Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Building Response To Construction ActivitiesBy Marco D. Boscardin
Control and mitigation of building response to construction activities are assuming a greater role in design decisions for underground construction. Alternatives for controlling building response have
Jan 1, 2003
-
Unusual Dolphin Monopile StructureBy C. T. Christensen
The paper gives an outline of the design, installation and performance of a series of mooring and berthing dolphins for a major ferry berth outside the port of Elsinore, Denmark. The Dolphins are larg
Jan 1, 1989
-
Determination Of Pile Damage In Concrete PilesBy Gerald E. H. Verbeek
As the number of driven concrete piles with Embedded Data Collectors increases, it has become possible to compare the widely used Beta Method to assess pile damage (using the change of pile impedance)
Jan 1, 2011
-
Advances in Stress-Wave Nondestructive Testing Methods for Evaluation of Deep FoundationsBy Joseph T. Coe, Siavash Mahvelati, Alireza Kordjazi
This paper introduces recent advances in stress-wave NDT systems for use in assessments of in-service foundation integrity and drilled shaft construction. The primary results of the laboratory experim
Jan 1, 2018
-
A Cut And Cover In Stiff Clay In Eurre-France - SynopsisBy R. Stenne
This paper deals with a complementary soil investigation which being part of the contract helped understand the behavior of a softened clay and adjusted the design of a retaining structure accordingly
Jan 1, 2000
-
Quality Assessment Procedure And Classifications Of Cast-In-Place Shaft Using Low Strain Dynamic TestBy Liqun Liang
Various nondestructive testing (NDT) inspection methods are available to evaluate the structural integrity of cast-in-place shafts. The widely used methods include Cross Hole Sonic Logging Testing and
Jan 1, 2011
-
History Of Foundation Pile Driving Hammers In New York City, 1900 To 2000 - SummaryBy James S. Graham
Foundation pile driving hammers used in New York City in the past 100 years have been drop, steam, compressed air, diesel, and hydraulic. In 1992, the first hydraulic hammer in the New York City area
Jan 1, 2000
-
Present Developments In The Design Of Deep FoundationsBy Rolf Katzenbach
The principle questions related to the design of deep foundations especially in soft soils are the stability and the cost optimised settlement reduction to prevent possible damages and to minimise the
Jan 1, 2006
-
-
Value Engineering of Reinforcement used in Large Diameter Drilled ShaftsBy Shahid Islam, Lucian Bogdan
Deep and large diameter drilled shafts use mostly bundles of Grade 60 (415 MPa) reinforcing bars as longitudinal reinforcement with rebar splices to make it longer. Lower Grade steel requires large nu
Jan 1, 2018
-
Value Engineering – Design Risk and Reward at Major Sport Arena ProjectsBy Peter Faust, Jeremy Zorne, Timothy Siegel, Diane Fiorelli
Professional sport venue construction follows a very simple rule. Once the decision has been made to move the team to a new place, construction shall begin immediately, so that not more than one or tw
Jan 1, 2018
-
Overcoming Grouting Difficulties During Retaining Wall StabilizationBy Jared M. Green
This paper presents the wall stabilization design and implementation for a 541 linear ft masonry and concrete gravity-type retaining wall flanking the west perimeter of a 7.37 acre parcel in Bronx, Ne
Jan 1, 2011
-
The Use Of A Reverse Circulation Diaphragm Walling Technique To Form A Plastic Cut-Off Wall Around Sizewell B Power StationBy H. F. Cowie
Britain's first pressurised water reactor (PWR) Nuclear Power Station is now under construction at Sizewell on the Suffolk coast. A linear cut-off wall was proposed to ensure that the drawdown of
Jan 1, 1989
-
Vertical And Lateral Load Tests On Driven And Cast-In-Place Piles ? SynopsisBy G. Price
The Building Research Establishment installed a base load cell in a driven cast-in-place pile prior to it being tested under vertical load. The monitored base loads were found to be significantly less
Jan 1, 2010
-
Environmental Impact Management Through Foundation System - SynopsisBy Deshmukh A. M.
Existence of human beings and their relationship with the nature is symbiotic. The lack of perspective and negligence of nature disturbs the equilibrium of environment and causes unprecedented disaste
Jan 1, 1996
-
Deep Bored Piling in Soft Soil and High Lateral LoadsBy W. Sondermann
"AbstractThe construction of a distribution centre of minerals for a global mining and resources cooperation demanded the control of deformations and displacement of the stack reclaimer facilities on
Jan 1, 2014
-
Improved Pile Economics: High Design Stresses And Remote Pile TestingBy Jim Frazier
Tradition has often dictated low design load stresses on piles. Such traditions often developed prior to modern static or dynamic pile testing methods and perhaps result from a few limiting situations
Jan 1, 2002
-
Innovative European Technologies To Accelerate Construction Of Embankment Foundations - Part I: GEC, AUGEO & CFABy Ali Porbaha
In today's fast-track construction environment, owners are searching for non-conventional technologies to build their projects faster and safer while maintaining traffic flow during construction.
Jan 1, 2002
-
Lateral Earth Pressure On Lagging In Soldier Pile Wall SystemsBy Howard A. Perko
Soldier pile and lagging is a conventional means of temporary excavation shoring. Timber lagging design has traditionally been based upon the designer's experience or empirical rules. One such me
Jan 1, 2008
-
Designed, Dynamically Load Tested And Installed Pile Foundation In Southwest Florida - A Case HistoryBy Christopher J. Pacitto
This paper presents a case history of an engineered, monitored, and tested program that provided an effective and satisfactory basis for the completion of pile foundations for Twin Dolphins 1 at La Pe
Jan 1, 2002