Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Performance Evaluation Of Indicator Kriging In A Gold Deposit (8ef5dd29-2251-4b58-b433-e9bb93fccdcb)

    By Y. C. Kim

    The strongly skewed grade distributions and the need to estimate the local recoverable reserves in a selective mining environment are the two problems that Ordinary Kriging (OK) cannot easily handle.

    Jan 1, 1986

  • SME
    Economic Aspects Of Geomechanics At The Barrick Mercur Gold Mine

    By R. R. Sacrison

    The Barrick Mercur Gold Mine lies in the Oquirrh Mountains of northern Utah. Limestone, sandstone, shale, and chert are the predominant rock types being mined. Recent expansion has encountered rhyolit

    Jan 1, 1990

  • SME
    Molinos De Barras Y Bolas - Introduccion

    By Chester A. Rowland

    La conminución de Ios minerales es, generalmente, una etapa de preparación de la alimentación para las subsiguientes etapas del proceso. La molienda, fase de conminución de productos finos, requier

    Jan 1, 1982

  • SME
    Discovery And Exploration Of The Gosowong Epithermal Quartz-Adularia Vein Deposit, Halmahera, Eastern Indonesia

    The Gosowong epithermal quartz-adularia vein, in the Halmahera magmatic arc, is a new discovery in an area of primary tropical rain forest with no history of gold mining or mineralization. The newly r

    Jan 1, 1997

  • SME
    Field Test Of A Seismic System For Locating Trapped Miners

    If the communication/tracking system of an underground mine is severely damaged in a large mine accident or explosion, a surface based seismic system could be the only available tool for locating any

    Feb 23, 2014

  • SME
    Construction of the SR-99 TBM Recovery Shaft

    By Lance Rasband, Richard Hanke, John Starcevich

    "The world’s largest tunnel boring machine (TBM), at the time of her launch in 2012, the TBM locally referred to as “Bertha,” is incapacitated due to mechanical failure. Bertha’s stoppage places her 2

    Jan 1, 2016

  • SME
    Assessment of environmental impact of digging and loading equipment in surface coal mining - SME Transactions 2013

    By A. Lashgari, V. Kecojevic

    This paper presents research on the environmental impact of digging and loading equipment used in surface coal mining. Environmental impact was assessed through the measurement of equipment exhaust an

    Jan 1, 2013

  • SME
    Integrating Copper Recovery With In Situ Leach Mining

    By A. E. Isaacson

    The U.S. Bureau of Mines is investigating a systems approach to metals recovery from leach liquors produced by in situ leach mining techniques. A successful in situ leaching process requires a thoroug

    Jan 1, 1990

  • SME
    Operational Constraints: Surface Mining In The Central Coal Province

    By Frank Cook

    As in other areas of the country, surface coal mine productivity in the Central Coal Province--primarily Illinois, Indiana, and west Kentucky--has declined steadily since 1969 (figure 1). Productivity

    Jan 1, 1977

  • SME
    Characterization and Scaling of Froth Pump Performance

    By R. J. Visintainer, J. M. Furlan

    "Due to the time-consuming nature of froth testing in a laboratory environment, practical limitations require the development of a method of applying a single set of performance test data (Visintainer

    Jan 1, 2015

  • SME
    Dynamic Estimation Of Unmeasured Variables In An Industrial Grinding Circuit Using A Kalman Filter

    A PDP 11/34 computer has been inter- faced to existing instrumentation in a 400 tph rod-mill/ball-mill grinding circuit and programed with a Kalman filter to estimate several unmeasured variables. A d

    Jan 1, 1983

  • SME
    Future Trends In International Minerals Technology

    By T. V. Falkie

    REMARKS OF DR. THOMAS V. FALKIE, DIRECTOR, BUREAU OF MINES, U.S. DEPARTMENT OF THE INTERIOR, BEFORE THE FALL MEETING OF THE SOCIETY OF MINING ENGINEERS, AIME, ACAPULCO, MEXICO, SEPTEMBER 23, 1974 T

    Jan 1, 1974

  • SME
    Silver Deposits In The Southern Portion Of The Silver Cliff Caldera (Preliminary Results From 15 Years Of Exploration) ? Introduction

    By Dolf W. Fieldman

    Most recently the geologic setting of the mineral deposits in the Silver Cliff district is described by William M. Sharp in ?Geologic Map of the Silver Cliff and Rosita Volcanic Centers, Custer County

    Jan 1, 1980

  • SME
    Construction — You need risk-based cost estimating

    By A. Moergeli, Philip Sander, John J. Reilly

    "Estimating and managing the costs of complex infrastructure projects – in the planning/design and construction phases, for both owners and contractors – has been a challenge for decades. The more com

    Apr 1, 2016

  • SME
    Workability Index For Utah Coal Mines

    By S. P. Singh

    In order to simulate the operation of coal extraction machines, a portable workability instrument has been designed. Initially, the tests were performed with the instrument on modeling material, which

    Jan 1, 1984

  • SME
    Project Organization and Management Challenges of Interdisciplinary Large Scale Projects Using the Example of the Pump Storage Plant Nant De Drance – Nant De Drance, Switzerland

    By J. Herhold, S. Plaum

    "Increasing worldwide energy demands, coupled with desires for cleaner energy, have led to greater research of renewable energies. Strongly weather-dependent energy sources, e.g. solar and wind energy

    Jan 1, 2016

  • SME
    Mineralization And Alteration At The Pima Mine A Complex Porphyry Copper Deposit Pima County, Arizona

    By Marshall D. Himes

    The Pima mine, 39,000 ton per day copper mine, is located 17 miles south of Tucson, Arizona. The mine is in a sequence of Paelozoic and Mesozoic sediments striking east-northeast and dipping southeas

    Jan 1, 1972

  • SME
    Geotechnical Instrumentation Research Leads Into Development Of Improved Mine Designs

    By H. Maleki

    This paper recognizes the 100th year of research accomplishments by the mining industry resulting from close cooperation among mining companies, geotechnical consultants and researchers from the forme

    Jan 1, 2010

  • SME
    Refuse Slurry Thickening And Dewatering

    By Kenneth A. Pietila

    The thickening and dewatering characteristics of refuse slurries are as variable as the coal mining operations and preparation plants that create them. This paper discusses these characteristics based

    Jan 1, 1984

  • SME
    Newmont Gold Company's Mill No 3, Plant Design From An Operator's Viewpoint

    By James J. Komadina

    INTRODUCTION Newmont Gold Company's Rain operations are located in Elko County, Nevada, approximately 9 miles southeast of the Town of Carlin.The property was submitted to Newmont Exploration Li

    Jan 1, 1990