Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
What Can Be Expected From Coal ResearchBy T. Reed Scollon
Before we can attempt to answer the question of what can be expected from coal research, let us examine why research is done in other fields and what others expect for the money they spend on research
Jan 1, 1959
-
Commercialization of bioleaching for base-metal extractionBy A. Pinches, R. Winby, P. J. van Staden, M. K. Rhodes, P. C. Miller
This paper is a progress report on the commercialization of using bioleaching for base-metal concentrates. The paper focuses on bioleach processes for recovering copper from chalcopyrite and nickel/co
Jan 1, 2000
-
Continuous Gaseous Reduction Process For Metal RecoveryBy C. M. Sliepcevich
This paper is a brief status summary of investigations by the authors over the past decade to develop a continuous process for recovering' high purity metal powder from pregnant solutions by gase
Jan 1, 1975
-
Techniques for Optimization of Mineral Processing FlowsheetsBy Jon C. Yingling
Techniques for optimization of mineral processing flowsheets are reviewed. Though not yet widely used in the minerals industry, approaches for chemical process optimization based on successive quadrat
Jan 1, 1990
-
An Empirical Constitutive Relationship for Rock MassBy Z. T. Bieniawski, Nicholson G. A.
This paper describes an empirical constitutive model for underground excavations in rock which equates the deformation modulus to the ratio of the principal stress difference to the major principal st
Jan 1, 1986
-
Design guidelines for improved water spray systemsBy S. K. Mukherjee, M. M. Singh, N. I. Jayaramn
In underground mining operations, ventilation and water sprays are the common methods of controlling dust. In recent years, there has been a proliferation of technical literature dealing with water sp
Jan 1, 1987
-
Preplanning For An Open Pit Copper MineBy Steven J. Kirk
In the past decade, many hardrock surface miners have revegetated dumps and tailings ponds to allow those waste disposal areas to blend more easily with the surrounding landscapes. Efforts have also b
Jan 1, 1980
-
Accurate Psychrometry For U.S. Mine Ventilation EngineeringBy James Warren Andrews
The values of saturated water vapor pressure from steam tables have been found to be inaccurate for mine ventilation usage because the effect of air on the saturated water vapor was disregarded. Prese
Jan 1, 1989
-
Basic Tools for Deformation Measurements in MinesBy Charles J. Hass
INTRODUCTION Deformation measurements are some of the simplest and most useful measurements that can be made by the mining/rock mechanics engineer in assessing the sta¬bility of openings in rock. A
Jan 1, 1982
-
Coal utilization cost model for fuel procurementBy S. S. Nadgauda, A. J. Hathaway
Typically, as long as the coal quality is within the specified range, electric utilities have used delivered cost of fuel per million Btu as the primary criteria for qualified coals when making coal-p
Jan 1, 1990
-
The Computer Programs For Mine Ventilation AnalysisBy Janusz Szywacz, Bozena Bojko, Stanislaw Wasilewski
Two groups of computer programs are described in the paper. First one is the OWEN system containing software modules designed for air flow distribution analysis and prediction within the whole ventila
Jan 1, 1989
-
A mill power equation for SAG millsBy L. G. Austin
Development of an equation for tumbling charge and balls plus comparison to plant data suggests that the net mill power for cylindrical semiautogenous mills can be calculated from
Jan 1, 1991
-
A Continuous Monitor For Diesel Particulate MatterBy Charles D. Litton
This report describes a smoke particle detector which utilizes a novel three electrode configuration and 5.0 [] source of Americium 241. The detector operates on the principle of diffusional charging
Jan 1, 1989
-
Comminution Techniques for the Recycling of WastesBy G. Schubert, H. Hoberg
A large number of diverse size reduction machines is currently available for the comminution of waste materials. Equipment selection is determined by the nature of the material to be treated and by it
Jan 1, 1998
-
Electrical Control Apparatus For Mill Grinding CircuitsBy Frank Littlewood
Research over a period of ten years resulted in the development of an efficient automatic ore feed regulator for mill grinding circuits. The facilities that a large mining company gave the inventor ma
Jan 1, 1970
-
A Probabilistic Method For Mine Heat PredictionBy A. D. S. Gillies
The provision of a suitable working environment in deep level mines requires the accurate prediction of the ventilation heat load. Mathematical models for predicting strata heat load have been under d
Jan 1, 1987
-
A Design Approach For Coal Mine TunnelsBy W. A. Cincilla, Z. T. Bieniawski, E. Unal
Although coal mine tunnels such as the main haulageways or roadways are the lifelines of coal mines, little attention has been paid to them in terms of pre-construction planning and design. This pa
Jan 1, 1981
-
Multi-Tool Miner For All Rock ConditionsBy W. J. Kogelmann
Roadheaders, also called Boom Miners or Boom-type Tunneling Machines have been in North America since 1968, when first introduced by Willy Kogelmann, the founder of Alpine Equipment Corp. (?Alpine?).
Jan 1, 2008
-
Extensions Of, And Algorithms For, Plurigaussian SimulationBy E. Pardo-Igúzquiza
Most mining applications of geostatistical simulation are to the simulation of quantitative variables, such as grade. In many instances the occurrence of quantitative variables and the values they tak
Jan 1, 2002
-
Visualising QTz Curves for the Lognormal DistributionBy Margaret Armstrong, Arne Berckmans
The longterm aim of this research project is to find fast ways of simulating the recoverable reserves of a deposit for input into financial Monte Carlo simulations without having to conditionally simu
Jan 1, 1996