  • DFI
    Post-Katrina Emergency Interim Flood Protection

    By Fred Fuchs

    "Most deep foundation work is either unseen by the general public or viewed as an inconvenience in their daily lives. Hurricane Katrina changed that perspective for everyone in New Orleans — and many

    Jan 1, 2008

  • DFI
    A Three-Stage Assessment Process To Predict Risk Levels Due To Subsurface Construction

    By Julie Clarke

    In 1939 Dr. Ralph Peck criticized the Civil Engineering community for taking a bifurcated approach to the prediction of building damage due to subsurface geo-technical works. Specifically, he observe

    Jan 1, 2009

  • DFI
    Methodology for Drilling Offshore or Onshore in Hard Rock for Deep Foundations with Pile Top Drill Rigs (PBA)

    By Dinesh Hinduja, Pérez: Miguel

    "Large structures are generally exposed to dynamic and structural loading. They require usually either foundation connected to hard rock through sockets or driven foundations, which encounter boulders

    Jan 1, 2015

  • DFI
    Diaphragm Wall For Deep Basement Provides Efficient Use Of Waterfront Property At Harbor East In Baltimore

    By S. Y. Fantaye

    This paper discusses the design, construction and performance of a 30 inch thick diaphragm wall recently constructed in Baltimore, Maryland at Inner Harbor East. The project site is an established ma

    Jan 1, 2008

  • DFI
    Construction Dewatering Challenges in Urban Environments

    By Rafael A. Rivera

    "Since the dawn of construction, there has been a need for excavations, which sometimes need to occur below the groundwater table. Excavations in themselves are difficult enough, with the myriad of re

    Jan 1, 2017

  • DFI
    Execution Example of the Expanded Dry Jet Mixing (EX-DJM) Method

    By Kiyotaka Ohno, Nobushige Yasuoka, Yosuke Hioki

    "The diameter of improved columns adopted by the original DJM Method had been 1000 mm, however, in order to comply with the social need for construction cost reduction, the Expanded Dry Jet Mixing (EX

    Jan 1, 2015

  • DFI
    Evolving Micropiles: Optimizing Foundations For Seismic Retrofit

    By Rob Jameson

    Micropiles are ideally suited to seismic retrofit applications. Their high tensile and compressive capacity can sustain the large concentrated loads induced during seismic events. Micropiles can be

    Jan 1, 2008

  • DFI
    Large Diameter Shafts - Youghiogheny Reservoir Bridge (bd308ba5-80e5-464e-8005-1856048b892f)

    By Paul J. Lewis

    Estimation of the axial side shear resistance of drilled shaft rock sockets is directly related to the unconfined compressive strength of the bedrock. Commonly, the mean unconfined compressive strengt

    Jan 1, 2013

  • DFI
    Broadway Viaduct Design Phase Load Test Program For Post Grouted Shafts

    By Mike Muchard

    A design phase load test program was performed at the Broadway Viaduct bridge site to evaluate load carrying capacity and constructability of post grouted drilled shafts. The program included construc

    Jan 1, 2009

  • DFI
    Installation And Testing Of 260 Hollow Core Bar Micropiles

    By Jesús E. Gómez

    A total of 260 micropiles were installed as part of a retrofit effort for two existing bridges. The micropiles consisted of hollow core bars installed under limited headroom conditions. Of the total n

    Jan 1, 2007

  • DFI
    Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)

    By I. D. Dayal, Anil Kumar Jain

    "Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat

    Jan 1, 2016

  • DFI
    Comprehensive QA/QC Integrity Testing Using Thermal Integrity Profiler

    By Brad W. Taylor

    "During the past several months, I have introduced to civil and structural engineers an innovative solution for the integrity testing of concrete using the Thermal Integrity Profiler (TIP) Wire Cable

    Jan 1, 2017

  • DFI
    Performance Of Cast-In-Place Piles Installed With A Fixed Mast Drilling Platform In Claystone ? Glenrock WY

    By Brent Wilkins

    The project team was tasked with the design and installation of a deep foundation system to support an expansion to a power generating station in Glenrock WY. Cast-in-place piles installed by a fixed

    Jan 1, 2009

  • DFI
    Unique Anchor Pile SOE System

    By Andrew Stauble

    This project included the replacement of the Long Island Railroad (LIRR) Atlantic 6 Bridge in New York City, which services rail traffic and spans the Van Wyck Expressway and frontage roads. The bridg

    Aug 1, 2023

  • DFI
    Model Specification Helical Anchor Foundations Tension Applications

    "This model specification includes sample text shown in normal font with commentary in italics. The commentary is intended to highlight project-specific items the specification writer should consider

    Jan 1, 2016

  • DFI
    Underpinning Using Long Minipiles In Compressible Soils

    By Mohamad H. Hussein

    A minipile system was employed in underpinning a historical structure in Florida. The existing structure is founded on shallow foundations. Subsurface conditions at the project site consist of deep or

    Jan 1, 1993

  • DFI
    Design And Field Comparison Of Ground Improvement And Bored Piles For Large Diameter Steel Water Tanks

    By Vijaya Bhushan Rao, Ali Semercioglu, Jason Redgers

    Large diameter steel water tanks with high storage capacities impart heavy loads deep into the ground, generally requiring deep foundations to adequately support them. The use of ground improvement as

    Oct 1, 2022

  • DFI
    Integration Of Real Time Pile Design By Means Of Building Information Modeling

    By Prof. Dr. -Ing. habil. Sascha Henke, Johannes Beck

    The growth of Building Information Modeling (BIM) during recent years opens possibilities for integrating new digitally driven design approaches. While parametric design and algorithmic design slowly

    May 1, 2022

  • DFI
    Development Of Vertical-Horizontal Yield Envelopes Of Pile Group Supported Bridges Subjected To Scour

    By Aditi Sharma, Sumanta Haldar

    Scouring of soil is the major concern forthe various hydraulic structures built in the flowing rivers since scouring impacts the bearing capacity of foundations. Hence, consideration of scouring in th

    Sep 1, 2022

  • DFI
    Installation Checklist For Driving Mega Piles

    By Douglas L. Scaggs

    Over the past several years, pile foundations have grown to meet the demands of larger and heavier structures. As the foundations have grown, so has the need for larger and more robust piles to carry