Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    New developments with the coal mine roof rating (7c278b2d-cc1e-4949-9bd2-643d1af010e5)

    By Chris Mark

    The Coal Mine Root Rating (CMRR) was first presented at this Conference nine years ago. Since Its Introduction, the CMRR has been incorporated into many aspects of mine planning. including longwall pi

    Jan 1, 2002

  • SME-ICGCM
    A Study Of Floor Heave In The Mines Of The Southern Coalfield Of New South Wales By Two Dimensional Finite Element Modelling

    By A. K. Bhattacharyya

    The excessive displacement of the seam floor in headings (i.e. roadways) called 'floor-heave' is often experienced in the underground mines of the Southern Coalfield of New South Wales. Apar

    Jan 1, 1992

  • SME-ICGCM
    Numerical and Physical Modeling as Planning Tools for Rockbolted Roadways

    By Peter Griesenbrock

    In German underground coal mining mostly arch and some rectangular roadways are used in the development work. Due to its positive results from numerical and physical modeling techniques as well as goo

    Jan 1, 2002

  • SME-ICGCM
    Study of the Behavior for Backfilling Material in Room-and-Pillar Coal Mining

    By Joao Felipe Costa, Jair C. Koppe, Andre Zingano, Cleber Gomes

    "Run-of-mine Brazilian coal has high ash content and low calorific power. Therefore, the coal must be washed to achieve the power plant specifications for burning coal. A large amount of waste results

    Jan 1, 2010

  • SME-ICGCM
    Flexibolt Flexible Roof Bolts: A New Concept For Strata Control

    A high strength steel strand bolt has been developed by Barrett, Fuller & Partners as a replacement for conventional rigid bars for primary roof support in coal mines. It is based on a 23mm diameter m

    Jan 1, 1993

  • SME-ICGCM
    Selection of Pumpable Cribs for Longwall Gate and Bleeder Entries

    By Alan A. Campoli

    "Pumpable crib support for longwall gates and ventilation bleeder entries is becoming more prevalent in United States coal mines (Figure 1). The pumpable crib selection and spacing design has been gre

    Jan 1, 2015

  • SME-ICGCM
    Evaluation Of Mobile Roof Support Technologies

    By Hamid Maleki

    This study presents a historic overview of the role of mobile roof support (MRS) technologies in improving stability and worker safety and presents the results of recent field evaluations of the MRS l

    Jan 1, 2001

  • SME-ICGCM
    The Mechanical Property Of Coal Containing Gas (d5aeba01-a0db-4f86-a21e-adbcc6290eab)

    By Yao Yuping

    The strength and deformation of more than two hundred coal samples have been tested in the condition of triaxial compression. The regression equation showing the relationship between coal strength and

    Jan 1, 1992

  • SME-ICGCM
    Evaluation of the Point Load Strength for Soft Rock Classification

    By B. (Mamas) Das

    A project to evaluate the suitability of point Load strength tests for testing and classifying coal measure rocks for coal mining application was initiated by Canada Centre for Mineral and Energy Tech

    Jan 1, 1984

  • SME-ICGCM
    Development Of A Slope Stability Program For Improved Quarry Design

    By John Bullock

    Limestone and dolomite quarries were mapped to determine specific failure mechanisms for the various geologic and structural conditions. Algorithms for analyzing these mechanisms were incorporated int

    Jan 1, 1993

  • SME-ICGCM
    In-Situ Pillar Strength Determination for Two-Entry Longwall Gates

    By H. N. Maleki

    Extensive measurements and underground observations in three Western U. S. coal mines are integrated in this paper to determine in-situ pillar load-deformation characteristics for narrow (30 it wide,

    Jan 1, 1988

  • SME-ICGCM
    Roof Bolting for Long-Term Entries in Underground Coal Mines

    By Peter Zhang

    As simpler and easier reserves are exploited to depletion, underground coal mining continues in more complex geologic settings and conditions. Roof bolting for long-term entry stability is always a ch

    Jan 1, 2011

  • SME-ICGCM
    Development Of A Statistical Technique For Assessing Sandstone Escarpment Stability

    By Hamid Maleki

    During the last decade, a significant amount of research has been conducted by Energy West Mining Company, government agencies, academia, and consulting companies to develop predictive tools for asses

    Jan 1, 2000

  • SME-ICGCM
    Monitoring For The Evaluation Of The Stability Of Underground Openings

    By P. K. Kaiser

    The purpose of deformation monitoring for the evaluation of the stability of underground openings is reviewed briefly and some results from laboratory tests of small tunnels are presented. The ground

    Jan 1, 1981

  • SME-ICGCM
    Application Of Seismic Tomography For Assessing Yield Pillar Stress Conditions

    By Michael J. Friedel

    The fundamental problems associated with ground control reflect the inability of mining personnel to "see" the development of anomalous conditions. Toward this end, the U. S. Bureau of Mines is invest

    Jan 1, 1993

  • SME-ICGCM
    Evaluation of Anchorage Integrity for Grouted Bolts in Weak Strata

    By W. C. Smith

    Over the past several years, the Bureau of Mines has conducted studies on the performance of fully grouted resin bolts In underground mines. The effectiveness of resin-grouted bolts in maintaining a c

    Jan 1, 1987

  • SME-ICGCM
    Entry Design For Optimum Stability In A Multi-Seam Environment

    By Mohummad Akram

    Statistical analysis of multi-seam mining case studies demonstrated that geologic structure and lithological type and sequencing were predominant factors in entry failures. Finite element analysis was

    Jan 1, 1993

  • SME-ICGCM
    A Method For Establishing Site Specific Coal Pillar Design Guidelines

    By Winton J. Gale

    Coal mine pillar design formulae available to mine planners are typically based on relationships determined for specific site conditions. Application of these methods is difficult when other factors,

    Jan 1, 1992

  • SME-ICGCM
    Determination of Effective Column Lengths for Resin-Grouted Roof Bolts

    By W. A. Cincilla

    The use of resin-grouted rock anchors continues to gain popularity in underground wall mines in the United States. It is estimated that during 1985, more than 30% and as many as 35% of all roof bolts

    Jan 1, 1986

  • SME-ICGCM
    A Study On The High-Water Solidifying Materials For Gob-Along Roadside Instead Of Coal Pillars

    By Yunxin Qiu

    A new technology has been introduced - the use of the High-Water Solidifying Material for providing pumped roadside supports to maintain a roadway for re-use in longwall retreating. As a gob edge supp

    Jan 1, 1992