    Innovative Micropile Retrofi t of an Existing Structure

    By Kenneth R. Chadwick, Thomas J. Tuozzolo, Terence P. Holman

    "Micropiles are often installed to retrofit existing foundations that experience distortion and to underpin structures prior to future construction. The Dublin Road Pump Station project is an example

    Jan 1, 2008

  • DFI
    Rehabilitation of an Existing Mechanically Stabilized Earth Wall Using Soil Nails

    By Daniel A. Thome, Robert C. Janke

    "Installation of permanent soil nails through distressed mechanically stabilized earth retaining walls is a cost effective and aesthetically pleasing solution when using the appropriate equipment and

    Jan 1, 2005

  • DFI
    Analysis of Water Leakage in Downstream Dam Toe of Komani Dam

    By Arjan Jovani, Arjan Beqiraj, Përparim Alikaj, Altin Karriqi

    "Koman dam is one of most important high dams in Drin River Cascade. Safety of these dam is very important not only in power production but also in social and environmental aspects connected with vita

    Jan 1, 2016

  • DFI
    Outline and Execution Control System of Dry Jet Mixing (DJM) Method

    By Shigetoyo Yasui, Masahiro Saitou, Nobushige Yasuoka, Keisuke Tsujimoto

    "The Dry Jet Mixing (DJM) Method was developed and has been put to practical use on the initiative of the Public Works Research Institute and Japan Construction Method and Machinery Research Institute

    Jan 1, 2015

  • DFI
    Piles through Soft Clay for a Metro Project

    By Sanjay Gupta, Sorabh Gupta, Ravi Sundaram, Abraham Varghese

    "Geotechnical investigation for the Kochi Metro revealed a critical section of the Viaduct near Ernakulam Junction Railway Station. Four piers, located over a 220 m stretch, were passing through an ar

    Jan 1, 2015

  • DFI
    Comparison of the Pre-Construction and Production QC Test Results for the Sela-22 Elliptical Jet Grouting Project (New Orleans, LA)

    By Filippo Maria Leoni, Alessandro Bertero, Gianluca Pianezze

    "As part of the Southeast Louisiana (SELA) drainage program, designed by the U.S. Army Corps of Engineers (USACE) to reduce flood damages in the City of New Orleans and surrounding parishes through th

    Jan 1, 2016

  • DFI
    Influence of Different Parameters on the Behavior of Laterally Loaded Piles in Sand

    By Musbah A. Hasan, Ahmed M. Nasr, Fauzi Jarushi

    Many transmission towers, high-rise buildings and bridges are supported by piles. These structures may be subjected to large lateral loads. Therefore, experimental investigations on model piles under

    Jan 1, 2017

  • DFI
    Case History: Large Diameter Micropiles for the Highway 53 Relocation Project

    By Nathan W. Iverson, David S. Graham, Paul J. Axtell

    "The Highway 53 relocation project in Virginia, Minnesota, involves construction of a very tall bridge across a currently inactive iron ore mine pit. The inactive pit is partially flooded and serves a

    Jan 1, 2017

  • DFI
    Baum Station – A New Pile Driving and Drilling Navigation System

    By Dzianis Proshchanka, Yoshi Izumi, Koji Mitani, Ayuna Kitaura

    "A new pile driving and drilling navigation system has been developed. It utilizes the commonly used surveying total station, combined with an innovative reticle. Conventional crosshairs have been rep

    Jan 1, 2017

  • DFI
    Cost Effective Excavation Support in Seattle

    By Richard D. Luark, Fernanda S. Madrona

    Deep foundation construction in highly developed urban settings pose unique challenges of working with deep excavations in a relatively confined area while preserving the integrity of nearby structure

    Jan 1, 2019

  • DFI
    Creative Solution For Sydney Data Centre

    By M. Krzaninski, Y. Zou, A. Frost

    The foundation solution for a data centre building in Sydney, Australia comprised two alternatives, the first of which incorporated the use of CFA piles founded in rock at approx. 27m depth to support

    Nov 1, 2022

  • DFI
    Diaphragm Wall Construction, Instrumentation, and Testing for a Hydroelectric Power Facility

    By David Gatto, Nicolas A. Willig-Friedrich, Jeff A. Segar

    "With the increasing demand for electricity, and requirements to generate this power cleanly, more producers are turning towards hydroelectric power. A project in Iowa currently under construction wil

    Jan 1, 2016

  • DFI
    Deep Excavation with Well Point Dewatering in Soft Soil

    By Mihir B. Roy

    "Coal transported by rail for Thermal Power Plant in Haldia, West Bengal, India, was to be received and stored in Coal Complex comprising of Wagon Tippler, Track Hopper, Junction Houses and network of

    Jan 1, 2015

  • DFI
    Use of Vibro-Replacement Stone Columns for Ground Improvement and Support of Mechanically Stabilized Earth (MSE) Wall

    By Pancho J. Garza, Keith H. Dahlen, Chris A. Labye

    "Design for reconstruction of the East Flagstaff traffic interchange project located in Flagstaff, Arizona posed particular challenges. The proposed design included construction of a nearly 50-foot ta

    Jan 1, 2015

  • DFI
    Settlement Evaluation of Large Water Storage Tanks Under Challenging Conditions

    By Ben M. Lewis, Yogesh Prashar

    "The East Bay Municipal Utility District (EBMUD) is a major water utility service providing water to over 1.3 million people in the eastern San Francisco Bay Area. EBMUD manages 28 dams at 5 terminal

    Jan 1, 2016

  • DFI
    Experiences Using A Leader System For Long Cfa(Acip) Piles In Hawaii

    By Damien Enright, Franz-Werner Gerressen

    CFA/ACIP pile is the most used single pass drilling method for deep foundation installations. It is constructed by rotating and driving a Continuous Flight Auger (CFA) into the ground at a controlled

    Oct 1, 2022

  • DFI
    Site Development and Foundation Planning for a Wastewater Treatment Plant Expansion

    By Steven R. Ahlfield, Ali Ghandeharioon

    A wastewater treatment plant commissioned in 1978 is undergoing a major expansion. Planning various phases of the 8-hectare expansion at this site requires an understanding of the site response during

    Jan 1, 2019

  • DFI
    Harry Nice Bridge Geotechnical Instrumentation Case Study

    By Jeffrey Goodwin P. E., Melih Demirkan Ph. D. P. E., Kevin Tehansky P. E.

    Just an hour drive down MD 301 from National Harbor, construction to replace the Governor Harry W. Nice Memorial/Senator Thomas ‘Mac’ Middleton Bridge (HNB) began in spring of 2020. The Maryland Trans

    Oct 1, 2022

  • DFI
    The Innovative CSM - Cutter Soil Mixing System for Constructing Retaining Walls and Cut-off Walls

    By Erwin Stötzer, Renato Fiorotto, Wolfgang G. Brunner, Manfred Schöpf

    "Deep mixing methods can be used economically for the construction of cut-off or excavation support walls where other systems such as traditional soldier beams and lagging walls would yie ld unsatisfa

    Jan 1, 2005

  • DFI
    A Case Study Describing The Use Of A Top Down Construction Sequence For A Three Level Basement Using A Diaphragm Wall And Cfa Foundation Piles

    By Chris Leach, Lucie Spencer

    This case study describes the geotechnical aspects of the basement construction for a multi-storey, residential and hotel complex located in the newly developed Elizabeth Quay precinct in Perth, Weste

    Nov 1, 2022