Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The McArthur River Project

    By Kareise G. J, Leung K

    The McArthur River (HYC) deposit, located in the Northern Territory of Australia, was discovered by Mt Isa Mines Limited geologists in 1955. It is one of the largest sedimentary stratiform zinc-lead

    Jan 1, 1993

  • AUSIMM
    Technical Challenges Faced With Extracting a Transverse Pillar at Mount Isa Mines, Xstrata Copper

    By A Winchester, D Grant

    The massive 1100 Orebody in Mount IsaÆs X41 Copper Mine has been extracted over the last 40 years form north to south utilising sublevel open stoping methods.De velopment has continually stepped ahead

    Jan 1, 2005

  • AUSIMM
    Iron RoadÆs Prediction of Magnetite Concentrate Production from the Central Eyre Iron Project

    By P J. Marsh, P J. Bartsch, N J. Semler

    Iron Road Limited is currently studying the feasibility of producing 20 Mt/a of high-grade (67 per cent Fe) magnetite concentrate from a 2.6 Bt resource (JORC) located at Warramboo on the central Eyre

    Aug 12, 2013

  • AUSIMM
    ROES« û A Low-Cost, Remotely Operated Mining Method

    By A Castleden, G Cavanough, M Kochanek, J Cunningham

    ROES« is a proposed new mining system for underground hard rock mines. Ore is accessed from within a shaft, which is located close to or within the stope, and pitched either vertical or within approxi

    Jan 1, 2008

  • AUSIMM
    Modification and adsorption of triazine collectors onto pyrite surfaces

    By X Zhang, Y Zhu, P E. Ngoepe, P P. Mkhonto, W Xiong, L Han, L Lu

    The triazine molecules have not been given much attention and they are potential collectors that may positively impact the mineral processing industry. The adsorption of triazine as collectors such as

    Aug 24, 2022

  • AUSIMM
    Application of Technology for Final Wall Damage Control at Cerro Vanguardia, Argentina

    By W R. Adamson

    Cerro Vanguardia SA (CVSA), property of AngloGold Ashanti, mines gold and silver from a system of vetiforme orebodies located in the south of the Argentine Patagonia, in the Province of Santa Cruz.Sur

    Nov 8, 2011

  • AUSIMM
    Quantitative airblast risk assessments for block and sublevel caves

    By C Vejrazka1

    The occurrence of airblasts is one of the principal mining hazards in caving operations between the time of cave establishment and breakthrough of the cave to surface. As such, it needs to be managed

    Oct 12, 2022

  • AUSIMM
    Latest Experience with Dust Suppression in Tunnelling

    By Girnau G

    The necessity of effective dust suppression measures during excavation work is just as uncontroversial in tunnelling as it is in mining. In many respects, in fact, the applied technology is compara

    Jan 1, 1987

  • AUSIMM
    A novel approach to evaluating gravity pre-concentration amenability utilising the hydrodynamics of dense liquids in inclined channels

    By J Zhou, T D. McGrath, K P. Galvin, C P. Lowes, J J. Eksteen

    Pre-concentration of low grade ores can improve the economic and environmental sustainability of an operation significantly, with opportunities for implementation ranging from run-of-mine to mill disc

    Nov 10, 2020

  • AUSIMM
    The Refurbishment of the Terrace and Mt Victoria Tunnels, Wellington, New Zealand

    By T J. McGavin

    This paper examines the fire life systems implemented in two existing tunnels and discusses whether the standards used were appropriate. It focuses on the Terrace Tunnel as this upgrade and refurbishm

    Sep 17, 2014

  • AUSIMM
    Consolidation and shear strength testing and stability analysis of coal mine spoil degraded to mud

    By L Bergin, D J. Williams, S Islam, T A. Vangsness

    The flooding of open strip coal mines in the Bowen Basin and Hunter Valley Coalfields of Eastern Australia has the potential to soften the spoil and floor materials to produce “mud”. This mud can act

    Jul 23, 2018

  • AUSIMM
    Continuing Education for the Australian Mining Industry Workforce

    By T O Aspinall

    The Australian mineral industry involves a diverse range of expertise and skills. Within that, the mining industry, representing mine planning, mine management and equipment operation, has capital i

    Jan 1, 1994

  • AUSIMM
    Characterisation of Coal Micro-Structure Using Scanning Electron Microscopy

    By Beamish B. B

    In this study, a systematic examination of the scale and variety of micro-structures in coal using Scanning Electron Microscopy (SEM) has been carried out, using coal samples of differing stages of

    Jan 1, 1991

  • AUSIMM
    Best practice sampling QA/QC for gold and base metal mining – including how to assess the applicability of underground reverse circulation grade control sampling

    By J T. Carswell

    Best practice mine sampling should provide a detailed quantification of all potential sources of error at each stage of sampling, sample preparation and assaying.Quality assurance (QA) should include

    Sep 20, 2017

  • AUSIMM
    The Solvent Extraction of Uranium from Slurries

    A great range of contacting equipment is used in solvent extraction. However, a tower filled with a regular packing offers many advantages in the direct extraction from slurries. A study was made of

    Jan 1, 1969

  • AUSIMM
    Process optimization of Mount Morgan gold tailing retreatment plant

    By Hampshire MJ

    The tailing retreatment project rated at 10 000 t/day commenced operations in October 1982. The operation consists of dredging, feed preparation, cyanide leaching and carbon-in-pulp (CIP) gold reco

    Jan 1, 1986

  • AUSIMM
    Occupational Safety - A Government Overview

    By J G Bastias

    It is sometimes necessary to resort to extremes in order to call attention to something that is pertinent to safety in mining. When some of the experts in occupational safety talk about this topic,

    Jan 1, 1994

  • AUSIMM
    Scoping of Feasibility Studies

    How often does one hear that a recent feasibility study was not a success? Alternatively, when scope of the feasibility study was sent out to tender there was a large discrepancy in tendered prices. I

    Jan 1, 1998

  • AUSIMM
    Canadian Reporting Practices

    In 1556, Agricola noted that "a prudent owner, before he buys shares, ought to go to the mine and carefully examine the nature of the vein, for it is very important that he should be on his guard l

    Jan 1, 1987

  • AUSIMM
    Managing Safety: Management's Role in Preventing Accidents

    An intensive safety campaign at Mount Isa Mines Limited from 1956 to 1966 saw the lost time accident frequency rate fall to half its original level. A review of the safety programme was carried out

    Jan 1, 1975