Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    A Procedure for the Rapid Assessment of Coal Mine Roof Stability against Large Roof Falls

    By Ted Klemetti, Gabriel Esterhuizen, John L. Ellenberger

    "Advanced numerical models can be used to evaluate entry support systems in coal mines. However, these methods require specialized software and specialized skills to create the models and evaluate the

    Jan 1, 2015

  • SME-ICGCM
    Subsidence and Ground Deformation Prediction in North America-A Case Study and New Method Developments

    By Karsten Zimmermann, Peter Cain

    "To receive regulatory approval for a new coal mining operation in North America, extensive investigations of feasibility and potential environmental impacts, including ground deformations, are requir

    Jan 1, 2016

  • SME-ICGCM
    Field and Laboratory Studies for Mechanised Depillaring Under Easily Caveable Roof Strata

    By Ashok Kumar, Rajendra Singh, Arun Kr. Singh

    "A simple analysis of site conditions and capability of the mechanised depillaring (MD) operation found that this approach is suitable to address the strata control issues in coal pillar extraction un

    Jan 1, 2018

  • SME-ICGCM
    Case Study of Conditions Observed During the Removal of a Highly Fractured Roof Beam in Bedded Halite

    By Liane J. Terrill

    A 9O) ft (275 meter) section of a highly fractured beam of halite was mined from the roof of a supported thirteen year old drift at the Waste Isolation Pilot Plant (WIPP). The operation was conducted

    Jan 1, 1997

  • SME-ICGCM
    A Case Study Of Grouted Roof Bolt Loading In A Two-Entry Gate Road

    By Stephen P. Signer

    A field test was conducted by the U.S. Bureau of Mines at the Cyprus Plateau Starpoint No. 2 Mine. near Price. UT. to study the support rock interaction mechanics. Twelve instrumented. fully grouted r

    Jan 1, 1990

  • SME-ICGCM
    Field Evaluation of Yield Pillar System at a Kentucky longwall Headgate

    By Christopher Mark

    The Bureau of Mines is conducting research to assess the effectiveness of different chain pillar designs in maintaining gate entry stability. The study described in this paper was performed in a 1200

    Jan 1, 1988

  • SME-ICGCM
    Australian Longwall Geomechanics - A Recent Study (52cb3b8b-6f2d-4969-ba9d-61fc0c2f72ec)

    By Russell C. Frith

    This paper presents recent findings concerning longwall caving mechanisms relating to Australian mining conditions and their effect upon longwall support requirements and behaviour. The findings arc b

    Jan 1, 1992

  • SME-ICGCM
    Analyses of Valley Fill Slope Stability - Three Case Studies

    By Shiva P. B. Kolli

    Surface mining of multiple scams by mountaintop mining methodology is complex in the Appalachian region of West Virginia. Excess spoil from the removal of overburden and interburden is disposed in the

    Jan 1, 2001

  • SME-ICGCM
    The Influence Of Certain Geologic And Geotechnical Factors On Coal Mine Floor Stability - A Case Study - Introduction

    By Robert C. Speck

    Floor heave or deformation of the mine floor into the mine opening is a problem which has plagued coal mines in this country and others. In mining areas where room and pillar mining is practiced, floo

    Jan 1, 1981

  • SME-ICGCM
    Rib Access Boom for a Roof Bolter

    By Joe McQuerrey, William Kendall, Gene Wilson

    "Roof bolting is the standard for ground control in underground coal mining. Rib and truss bolting is just as important when conditions are less than desirable. As a manufacturer of roof drills, J.H.

    Jan 1, 2010

  • SME-ICGCM
    Assessment of Roadway and Yielding-pillar Performance During Retreat Longwall Extraction at a United Kingdom Deep Mine

    By Leigh Sharpe

    Dunng the last 5 years a United Kingdom colliery has utilised a yielding-pillar configuration to extract a relatively thick coal seam at a depth of 640 m. As part of ongoing research into the siting o

    Jan 1, 1998

  • SME-ICGCM
    Interaction Between Roof And Support On Longwall Faces With Particular Reference To Support Resistance

    The objective of extensive underground experimentation on three longwall coal faces was to improve the stability of mechanised longwall faces through investigation of the relations between support res

    Jan 1, 1984

  • SME-ICGCM
    Experience With The Boundary Element Method Of Numerical Modeling As A Tool To Resolve Complex Ground Control Problems

    By George J. Karabin

    The Roof Control Division of the Pittsburgh Safety and Health Technology Center, MS HA, is routinely involved in the evaluation of ground conditions in underground coal mines. Assessing the stability

    Jan 1, 1994

  • SME-ICGCM
    Development and Application of the TT Anti?Friction Washer for Use with Tensioned Roof Bolt Systems

    By Thomas A. Cook

    The effectiveness of tensioned roof bolt systems has been well researched and documented over the years (Stankus, 1990, 1991, 1997; Guo, 1997; Denton, 2000; Su, 2007). Higher and more consistent inst

    Jan 1, 2014

  • SME-ICGCM
    Ground Control Practice at Leeville Underground Mine

    By Changshou Sun

    The geotechnical properties of mining zones at Leeville Underground mine (or simply called Leeville mine through this paper) are different from one zone to another. The typical ground condition is poo

    Jan 1, 2013

  • SME-ICGCM
    Time Dependent Mining Induced Subsidence Measured by Differential Interferometric Synthetic Aperture Radar

    By Jessica M. Wempen

    Differential Interferometric Synthetic Aperture Radar (DInSAR), a satellite-based remote sensing technique, has been demonstrated as a potentially practical method for measuring mining induced surface

    Jan 1, 2014

  • SME-ICGCM
    An Alternative for More Productive Rib Bolting in Underground Mining Applications

    By Joe E. Bryan, John P. McDonnell

    "Underground mine rib stability is an ongoing safety issue in all mining applications. Rib-related accidents present at least as many problems as roof-related ground control. Underground coal mine rib

    Jan 1, 2015

  • SME-ICGCM
    Case Study of the Barro Branco Coal Mine Pillar Burst

    By Fernando O. L. Xavier

    "The Barro Branco coal mine was located in the southern region of Brazil, in the state of Santa Catarina. In 2002, an incident occurred at the mine, leading to a violent, massive pillar failure, resul

    Jan 1, 2017

  • SME-ICGCM
    Suspension Designs Required in the Logical Framework

    By Ross W. Seedsman

    The logical framework recognises that a coal mine roof can be intrinsically stable or may collapse in one of four ways. Suspension of the immediate roof is one of fundamental ground control strategie

    Jan 1, 2014

  • SME-ICGCM
    Development of Road Header Roof Bolting Module

    By Sean C. Farrell

    In underground mining and tunneling, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Australian companies WDS Limited and Cram Fluid P

    Jan 1, 2014