Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Characterization of Tensile and Shear Loading on Smooth and Indented Wires and PC–strand Cable Bolts

    By Steven Derycke, Stephen C. Tadolini, Anand Bhagwat

    "The tensile and shear strength of intrinsic bolting support systems has always been a major concern of designers. A comprehensive laboratory testing program was designed to evaluate the tensile and s

    Jan 1, 2015

  • SME-ICGCM
    Development of a New Roof Bolt Technology to Improve Gate- Road Performance

    By Vince Caggiano

    The newly developed Hilti OneStep roof bolt combines the standard 5-step anchoring process (i.e. drilling, transfer of drill steel, insertion of resin, insertion of rod and tightening) into one easy o

    Jan 1, 2005

  • SME-ICGCM
    Coal Combustion Byproducts-Based Artificial Mine Supports - Recent Developments

    By Y. P. Chugh

    The use of wooden supports, supplementary to the primary method of roof control using roof bolts in mines, consumes over 3 million cubic meters of hardwood in the U.S. annually. These supports arc pri

    Jan 1, 2004

  • SME-ICGCM
    The Failure Mechanism and Control Technology of Coal Wall of a Large Mining Height Panel

    By Dezhong Kong, Jaichen Wang, Shengli Yang

    "The stability control of longwall coal face is the key technology of large-cutting-height mining method. Therefore, a systematic study of the factors that affect coal face stability and its control t

    Jan 1, 2015

  • SME-ICGCM
    The Stress Measurement and Underground Engineering

    By Ding Xu Chu

    There are many methods developed for measuring the crustal stress in China. Among them only two methods have been adopted in practice, i.e., overcoring method (for which the sensors include: Piezo-mag

    Jan 1, 1987

  • SME-ICGCM
    In-Situ Investigation Into The Causes Of Falls Of Roof In South African Collieries

    By J. Nielen van der Merwe

    The main objective of the research described in the paper was to determine the causes of falls of roof in South African coal mines. The south African Colliery Manager's Association and the member

    Jan 1, 2001

  • SME-ICGCM
    Vertical Stress Redistribution Around A Retreating Longwall Face End

    By D. A. Payne

    Large excavations, such as Iongwall panels, result in extensive vertical stress redistribution in the surrounding strata. The large abutment stresses developed may produce damage to pre-existing or pl

    Jan 1, 1995

  • SME-ICGCM
    FDM Prediction Of A Yield Pillar Performance In Conjunction With A Field Trial

    By H. Yavuz

    A Numerical modelling study using the two dimensional finite difference code "FLAC" was performed for investigating the ability of numerical modelling to predict the performance of yielding pillars. T

    Jan 1, 2001

  • SME-ICGCM
    Field Testing of a Real Time Roof Mapping Drilling Display System in a Limestone Mine

    By Craig Collins

    The objective was to develop a Real Time Drilling Display System for Rotary Roof Bolting using Analyzing Software to display mapped holes as they are being drilled in real time. The Analyzing Softw

    Jan 1, 2004

  • SME-ICGCM
    Re-Use of Rectangular Bolted Roadways in a Cover Depth > 1000 M

    By Klaus Opolony

    The German coal industry operates a multi-seam extraction system, with average working depths currently around 1,000 meters. The gate roads serving the longwalls are often used for a second time - a p

    Jan 1, 2002

  • SME-ICGCM
    Investigation Of Blast Damage And Underground Stability

    By S. Paul Singh

    The implications of blast damage are harmful in both economic and physical sense. To understand the mysterious nature of blast damage assessment and prediction, field work was done by driving an exper

    Jan 1, 1993

  • SME-ICGCM
    Supercomputer Assisted Three-Dimensional Finite Element Analysis Of A Longwall Panel

    By Duk-Won Park

    The excavation of a longwall panel causes a continuous stress redistribution in the surrounding strata for every face advancement. The understanding of the behavior of rock to high level of stresses i

    Jan 1, 1989

  • SME-ICGCM
    A Novel Ground Control Program at Plateau Mining Company

    By Hamid Maleki

    A novel ground control program has been developed at Plateau Mining Company through five years of geotechnical investigations. The study was initiated to determine the causes for roof stability proble

    Jan 1, 1987

  • SME-ICGCM
    Load And Deflection Response Of Ventilation Stoppings To Longwall Abutment Loading - A Case Study (49571726-6a2d-49b8-8ef0-957c4421195c)

    By David C. Oyler

    Few studies have specifically measured and documented the large-scale loading behavior and durability of ventilation stoppings to mining induced movements, particularly from longwalls. Ventilation sto

    Jan 1, 2001

  • SME-ICGCM
    Management of the Dynamic Phenomena of Rock Pressure in Underground Mines

    By Vladimir I. Klishin

    Complex method of ruling of rock pressure is considered in conditions of rapid roof subsidence. The purpose of this method is elaboration of emergency devices into hydraulic props. Also method of unlo

    Jan 1, 1997

  • SME-ICGCM
    Longwall Surface Subsidence Prediction Through Numerical Modelling

    By Noor Mohammad

    Comprehensive numerical modelling of the subsidence associated with longwall mining in UK Coal Measures strata has been conducted and validated against UK data. The Rock Mass Classification System (RM

    Jan 1, 1997

  • SME-ICGCM
    Rockbolted Support of Retreat Longwall Gateroads at 1000m Depth: A Case History

    By Karl Brandt

    Longwall panel 580 has recently been retreated in the Zollverein 1/2 seam at a depth of approximately 1000m at Auguste Victoria mine with rectangular rockbolted roadways used for both the maingate and

    Jan 1, 2002

  • SME-ICGCM
    Pressure Measurements in the Gob (27227c3c-951c-4108-ba5c-3b6e67d232fb)

    By H. Maleki

    Gob pressure measurements were made in a Western U. S. coal mine as part of a long-term program to evaluate cave progress and to determine the influence of geological discontinuities on caving conditi

    Jan 1, 1984

  • SME-ICGCM
    A Critical Study of Strata Behaviour During Extraction of Pillars in a Thick Coal Seam

    By S. Jayanthu

    This paper presents analysis of strata behaviour with special reference to convergence and stress variation during an experimental trial of extraction of pillars with cable bolts as major support syst

    Jan 1, 1998

  • SME-ICGCM
    Crosshole Seismics: Applications In Mining

    By Richard E. Thill

    Two Cross-borehole systems were developed by the Bureau of Mines, one operating at a central frequency of 20 kHz for close-in spacing between boreholes (2-20m) and another operating at a dominant freq

    Jan 1, 1989