Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Studies on Distribution Pattern of and Methane Migration Mechanism in the Mining-Induced Fracture Zones in Overburden StrataBy Shugang Li
The layout and efficiency of the degasification system is heavily dependent on the distribution of and the methane migrating mechanism in the mining induced fractures in the overburden strata In this
Jan 1, 2005
-
Analysis of Geologic and Geotechnical Conditions and Their Effects on Longwall Mining to Optimize Mine Planning at Shoal Creek MineBy Yong-Ming Jiang
In cooperation with Cyprus Twentymile Coal Co., researchers from the National Institute for Occupational Safety and Health (NIOSI-I), Spokane Research Laboratory, conducted a study at the Foidel Creek
Jan 1, 1998
-
Evaluation Of Low-Coal ATRS SystemsBy M. Terry Hoch
This paper presents information on low-coal ATRS systems that are now in use. A study was conducted consisting of an in-mine evaluation of ATRS- equipped roof bolters capable of bolting in seams below
Jan 1, 1988
-
Ground Control of a Mine Stope in Weak Rocks Subjected to High In-situ Stresses - A Case StudyBy Charlie Li
A cut-and-fill mine stope, located at a depth of about 1000 m in a lead-and-zinc mine, was closed down because of large roof convergence and fractures appearing on the hanging wall. The instability pr
Jan 1, 2005
-
Roof Monitoring In Limestone Mines-Experience With The Roof Monitoring Safety System (RMSS)By Thomas E. Marshall
During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) examined and characterized conditions at a majority of the undergroun
Jan 1, 2000
-
BHP Billiton Underground Ground Control Fatal Risk Control Protocol ? Development and ApplicationBy Dan Payne
Roof falls and other ground control incidents make up a significant portion of fatal accidents in underground mines. BHP Billiton has undergone a review of all fatalities in their operations and divid
Jan 1, 2006
-
Surface Subsidence Velocity of Fully-Mechanized Thick Seam Top Coal Caving MiningBy Wenbing Guo
Surface subsidence for fully mechanized thick seam top coal caving was measured, and surface subsidence characteristics were then analyzed. The subsidence initiation distance from the set-up room and
Jan 1, 2011
-
A Computer Simulation Of Breakage Of The Main Roof In Longwall MiningBy Deren Zhu
Based on the results of field observation and physical model analyses, a computer simulation method, FEAEBP, has been developed for simulating the breakage of the main roof by considering it as a Kirc
Jan 1, 1988
-
Half a Career Trying to Understand Why the Roof Along the Longwall Face Falls in from Time to Time?By Russell Frith
Probably the most expensive but least well understood roof falls in underground coal mining, are those that occur ahead of the powered supports in the centre of longwall face. Even small roof cavities
Jan 1, 2005
-
Surface Structures Impacted By Subsidence From Pennsylvania Coal Mines, 2003 to 2008By Anthony T. Iannacchione
Underground bituminous coal mining is a large and significant industry within the Commonwealth of Pennsylvania, and it has a legacy of environmental consequence. For example, in 2008, 13.5 acres (5.5
Jan 1, 2011
-
Basics on the Dimensioning and the Extraction of Shaft Safety ZonesBy Anton Sroka
The dimensioning of shaft safety zones is a substantial task of mining subsidence engineering. On the one hand, the coal reserves in shaft proximity are to be mined as complete as possible, because th
Jan 1, 2005
-
Shear Bond Stresses Along Cable BoltsBy Hani S. Mitri
The behaviour of grouted cable bolts used for rock reinforcement as a means of ground control in hard rock mining is investigated. The study utilizes an analytical model which is based on the variatio
Jan 1, 1990
-
Stability Evaluation Of Alternative Designs Of Drift-And-Fill Stoping In Zhaoyuan Gold Mine, P. R. ChinaBy Xianming Zhou
Mining economics is such that too conservative in safety will result in a considerable penalty in mining cost. However, initial planning and design of a mining project often must be done without compl
Jan 1, 1989
-
Integrity Factor Approach to Assess the Stability of Room-and-Pillar MinesBy Kanaan Hanna
The integrity factor approach was developed by the Bureau of nines to assess the stability of mine pillars and has been applied primarily to longwall chain pillars. Recently this approach was applied
Jan 1, 1988
-
The Use of NDT Methods to Determine the Condition of Rockbolt Support During the Recovery of a Previously Flooded Coal Mine Roadway at Thoresby CollieryBy Brian Clifford
Thoresby Colliery is in the process of recovering an old roadway that was flooded following the closure of an adjacent mine. The aim is to re-use the roadway as a gate road for a longwall retreat pane
Jan 1, 2002
-
Analysis Of The Seam Inclination Effect On Roof StabilityBy Hanjie Chen
Mining experiences have shown that in a pitching seam, roof behavior is significantly different from a flat seam. Uphill mining usually experiences more roof problems than downhill mining. Based on a
Jan 1, 2000
-
Evaluation of Rockburst Hazard from Core TestingBy Michael Alber
Coal resource extraction reaches higher depth of overburden and rockbursts as well as associated seismic events appear to become an additional problem to he addressed by ground control engineers. For
Jan 1, 2004
-
Design, Monitoring And Evaluation Of A Pre-Driven Longwall Recovery RoomBy Tom Wynne
In order to shorten the time required and improve safety for a longwall face move, a 36-ft wide longwall recovery room was predriven. The room was supported with specialty bolts, trusses and concre
Jan 1, 1993
-
Intersection Stability and Tensioned BoltingBy Yunqing Zhang
Roof failure occurs much more frequently at intersections than entries and crosscuts. Using a commercial finite element package, four-way and three-way intersections reinforced with the tensioned bolt
Jan 1, 2003
-
Development of A Yielding Steel PostBy John P. Dunford
Ground support continues to be the most important safety consideration in underground mining. The Bureau of Mines has developed a yielding steel post with a capacity of 45 tons and b c1osure allowance
Jan 1, 1986