Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Some Aspects of Pillar Stability in Underground Coal Mines

    Working in thick coal seams presents many problems, included in these is obtaining the maximum recovery of coal under safe working conditions. In order to obtain maximum extraction it is important to

    Jan 1, 1989

  • AUSIMM
    Iron ore benefits from neutron pulsed geochemical tools

    By R A. M Maddever, P Jeanneau, V Flahaut

    Over the entire life cycle of a mine, from early resource evaluation to the blasting of benches, the collection of geochemical data is crucial for the site operator, who must routinely and intensively

    Jul 24, 2017

  • AUSIMM
    Lake Cowal Foundation- Environmental and Community Sustainability Beyond the Mine Fence

    By D Johnston

    Within the first full year of BarrickÆs Cowal Gold Mine operation, the Lake Cowal Foundation Limited (LCF) has already been delivering results consistent with its goal to protect and enhance the natur

    Jan 1, 2007

  • AUSIMM
    Manufacturing of FeSiB high-temperature phase change material by silicothermic reduction

    By W Polkowski, M Tangstad, M Wallin, J Jiao

    Fe-26Si-9B (wt per cent) alloy has been identified as a potential high-temperature phase change material (PCM) due to its attractive properties, such as its high latent heat of fusion and low volumetr

    Jun 19, 2024

  • AUSIMM
    Stacking and Reclaiming Facilities at South Blackwater Coal Mine, Queensland

    By Hoskings R

    Conceptual studies of the run of mine stockpiling and reclaiming requirements at Thiess Bros Pty Ltd South Blackwater coal mine commenced in 1975.Final selection of equipment was made in 1978 and the

    Jan 1, 1981

  • AUSIMM
    Analytical Approach for Stability Analysis of Rock Wedges with Soil-Infilled Joints Formed in a Tunnel Roo

    By D Oliveira

    The use of an equivalent continuum for a rock mass is not always suitable for situations where the failure is structurally controlled by discontinuities as in the case of wedges in the tunnel roof. In

    Mar 8, 2011

  • AUSIMM
    The Superpit Schedule Model – A Time-efficient Data-driven Estimation for Short- and Medium-term Planning

    By T Berryman, C Adams, L Griesel, C Buxton

    The Kalgoorlie Consolidated Gold Mines (KCGM) schedule model is used for short- to medium-term planning and scheduling at the Fimiston Open Pit Mine (the Superpit). The model bridges the gap between g

    Aug 18, 2014

  • AUSIMM
    Notes on Practical Mining in Bendigo

    In undertaking to write a few notes on practical mining in Bendigo, the great quartz mining centre of Victoria, which just now is celebrating its fiftieth anniversary of gold mining, satisfaction must

    Jan 1, 1902

  • AUSIMM
    Optimal Block Estimation by Kriging

    A comparison is made between elementary block estimation techniques and the optimal methods of geostatistics using data from an Australian deposit. Considerable improvement in the estimates are obtain

    Jan 1, 1975

  • AUSIMM
    A Magnetic Hydrocyclone

    The concept of a magnetic hydro-cyclone is undeveloped, possibly because studies by Bragard (1965) and the Royal School of Mines in London (Robinson, 1965) were not encouraging. Its role for the conce

    Jan 1, 1984

  • AUSIMM
    Using Ground Penetrating Radar to Enhance the Exploration-to-mining Value Chain

    By D Smith, A Ramdhani, J Francke

    Ground penetrating radar (GPR), a well-established geophysical technique generally used for shallow civil engineering applications, has, in the last decade, found increasing acceptance as a complement

    Aug 18, 2014

  • AUSIMM
    Developing a Training Strategy for Quality, Safe and Productive Extracting Operations

    The extractive industry has been faced with a situation where there has been no systematic and formalised training and education structure available. Previous structures which were available, e.g. the

    Jan 1, 1997

  • AUSIMM
    Hypersaline-Induced Reduction in Cyanide Ecotoxicity at Gold Operations, thereby Obviating Detoxification Plants

    By G B. Smith, D Hillier, T Gibbons, D B. Donato, M D. Adams, S Davies, R S. Schulz

    Responsible management of cyanide solutions and tailings on gold processing plants worldwide is an important aspect to these operations and is regulated via guidelines provided by the International Cy

    Sep 26, 2013

  • AUSIMM
    The Use of Comminution Testwork Results in SAG Mill Design

    The relationship between comminution testwork results and the milling circuit that is subsequently selected is not a direct one and frequently involves recourse to databases of past test results. This

    Jan 1, 2002

  • AUSIMM
    Treatment and Rehabilitation of Acidic Waste Rock and Tailings – A 14-year Case Study

    By D Blair, T Scutts, L Fergusson

    This paper presents a waste rock treatment and rehabilitation program conducted at a metaliferous mine site in northern New South Wales from 2000–2013. It updates findings from 2005 for Program #1 (wh

    Jul 16, 2014

  • AUSIMM
    Active and Passive Seismic Monitoring of Cave Front Evolution

    By R A. Lynch

    The state-of-the-art in cave seismic monitoring is reviewed, with the latest developments in active seismic monitoring included. Seismic monitoring systems are routinely used by most of the world’s bl

    May 9, 2016

  • AUSIMM
    Laboratory Studies of the Treatment of Liquid Waste Streams from Uranium Milling Operations

    Neutralization with lime is a simple, cheap, and effective means of treating acid raffinates from uranium processing to' raise the pH, reduce the concentrations of dissolved salts (including heav

    Jan 1, 1975

  • AUSIMM
    Remediation of Mine Seepage at Batu Hijau

    Remediation of Mine Seepage at Batu Hijau

    Sep 13, 2010

  • AUSIMM
    A Simple Coarse Batch Particle Sizer for Plant Use

    Using a cylindrical hydrocyclone with a long vortex finder as the separator, a batch sizer was developed for the fast comparative sizing of the coarse solids normally encountered in mineral pulps.Oper

    Jan 1, 1968

  • AUSIMM
    The Development of a Dustless Dry Gunite Pump System in Underground Coal Mining – A Case Study

    By A Golsby

    Gunite was invented in 1907 by Carl Akeley to repair a crumbling facade of the Field Columbian Museum in Chicago. The method used was to blow dry material out of a hose with compressed air and inject

    Aug 31, 2015