Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Small-Strain Behaviour of Artificially Cemented Sand in Deep Mixing Application

    By Stephen Darmawan, Mahdi M. Disfani, Arul Arulrajah, Alireza Mohammadinia

    Deep mixing using cementitious compounds is an in-situ method of ground improvement for improving the strength, compressibility of loose sand. Artificial light cementation can increase the stiffness o

    Jan 1, 1900

  • DFI
    Development Of Design Charts For Sand Compaction Pile Method Of Improvement For Loose To Medium Dense Sands

    By N. Aarthi, G. R. Dodagoudar

    The improvement of soft clay deposits using stone columns is a well-established ground improvement technique in the western world. This technique has been well documented and has proper design codes f

    Nov 1, 2022

  • DFI
    Performance of Cement Deep Mixing Method in 2011 Tohoku Earthquake

    By Shoji Higashi, Nobuhiro Honda, Takeo Asanuma, Tatsuo Nagatsu, Masaki Kitazume, Sachihiko Tokunaga, Shigeru Kubo, Hidenori Takahashi, Tsuneyasu Onishi, Yoshiyuki Morikawa

    "Various kinds of civil engineering structures and facilities were seriously damaged in the earthquake in Tohoku and Kanto regions of Japan on 11 March 2011 due to the greatness of its magnitude. In c

    Jan 1, 2015

  • DFI
    Deep Excavation By Controlled Rock Blasting Considering Ground Condition And Nearby Structures In Ug Metro Station – A Case Study

    By P. K. Ray, Sudip Kumar Koley, Sainath M. Reddy, Devulapalli L. S Rasagna

    Bangalore Metro Rail Project- phase II is one of the technological challenging project, particularly construction of underground metro rail system. The Bengaluru city is very congested area and connec

    Sep 1, 2022

  • DFI
    Large Diameter Helical Piles for Refinery Expansion

    By Chris Normand, Paul Volpe, Eric Wey, Howard Perko, Burt Ogilvie, Patrick Murray

    "A refinery expansion project for Marathon Petroleum Company in Southern Louisiana required existing medium to large pipe racks to be expanded for additional capacity. Foundation modifications were ne

    Jan 1, 2017

  • DFI
    Nearshore Pile Construction Experience In Burnie, Tasmania

    By Thomas W. Scott, Manh N. Tran

    Marine environments present a range of challenges for pile construction. This paper contains a discussion on the design and construction of marine piles for a recent Toll Shipping wharf upgrade in Bur

    Nov 1, 2022

  • DFI
    Using Rigid Inclusions, Helical Piles And Micropiles To Revitalize 1600 Smallman Street.

    By Melinda J. Hummel, Zachary T. Smith, Nathaniel Witter, Nina F. Carney

    The revitalization of Pittsburgh’s historic Strip District has led to the redevelopment of existing properties and the development of new properties. At one time, the Strip was home to wholesale marke

  • DFI
    Load-Deformation Based Design of Deep Mixing for Supporting MSE Walls at Kitimat LNG, BC

    By Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li

    "Detailed design of an extensive deep mixing (DM) scheme using the Cutter Soil Mixing (CSM) technique was completed for foundation support of mechanically stabilized earth (MSE) walls for Kitimat Liqu

    Jan 1, 2015

  • DFI
    Cockatoo Island Seawall Seepage Barrier – Permeation Grouting, Jet Grouting and a Soil/Cement/Bentonite Mixed Slurry Capping Trench

    By Chris L. Powell, Russell J. Denny.

    "The remotely located Cockatoo Island iron ore mine off the Kimberly coast in Western Australia, which has been in operation since 1951, was recently expanded up to 50m below sea-level using staged co

    Jan 1, 2016

  • DFI
    Dealing with Complexities Associated with the Application of Bored Pile Retaining Walls in Urban Developments

    By Abid Adekunte

    "Engineers and developers have witnessed the growing popularity of deep basement structures as components of urban commercial and residential developments. This is often attributed to inadequate surfa

    Jan 1, 2017

  • DFI
    Collaborative Value Engineering Redesign - DFI 2020

    By Martin Mcdermott, Kevin Tehansky, Robert Ross, Jeffrey Goodwin

    A foundation value engineering redesign is a collaboration between the project owner, original design team, general contractor, foundation contractor and redesign team. Without the acceptance and coll

  • DFI
    USTA Geoseismic and Foundation Design Challenges

    By Athena C. Denivo, Pablo V. Lopez, Sissy Nikolaou, Alfred H. Brand, Ahmad Rahimian, Rudivien G. Josef

    "The United States Tennis Association (USTA) Billie Jean King National Tennis Center (BJKNTC) site is located in the northeastern portion of the Flushing Meadows Corona Park area of Queens, N.Y. The s

    Jan 1, 2015

  • DFI
    Deep Foundations for Top-Down Construction of High-Rise Project

    By Martin B. Hudson, Kenneth S. Hudson, Gwendolyn Arreguin

    A twin high-rise project site in Century City posed several foundation engineering challenges for the design team. One portion of the twin high-rise project site was required to utilize top-down const

    Jan 1, 2019

  • DFI
    Installation Of Three Up To 120M Deep Diaphragm Wall Shafts, With Diameters Between 8M And 35M At Woodsmith Mine In North Yorkshire (England)

    By Gustav Jahner, Michael Baltrusch, Norbert Hoffmann

    Near the port city of Whitby in the north-east of England, Anglo American (AA) is setting up the deepest mine in the UK, which will have a depth of 1,500m. The purpose of the project is to extract and

    Sep 1, 2022

  • DFI
    The Importance Of Tension Softening (Of Concrete) In Modelling Of Tension Piles

    By Qingwei Joshua Ong

    Tension piles, also known as uplift or anchor piles, are necessary to resist uplift forces that might cause structural distress. In excavation projects, most uplift forces are developed because of hyd

    Nov 1, 2022

  • DFI
    Complex Deep Foundation System for Tall Tower in New York City

    By Renzo D. Verastegui, Michael Law, Sitotaw Y. Fantaye, Alfredas Daugiala

    "When completed, 520 Park Avenue will amend the Manhattan skyline and be one of the most prestigious high-rise towers in New York City. The 52-story condominium building is located on a 60 ft by 100 f

    Jan 1, 2017

  • DFI
    Integrity Testing of Drilled Displacement Piles at a Major Campus

    By Mark D. Fuhriman, Parham Khoshkbari, Robert Fosse

    Drilled displacement piles are becoming an increasingly common deep foundation choice for their relatively simple installation methods, applicability to a wide range of subsurface conditions, and vers

    Sep 8, 2021

  • DFI
    Value-Engineering of H-Pile Foundations in Karstic Geology

    By Rachael M. Fischer, Daniel J. Woeste, Terence P. Holman

    "A new 50 MW biomass renewable energy power plant was planned for construction in southwestern Georgia. The original foundation design consisted of very conservatively designed H-pile groups with vert

    Jan 1, 2016

  • DFI
    Design, Installation And Performance Of Earth Retention System To Limit Ground Movements Around Sensitive Structures In Washington, Dc

    By Douglas R. Hardin, Stanley L. Worst, Joanna Mason

    A challenging earth retention project presented itself in Washington, DC in the backyard of the historic House of the Temple (The Scottish Rite of Freemasonry, Supreme Council 33°). Located at 15th St

    Oct 1, 2022

  • DFI
    Lateral Response of Large Diameter Drilled Shafts in Clay

    By Ke Yang, Robert Liang

    "Drilled shaft foundations are widely used for many types of structures, especially for highway bridges, high rise buildings, and costal structures. The lateral design considerations are crucial for t

    Jan 1, 2005