Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    A Contracting Strategy for Managing Risk on Subsurface Projects Delivered Using Design-Build

    By David Corkum, David Hatem

    Subsurface construction projects are risky ventures and the decision to deliver a project using the Design-Build model does not eliminate those risks. Differing site conditions, inadequate design, and

    Jan 1, 2003

  • SME
    A Dynamic-Programming-Based Algorithm For Optimal Production Planning In Open Pit Mines

    By D. D. Lei, H. Sevim

    In a recently developed, long-term open pit production planning model, the optimal plan is found by exhaustively searching through nested pits of maximum metal contents. A more efficient, dynamic prog

    Jan 1, 1995

  • SME
    Significance of natural ground-water recharge in site selection for mill tailings disposal

    By D. B. Stephens

    Assessing the occurrence of natural ground-water recharge at mine and mill waste disposal sites may be crucial to addressing regulatory agency concerns regarding the potential impact of waste seepage

    Jan 1, 1987

  • SME
    Short-Term Mine Production Scheduling For Industrial Minerals Using Multi-Objective Simulated Annealing

    By M. Kumral

    The in-situ mineral characteristics of a deposit are simulated by sequential co-simulation and averaging the simulated characteristics within specified block volumes creates a three-dimensional block

    Jan 1, 2002

  • SME
    Bench Scale Flotation of Sedimentary Phosphate Rock with Hydroxamic Acid Collectors

    By M. Li, J. D. Miller

    It has been discovered that water insoluble alcoholic solutions of alkyl hydroxamic acids serve as selective collectors for the flotation of phosphate mineral resources (Miller et al., 2000). The effe

    Jan 1, 2002

  • SME
    Carrying capacity in a pilot flotation column

    By M. T. Ityokurnbul, M. P. Trubelja

    Concentrate flow rates were measured for the flotation of -100-mesh Lower Kittaning coal in a computer-controlled 0.076 x 3.5-m pilot flotation column. The variables studied were recovery zone height,

    Jan 1, 1999

  • SME
    The IMHOFLOT G-Cell– An Advanced Pneumatic Flotation Technology For The Recovery of Coal Slurry From Impoundments

    By R. M. Imhof, M. J. G. Battersby, J. V. Brown

    There is a plethora of former industrial sites where coal mining operations have left large slurry impoundments. These contain raw washed fines, which have previously been too expensive to process to

    Jan 1, 2003

  • SME
    The Excavation Of The Roosevelt Island Valve Chamber New York City

    By Edward M. Dowey

    This paper presents the excavation of the Roosevelt Island Valve Chamber, the final of three chambers in Stage One of New York City's Third Water Tunnel. The valve chamber and passageways 13 3

    Jan 1, 1987

  • SME
    Evaluation of Ion Exchange Resins for the Extraction ofGold from Cyanide Leach Solutions

    By Patricio A. Riveros

    Various types of commercial ion exchange resins were evaluated with respect to their ability to extract gold from cyanide leach solutions. Large differences were found among the various resins in term

    Jan 1, 1990

  • SME
    A Primer For Engineering And Technical Professionals Regarding Reclamation And Environmental Surety Bonds

    By W. T. Gorton

    Bonds are required by state and federal law to address reclamation when the permittee defaults. Under various principles of law, a bonding company may propose to perform the obligations of the permit

    Jan 1, 2003

  • SME
    A Systems Approach For Worker Needs Analysis In Training Program Development (ABSTRACT PAGE)

    By C. J. Bise

    Safety training requirements differ from mine to mine due to changes in the demographic characteristics of the workers or changes in job and organizational characteristics. Accordingly, a microcompute

    Jan 1, 1995

  • SME
    An Erector Transporter For The Installation And Removal Of Specialized Mining Equipment Underground

    By J. H. LaVerne Palmer, W. (Bill) C. Cox, Lorant B. Geller

    An erector transporter (ET) has been designed and built to lift, carry and erect heavy machinery components, in particular the components of a 7.6 m diameter tunnel boring machine (TBM), within the ac

    Jan 1, 1985

  • SME
    Borehole Radar Determines Solid Coal And Mined-Out Areas For A Construction Site

    By G. G. Marino, Z. R. Widup

    Marino Engineering Associates, Inc. (MEA) was asked to determine the effects of mining beneath a proposed roadway structure. In order to determine the subsidence potential and the magnitude of the min

    Jan 1, 2004

  • SME
    Wenmec/Outokumpu Technology Update Of Current Developments For Anode Slime Precious Metals Treatment

    By Olli Järvinen

    The precious metal refinery process is divided into the five process stages: 1 .copper/nickel leaching in autoclave 2. selenium roasting furnace 3. doré metal smelting furnace 4. silver electrolys

    Jan 1, 1995

  • SME
    Strategies For The Return Of Heavy Mineral Sands Mines To Productive Agricultural Uses

    Significant economic deposits (> 4,000 ha) of heavy mineral sands (ilmenite, rutile and zircon) were discovered in the Atlantic Coastal Plain of Virginia and North Carolina in 1989. The majority of th

    Jan 1, 2003

  • SME
    Adsorption And Separation Of Arsenic From Process Water Using Ls

    By A. M. Raichur, K. Keltner, M. Misra

    The removal of oxyanions of arsenic present in mine process water and drinking water to a regulatory level (i.e. below 50 ppb) is a challenging problem. Conventional water treatment methods presently

    Jan 1, 1997

  • SME
    Blind Shaft Construction New Equipment Update

    By James E. Friant

    The technology applied to shaft sinking has lagged far behind other construction activities. While surface oriented construction and mining have made great strides with new processes and equipment, th

    Jan 1, 1979

  • SME
    Design And Operation On Sintering Plants Incorporating Cooling Of The Sinter On The Strand ? Introduction

    By J. Astier

    The idea of using only one strand for both sintering and cooling of the sinter is not new. In 1952, in the U.S.A. a sintering plant was built at Benson Mine (Star Lake, N.Y.), including : - 68 m2 o

    Jan 1, 1974

  • SME
    Pilot Testing of a Permeable Reactive Barrier (PRB) to Remediate Sulfate, Metals, and Low pH in Groundwater

    By J. F. Strunk Jr., K. M. Maestas, Y. Chai, R. Legrand, R. L. Henry

    "Groundwater with elevated sulfate and metals was treated using a sulfate-reducing pilot PRB consisting of a series of six 55-gallon drums filled with ZVI (Fe0), wood chips, brewer’s grain, limestone,

    Jan 1, 2016

  • SME
    Metal Demand: Secular Change and Long-Run Prospects

    By Roderick G. Eggert, John E. Tilton

    During much of the 1970s and 1980s, world metal consumption grew more slowly than during the 19505 and 1960s. The slowdown contributed to surplus capacity and low real prices because actual consumptio