Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Underpinning A Crane Foundation

    By Donald R. McMahon

    This paper presents a unique case history that documents the use of a braced secant pile wall to underpin a heavily loaded footing inside of a manufacturing plant. Construction of a pit for a new man

    Jan 1, 2006

  • DFI
    Deep Foundations In Hong Kong - Synopsis

    By Martin Pratt

    This paper is an overview of deep foundation engineering in Hong Kong past, present and future. The enormity of the subject compared with the space available makes brevity inevitable. Issues of constr

    Jan 1, 2000

  • DFI
    Steel H-Section Piles Support 2,120-Foot Long Cable Stayed Bridge Verona Island And Prospect, Maine

    By James W. Weaver

    The 2,120-foot long cable stayed Penobscot Narrows Bridge that carries US Route 1 over the Penobscot River between Verona Island and Prospect, Maine is supported on four foundation units, one below ea

    Jan 1, 2011

  • DFI
    A Comparison Of Open Drilled Shafts To Temporarily Cased Drilled Shafts In Clay Soil

    By W. Tom Witherspoon

    Many Engineers are skeptical and cautious about skin friction factors for the portion of drilled piers where temporary casing is used. This has led Texas engineers in many cases to eliminate skin fric

    Jan 1, 2009

  • DFI
    Ground Movements - A Hidden Source Of Loading On Deep Foundations

    By Harry G. Poulos

    Ground movements can arise from a large number of sources and can have a significant effect on nearby piles and deep foundations. The loading of the piles by ground movements is a different mechanism

    Jan 1, 2006

  • DFI
    Pile Load Testing At JFK International Airport - Synopsis

    By J. Moskowitz

    Construction of the new JFK International Airport Light Rail System (LRS) began in 1998 with a pre-construction load test program. This $1.2 billion design-build project consists of approximately 13 k

    Jan 1, 2000

  • DFI
    Impact Of Environmental Regulations On Pile Foundation Design And Construction Using Diesel Hammers

    By R. D. Short

    Environmental regulations for noise and air pollution are directly affecting the type of equipment and construction techniques being utilized for pile driving construction using diesel hammers in Cali

    Jan 1, 1989

  • DFI
    Installation And Performance Of Interlocking Drilled Shaft And Tieback Shoring System - Summary

    By Alec C. Bloem

    A 55' deep excavation encompassing almost a city block in London, Ontario required a lateral earth retention system to provide both temporary excavation support and a permanent groundwater cut-of

    Jan 1, 1991

  • DFI
    Design Of Sheet Piling For The Prague Metro Line C

    By Jan Pru?ka

    This paper describes the sheet pile design for the Line C extension from Ládví station to the North of Prague. The first part of the paper describes the geological conditions and structural configurat

    Jan 1, 2011

  • DFI
    Value Engineering And Field Testing Of Pre-Cast Concrete Piles For The kcICON Project

    By Elizabeth M. Smith

    The kcICON design-build project in Kansas City, Missouri includes widening the existing roadway, improving interchanges and grade separation bridges, and replacing the Missouri River Bridge. The Miss

    Jan 1, 2009

  • DFI
    Experimental Investigation Into The Stress And Strain Development Around A Displacement Pile

    By Jelke Dijkstra

    This paper presents the results of model pile load tests in a photoelastic material. The soil in this test is represented by an assembly of photoelastically sensitive glass particles, which allows for

    Jan 1, 2006

  • DFI
    Earth Pressure Distribution On Diaphragm Wall During Excavation

    By Ting Chinsu

    Diaphragm wall with tie-back cable is widely used for deep excavation, especially in the area with high density of buildings. This paper presents the measured earth pressure distribution on diaphragm

    Jan 1, 1991

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field Work

    By Darrell L. Beddard

    Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai

    Jan 1, 1996

  • DFI
    Wharf Damage Due To Settlement Of Deep Soft Subsoil ? Synopsis

    By Z. Y. Ding

    This paper emphasize two points in piled wharf design which are important than structure calculation. First, during design of piled wharf on soft stratum, the bank slope stability is the first importa

    Jan 1, 1991

  • DFI
    Case Histories Of Geo-Column? Foundations - Synopsis

    By Osamu Taki

    This paper presents the system, the strength of column, the design concept, and the applications with four case histories from the past project as the general aspect of Geo-Column (trade mark of singl

    Jan 1, 2000

  • DFI
    Design And Performance Evaluation Of Bored Piles In Sand

    By Ashutosh S. Dhar

    Cast-in-place piles were examined in this paper from the viewpoints of construction quality, axial capacity, and load-displacement responses. The results of ten 450 mm diameter (18? f) bored piles, in

    Jan 1, 2006

  • DFI
    Elimination Of Heave Forces On Lightly Loaded Piles In Swelling Clay - Summary

    By Basem Sh. Hazzan

    In the last four decades significant effort has been devoted to designing piles in expansive clay soils. Nevertheless, only a scant effort has been devoted to the elimination of heave forces acting on

    Jan 1, 1999

  • DFI
    Unusual Solutions To Difficult Earth Retention And Underpinning Projects ? Summary

    By Larry Rayburn

    Design of cost effective engineered solutions to complex problems requires the team efforts of the owner, the designer and the specialty construction contractor. The basic ingredients of success requi

    Jan 1, 1991

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (1ca07ced-58e8-4100-8369-c2eebb984ebc)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2000

  • DFI
    Supported Excavation Movement Causing Lateral Displacement and Cracks in Drilled Shafts - Lessons Learned from a Case Study in Chicago

    By Eric R. Borys, Amaneh E. Kenarsari, Brett Gitskin

    This case study discusses impacts of excessive Earth Retention System (ERS) lateral movement at a project in city of Chicago. The ERS (cantilevered sheeting) moved inward towards the excavation and ca

    Jan 1, 2018