Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Some Aspects of Pillar Stability in Underground Coal Mines
Working in thick coal seams presents many problems, included in these is obtaining the maximum recovery of coal under safe working conditions. In order to obtain maximum extraction it is important to
Jan 1, 1989
-
Iron ore benefits from neutron pulsed geochemical tools
By R A. M Maddever, P Jeanneau, V Flahaut
Over the entire life cycle of a mine, from early resource evaluation to the blasting of benches, the collection of geochemical data is crucial for the site operator, who must routinely and intensively
Jul 24, 2017
-
Lake Cowal Foundation- Environmental and Community Sustainability Beyond the Mine Fence
By D Johnston
Within the first full year of BarrickÆs Cowal Gold Mine operation, the Lake Cowal Foundation Limited (LCF) has already been delivering results consistent with its goal to protect and enhance the natur
Jan 1, 2007
-
Manufacturing of FeSiB high-temperature phase change material by silicothermic reduction
By W Polkowski, M Tangstad, M Wallin, J Jiao
Fe-26Si-9B (wt per cent) alloy has been identified as a potential high-temperature phase change material (PCM) due to its attractive properties, such as its high latent heat of fusion and low volumetr
Jun 19, 2024
-
Stacking and Reclaiming Facilities at South Blackwater Coal Mine, Queensland
By Hoskings R
Conceptual studies of the run of mine stockpiling and reclaiming requirements at Thiess Bros Pty Ltd South Blackwater coal mine commenced in 1975.Final selection of equipment was made in 1978 and the
Jan 1, 1981
-
Analytical Approach for Stability Analysis of Rock Wedges with Soil-Infilled Joints Formed in a Tunnel Roo
By D Oliveira
The use of an equivalent continuum for a rock mass is not always suitable for situations where the failure is structurally controlled by discontinuities as in the case of wedges in the tunnel roof. In
Mar 8, 2011
-
The Superpit Schedule Model – A Time-efficient Data-driven Estimation for Short- and Medium-term Planning
By T Berryman, C Adams, L Griesel, C Buxton
The Kalgoorlie Consolidated Gold Mines (KCGM) schedule model is used for short- to medium-term planning and scheduling at the Fimiston Open Pit Mine (the Superpit). The model bridges the gap between g
Aug 18, 2014
-
Notes on Practical Mining in Bendigo
In undertaking to write a few notes on practical mining in Bendigo, the great quartz mining centre of Victoria, which just now is celebrating its fiftieth anniversary of gold mining, satisfaction must
Jan 1, 1902
-
Optimal Block Estimation by Kriging
A comparison is made between elementary block estimation techniques and the optimal methods of geostatistics using data from an Australian deposit. Considerable improvement in the estimates are obtain
Jan 1, 1975
-
A Magnetic Hydrocyclone
The concept of a magnetic hydro-cyclone is undeveloped, possibly because studies by Bragard (1965) and the Royal School of Mines in London (Robinson, 1965) were not encouraging. Its role for the conce
Jan 1, 1984
-
Using Ground Penetrating Radar to Enhance the Exploration-to-mining Value Chain
By D Smith, A Ramdhani, J Francke
Ground penetrating radar (GPR), a well-established geophysical technique generally used for shallow civil engineering applications, has, in the last decade, found increasing acceptance as a complement
Aug 18, 2014
-
Developing a Training Strategy for Quality, Safe and Productive Extracting Operations
The extractive industry has been faced with a situation where there has been no systematic and formalised training and education structure available. Previous structures which were available, e.g. the
Jan 1, 1997
-
Hypersaline-Induced Reduction in Cyanide Ecotoxicity at Gold Operations, thereby Obviating Detoxification Plants
By G B. Smith, D Hillier, T Gibbons, D B. Donato, M D. Adams, S Davies, R S. Schulz
Responsible management of cyanide solutions and tailings on gold processing plants worldwide is an important aspect to these operations and is regulated via guidelines provided by the International Cy
Sep 26, 2013
-
The Use of Comminution Testwork Results in SAG Mill Design
The relationship between comminution testwork results and the milling circuit that is subsequently selected is not a direct one and frequently involves recourse to databases of past test results. This
Jan 1, 2002
-
Treatment and Rehabilitation of Acidic Waste Rock and Tailings – A 14-year Case Study
By D Blair, T Scutts, L Fergusson
This paper presents a waste rock treatment and rehabilitation program conducted at a metaliferous mine site in northern New South Wales from 2000–2013. It updates findings from 2005 for Program #1 (wh
Jul 16, 2014
-
Active and Passive Seismic Monitoring of Cave Front Evolution
By R A. Lynch
The state-of-the-art in cave seismic monitoring is reviewed, with the latest developments in active seismic monitoring included. Seismic monitoring systems are routinely used by most of the world’s bl
May 9, 2016
-
Laboratory Studies of the Treatment of Liquid Waste Streams from Uranium Milling Operations
Neutralization with lime is a simple, cheap, and effective means of treating acid raffinates from uranium processing to' raise the pH, reduce the concentrations of dissolved salts (including heav
Jan 1, 1975
-
-
A Simple Coarse Batch Particle Sizer for Plant Use
Using a cylindrical hydrocyclone with a long vortex finder as the separator, a batch sizer was developed for the fast comparative sizing of the coarse solids normally encountered in mineral pulps.Oper
Jan 1, 1968
-
The Development of a Dustless Dry Gunite Pump System in Underground Coal Mining – A Case Study
By A Golsby
Gunite was invented in 1907 by Carl Akeley to repair a crumbling facade of the Field Columbian Museum in Chicago. The method used was to blow dry material out of a hose with compressed air and inject
Aug 31, 2015