Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Synthesis Of Monolithic Si2n2o Ceramic From Reclaimed Silicon And Desert SandBy M. Radwan, S. Shimada, S. Z. El-Tawil, K. A. El-Barawy, Y. Miyamoto
This study presents the results of synthesizing monolithic siliconoxynitride, Si2N2O, ceramic from a mixture composed of reclaimed silicon and natural desert sand by using the nitriding combustion syn
Jan 1, 2004
-
South Interceptor Tunnel Construction Using a Lovat EPBMBy Dennis Molvik, Omar Fulton, Chris D. Breeds, Don Gonzales
This paper presents and describes the South Interceptor Parallel Phase III Contract C93012C, which involved construction of a nominal 2.7 m (9-ft) finished diameter sewer conveyance using both pipe ja
Jan 1, 2003
-
Financial Evaluation and Risk Assessment of a Placer Gold Deposit during the First Stages of Exploration: A Case StudyBy D. Drymonitis, G. Gialoglou
"Placer gold mineralizations have been observed in the north-eastern parts of Greece. Some of them have been at first evaluated to be of special interest so, exploration campaigns have been designed a
Jan 1, 2005
-
Handling Infiltration Into Underground StructuresBy Edward D. Graf
Once the heavy work of mining, supporting and completing an underground structure is finished, there is frequently the problem of handling unwanted water infiltration into the opening. Methods of cont
Jan 1, 1987
-
Hierarchical Systems Analysis Of Potential Environmental Impacts Of Aggregate Mining ActivitiesBy K. E. Kolm, W. H. Langer
Developing natural aggregate resources (sand, gravel, and stone) creates environmental impacts. A systems analysis method has been designed to characterize the components of the environmental system,
Jan 1, 2001
-
Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels ProjectBy Brian Fulcher
The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft 3/sec) of water into Southern California. The 1
Jan 1, 2008
-
Problems With Appraising Electric Utility Assets After Deregulation (9b7f9b1b-6191-4f06-b182-7adc8e5b7333)By J. Kern, M. Cain, T. Torries
Until recently, the generation of electricity was regulated in all states and the value of generation assets in a regulatory environment for ad valorem taxation were based largely on the book value of
Jan 1, 2001
-
Real-Time Monitoring Of Cable Shovel Stress For Improved Machine HealthBy S. Frimpong
Cable shovel requires continuous monitoring through excavation to achieve reliability, longevity and economic usage. The operating environment and the stress and deformation fields on the front-end as
Jan 1, 2006
-
Probabilistic Approach To Project-Specific Political Risk Analysis For Mineral ProjectsBy S. Dessureault, Z. Gavelan
As globalization continues, sustainability and social responsibility has become essential in foreign mining investment. However this global trend and the increasing acceptability toward the globalizat
Jan 1, 2004
-
European Tunneling Technology And MethodsBy Brian Fulcher
While tunneling in Europe has been a tradition for centuries, many companies and countries have embraced tunnel innovation with considerable vigor and creativity. Indeed, local needs and site conditi
Jan 1, 2007
-
New Opportunities and Challenges in Surveying Underground Cavities Using Photogrammetric MethodsThe exploitation of the underground is currently undergoing a major transformation process. Besides mining, alternative ways of utilization are playing an increasingly important role. These alternativ
Jan 7, 2020
-
Eskay Creek Mine And Mill – A Continued SuccessBy G. Biles, K. Loughran, R. Anand
The Eskay Creek Mine, a high-grade gold and silver underground mine in northwestern British Columbia started operations in late 1994. For the first three years of operation, ore was crushed to minus
Jan 1, 1999
-
Dust Control for Coal Handling : Design Considerations and SolutionsBy Henning E. Soderberg, Robert Brien, O&apos
Coal may be the answer to US energy problems, but it also has its drawbacks. If it is crushed, screened, dumped, or moved, the environmental engineer is faced with a dust problem. To control coal d
Jan 10, 1981
-
Recovery Of Metal Values From Copper Slags By Flotation And Roasting With PyriteBy G. Bulut
The recovery of copper and cobalt from ancient copper slags from the Küre region of Turkey was investigated. A fayalitic-type of ancient copper slag containing 1.24% Cu, 0.53% Co and 53.16% Fe were su
Jan 1, 2007
-
Evaluations Of Bit Sleeve And Twisted-Body Bit Designs For Controlling Roof Bolter DustBy T. W. Beck
Drilling into coal mine roof strata to install roof bolts has the potential to release substantial quantities of respirable dust. Due to the proximity of drill holes to the breathing zone of roof bolt
Feb 27, 2013
-
Development And Large-Scale Testing Of Innovative Tunnel Support SystemsBy Robert M. Semple, Harvey W. Parker
INTRODUCTION Two promising innovative tunnel support systems are being developed by the Civil Engineering Department of the University of Illinois. One of these is a lining which can be placed by a
Jan 1, 1997
-
The Future Of Dicalcium PhosphateBy F. Habashi
The phosphate fertilizer industry is at present based mainly on the use of sulfuric acid. This technology results in the generation of large amounts of radioactive gypsum that represents disposal and
Jan 1, 2011
-
Waste management in Estonian oil shale industryBy M. Lohk, Y. -. R. Pastarus
Oil shale industry of Estonia provides a significant contribution to the country’s economy, but causes a large number of different problems. In spite of high economical parameters of the current under
Jan 1, 2011
-
Major Issues In Subsidence RegulationBy Gregory R. Gorrell
The legal issues surrounding the regulation of subsidence are among the major concerns facing the underground mining industry today. Whether subsidence occurs almost immediately as a result of longwal
Jan 1, 1986
-
A Case Study Exploring Field Level Risk Assessments as a Leading Safety IndicatorBy R. Heiser, J. Vendetti, B. P. Connor, E. J. Haas
"DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the views of the National Institute for Occupational Safety and Health. Reference to sp
Jan 1, 2017