McRae, A Spiegl, H Lagger, A Amon, P Barraclough, M Villeneuve
The Brisbane Airport Link Project (AirportlinkM7) includes the design and construction of more than 12.5 km of tunnels, with the Kedron interchange including four ramp tunnels that intersect with main
Sep 17, 2014
-
Effects of Melt Composition on the Interactions of Sinter Melt on a Natural Iron Ore SubstrateBy S Hapugoda, J R. Manuel, M P. Ma, L Lu
Iron ore sinter quality depends heavily on the mineralogy, textures and physical structure of the sinter, which is formed upon solidification of the primary sinter melt. The interactions of the initia
Aug 12, 2013
-
Design Developments of the Jameson CellBy S Bourke, R Stone, B Hill
Since Jameson Cell flotation technology was first installed in a coal flotation application in 1988/89 at Newlands Coal Handling and Preparation Plant (CHPP) there have been fundamental improvements t
Jan 1, 2005
-
Measurement and Assessment of Bulk Explosive ProductsBy G Cavanough, A Olsson, J Rock, A C. Torrance
There are various methods currently in use to determine detonation performance of bulk explosive products including velocity of detonation (VOD), high speed photographic analysis, fragmentation analys
Aug 24, 2015
-
Integration of Mine Planning with Groundwater Modelling to Optimise Mine Closure Plans at the Marillana Creek (Yandi) MineBy K Rozlapa, P Waters, H Middlemis
A major challenge for closure planning at mining operations below the water table is evaporation from final void pit lakes and concentration of salts, which can impact on downstream groundwater (and s
Jan 1, 2006
-
Mine Planning and Geotechnical Considerations in the Development of the Western Baters of Yallourn Open Cut MineBy Tilley H. L
The 90 m deep Yallourn Open Cut brown coal mine in the Latrobe Valley, Victoria is developing into an area close to a reverse fault. A major batter stabilisation program, matched to ongoing operatio
Jan 1, 1989
-
Six Metre Raisboring at Z.C. MinesProduction from a major, deep orebody requires the construction of two 6 m diameter, 1000 m deep ventilation shafts over the next three years. Further ventilation upgrades have foreshadowed an ad
Jan 1, 1988
-
Criteria for Safe Mining under the Surface Water Accumulations in Velenje Lignite MineBy Ribicic M, Kocar F
Surface lakes or water accumulation present a possible threat for the flooding of the underground mining works. Therefore, the criteria that define the conditions under which no flooding of the mini
Jan 1, 1988
-
Sublevel Cave Drop Down Strategy at Perseverance Mine, Leinster Nickel OperationsBy P A. Jenkins, I W. O Jones
WMC has mined the Perseverance disseminated orebody exclusively by SLC (sublevel cave) methods. Deteriorating ground conditions in the vicinity of an orebody inflection forced a re-evaluation of futur
Jan 1, 2000
-
The Electrostatic Precipitation of Suspended Particles from GasesBy Marshall K. I
THE problem of satisfactorily eliminating the fumes and dust which are unavoidably produced in various metallurgical and manufacturing industries is one which has received considerable attention in th
Jan 1, 1923