Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Beyond Coalbrook: Critical Review of Coal Strata Control Developments in South Africa

    By J. Nielen van der Merwe

    Rock engineering research and technology development in South Africa only received serious attention in reaction to the Coalbrook disaster in 1960. At the time, a number of gaps in knowledge of rock r

    Jan 1, 2006

  • SME-ICGCM
    Integration Of CAD-Based Mine Planning And Subsidence Engineering Systems

    By Andrew P. Jarosz

    The present computerized mine planning systems use CAD-like and Data Base Management System (DBMS) environments for the handling of numerical, textural, and graphical data. These two environments are

    Jan 1, 1995

  • SME-ICGCM
    Pillar Reinforcement or Rib Support?

    By André C. Zingano

    The coal pillars in room-and-pillar mining method are subjected to vertical stress due to overburden rock mass and horizontal stress relieve due to entries excavation around them. Some coal mining com

    Jan 1, 2006

  • SME-ICGCM
    Numerical Modelling Based Investigation of Coal Pillar Stability for Room and Pillar Development at 900 m Depth of Cover

    By Ashok Kumar, Rajendra Singh, Petr Waclawik

    High-grade coal is locked in the shaft protective pillars at 900 m below surface in the Czech part of Upper Silesian Coal Basin. To optimise recovery of coal from the larger size shaft protective pill

    Jan 1, 2018

  • SME-ICGCM
    Rock Slope Stability Comparison Between Deterministic and Probabilistic Block Theory Analyses for An Open Pit Mine

    By Pinnaduwa H. S. W. Kulatilake

    A new formulation is given to conduct a probabilistic block theory analysis. A new computer code (BTAC) has been developed to perform both deterministic and probabilistic block theory analyses. The va

    Jan 1, 2014

  • SME-ICGCM
    An Improved Technique of In-Situ Measurement Of Fracture Zones Surrounding Gateroads

    By B. G. D. Smart

    An understanding of the nature of yield zones surrounding coal mine excavations is fundamental to the design of mine support systems. Various methods have been designed for investigation of undergrou

    Jan 1, 1984

  • SME-ICGCM
    Coal Mine Ground Control in Western Europe; Past, Present and Future

    By D. N. Bigby

    This paper concentrates on ground control innovation in Europe since the first Morgantown conference, mainly from a UK perspective. In particular, it describes the rock engineering and ground control

    Jan 1, 2006

  • SME-ICGCM
    Experimental and Numerical Study of Double Shearing of Bolt under Confinement

    By Naj Aziz

    The shear behaviour of reinforced rock joints is investigated for the bolt-grout-rock interaction and for failure mechanism. The effectiveness of the bolt application under lateral and axial loading c

    Jan 1, 2007

  • SME-ICGCM
    Failure mechanisms in ultra-close seam mining

    By Yingxin Zhou

    Virtually every coal seam in Appalachia will at some time be subject to multi-seam interaction (Wu et al, 1987). Many such problems result from seams which lie in close proximity or have split and lie

    Jan 1, 1989

  • SME-ICGCM
    Design and Performance of a Longwall Coal Mine Water-Barrier Pillar

    By Francis Kendorski

    The Skyline #3 Mine of Canyon Fuel Company in Utah was planning longwall mine development adjacent to and downdip of older mine workings known to be flooded. Barrier pillar geometries and widths were

    Jan 1, 2007

  • SME-ICGCM
    Ground Movements Associated With Pillar Extraction Coal Mining In Northern West Virginia (38f818ad-9d3b-4ecb-b624-667cef121309)

    By Robert W. Bruhn

    An investigation was male of ground response to pillar retreat mining in a 1.7 meter thick seam at 108 meter depth at a site in northern West Virginia. This paper describes mining-related stress chang

    Jan 1, 1984

  • SME-ICGCM
    Changes In The Seismic Properties Of The Cover Produced By Longwall Mining

    By Guoqi He

    Common offset seismic data collected over two active longwall panels at different stages of mining reveal that significant arrival time delays are produced in reflections from different levels within

    Jan 1, 1989

  • SME-ICGCM
    Time-Dependent Behavior Of Rocks: Laboratory Tests On Hollow Cylinder

    By Gilles Rousset

    This paper presents laboratory experiments conducted on hollow cylinders samples. The advantage of such a geometry is to approach in situ conditions around cylindrical openings (lined galleries, boreh

    Jan 1, 1989

  • SME-ICGCM
    A Casting Method For Artificial Rock Specimens

    By Da Zhao Gu

    An important problem in rock engineering is to control the properties of artificial rock. A compaction technique for casting artificial rock specimens with controlled properties is described, i.e. usi

    Jan 1, 1992

  • SME-ICGCM
    Surface Fracture Development From Mine Subsidence In Eastern Kentucky

    By Clyde DeRossett

    Surface fractures, sometimes of significant size, are observed in eastern Kentucky over high extraction areas. Field observations were correlated with mine maps and a regional subsidence prediction co

    Jan 1, 1993

  • SME-ICGCM
    Comparative Studies In The Mechanics Of Grouted Roof Bolts

    By Stephen P. Signer

    To improve the understanding of the support interaction mechanics between grouted bolts and coal mine roofs and to help lay the foundations for improved design and evaluation techniques, the 0.8. Bure

    Jan 1, 1988

  • SME-ICGCM
    Twenty-Four Conferences; More Than One-Hundred and Seventy Papers; Understanding Roof Bolt Selection and Design Still Remains Priceless (2784433d-38ec-4606-8972-993e284de8c3)

    By Stephen C. Tadolini

    The International Ground Control Conference in Mining has always provided an open forum for the publication, presentation, discussion, and often heated debate on roof bolting systems mostly with atten

    Jan 1, 2006

  • SME-ICGCM
    A Study On Stress Distribution And Reasonable Size Of Coal Pillar In A Coal Face

    By H. C. Li

    Mechanical models are established in accordance with the degree of mining on both sides of the coal pillar, and formulae were derived which calculated the superposition stress distribution and the wid

    Jan 1, 1992

  • SME-ICGCM
    A Comparison of the Overburden Loading in ARMPS and LaModel

    By Ihsan Berk Tulu, Keith A. Heasley, Chris Mark

    "The Analysis of Retreat l\.fining Pillar Stability (ARJ\1PS) and the Lal\.fodel programs have been used successfully in the U.S. for designing safe pillar recovery operations for many years. However,

    Jan 1, 2010

  • SME-ICGCM
    Computer Modeling Of Rock Mass Geomechanic State In Longwall Design

    By V. D. Jalevsky

    A new methodology of an experimental-analytical approach has been developed. It is used in building an information geomechanic monitoring system for the modeling of geomechanic processes during coal s

    Jan 1, 1996