Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Estimation Of Incremental Haulage Costs By Mining Historical Data And Their Influence In The Final Pit Limit DefinitionBy R. Benito
This paper describes the application of modern data-analysis tools, such as data mining, to determine a representative cost driver for haulage activity. This cost driver was subsequently used to trace
Jan 1, 2008
-
An Analysis Method For Modeling Compensation Of Settlements Due To Tunnel Driving BY Grouting Cement SuspensionsBy Christian Wawrzyniak
An analysis method for modeling compensation grouting based on the finite element method is presented. By this method the design parameters of compensation grouting, grouting pressure and grouting vol
-
Public-Private Partnerships: An Efficient And Effective Means To Restore Abandoned Minelands In Western PennsylvaniaBy M. H. Dunn, T. P. Danehy, C. F. Denholm, S. L. Busler
The problems associated with abandoned minelands are so extensive that neither federal, state, or local governments nor the mining industry nor watershed groups can adequately address these problems i
Jan 1, 2002
-
Use of Mine Tailings as Precast Construction Materials through Alkali Activation Mining, Metallurgy and Exploration (afe55b4e-c2bb-46a0-a2d9-37ae31a22959)By Qingming Feng, Bo Huang, Dongbo An, Jinhong Zhang
A study of the application of mine tailings as precast construction materials through alkali activation has been carried out, focusing on efficiently activating mine tailings, reducing alkali consumpt
-
Use of Mine Tailings as Precast Construction Materials through Alkali Activation Mining, Metallurgy and ExplorationBy Qingming Feng, Bo Huang, Dongbo An, Jinhong Zhang
A study of the application of mine tailings as precast construction materials through alkali activation has been carried out, focusing on efficiently activating mine tailings, reducing alkali consumpt
-
Evaluation of Geological Conditions Ahead of TBM Using Seismic Reflector Tracing and TBM Driving DataBy Descour Jozef, Suguru Shirasagi, Takuji Yamamoto, Koji Murakami
For TBM tunneling no visual inspection of excavated ground is possible. This may hinder the high-speed excavation, particularly in complex ground conditions. The TBM Excavation Control System was deve
Jan 1, 2007
-
Measurement and Analysis of Ground Movement and Load Redistribution at a Longwall Mine in Central UtahTo gather additional field data from the western United States, researchers from the National Institute for Occupational Safety and Health (NIOSH) installed an array of field instrumentation at a long
Jan 7, 2020
-
Effects of Chinese Mineral Strategies on the U.S. Minerals IndustryBy P. A. Plunkert, D. E. Morse, Pui-Kwan Tse, W. D. Menzie, Lucy McCartan, J. F. Papp
China’s burgeoning economy is responsible for a major share of recent world mineral consumption increases. In addition to factors traditionally recognized in market economies1 and factors unique to s
Jan 1, 2006
-
Portland, Oregon’s Other CSO TunnelsBy Michelle Lostra, Red Blanchette, Jan Babendererde, Greg Colzani
The City of Portland’s Westside CSO Project is constructing a deep tunnel system to reduce combined sewer overflows (CSO) from entering the Willamette River. Several kilometers of microtunneled pipeli
Jan 1, 2005
-
Targeting and Prioritizing Safety Interventions in West Virginia – Preprint 97-51By J. M. Dean, R. L. Grayson, R. C. Althouse, M. J. Klishis, G. L. Winn
Using powerful database management software, nested-field analysis and microanalysis of narratives have been made of West Virginia accident data, resulting in a new approach for targeting and prioriti
Feb 24, 1997
-
Decline Development At The Lakeshore PropertyBy Robert S. Hendricks
LOCATION AND HISTORY The Lakeshore Copper property is located on the Papago Indian Reservation approximately 30 miles South of Casa Grande, Arizona. This major porphyry type deposit was discovered
Jan 1, 1997
-
Looking for Mr. Good ContractBy Wayne E. Kilker, Michael J. McBride, William P. Levy, Thomas J. Lamb
Between 1989 and 2004 the Massachusetts Water Resources Authority (MWRA)constructed several major wastewater and water tunnels associated with three major projects in the Boston area of eastern Massac
Jan 1, 2005
-
Advances in grid-based numerical modeling techniques for improving gas management in coal minesEffective gas management in coal mines, as well as proper ventilation design, is very important for maintaining the safety of underground coal miners. Advances in numerical modeling techniques have en
Jan 1, 2009
-
Tunnelling on the South East Transit ProjectBy T. W. Peglas, J. Doherty, R. A. Day
The South East Transit Project is a $520 million project in Brisbane, Australia which includes the construction of a 32 km Busway to access the south-eastern suburbs. Close to the centre of Brisbane,
Jan 1, 2001
-
Financing of mining projects - Can banks drive sustainability?By M. Götze, P. Eysel
Over the last years, the importance of the assessment of environmental and social aspects as well as of issues of good governance has increased significantly in mining finance. For this, international
Jan 1, 2011
-
Industrial Minerals 2003Editor’s note: As usual, the June issue features an industrial minerals review. And some thanks are in order. Thank you to the industrial minerals annual-review editor, to the technical committees
Jan 1, 2004
-
The Technology And Economic Incentives For Recovering Coal From Tailings ImpoundmentsBy A. S. Murphy, E. V. Manlapig, C. Green, J. W. Parkinson
Historically in Australia and the United States many coal mines deposited raw wash plant fines into large slurry impoundments. At the time the technology and market economics did not exist to make it
Jan 1, 2001
-
Correct Identification Of Chrysotile Asbestos In OresBy Allison
During the 1980’s, laboratories opened throughout the United States to serve the analysis needs of a rapidly growing asbestos abatement industry. The samples analyzed were either collected during the
Jan 1, 2005
-
Measurement of Overburden Failure Zones in Close Multiple-Seam Coal MiningBecause of its small interburden thickness, concentrated stress distributions, high coal seam metamorphism, and complex geological conditions, mining the five coal seams (Nos. 5, 7, 8, 9 and 12) of Ka
Jan 7, 2020
-
Mining And Marketing Altered Volcanic Tuff At The Heart Of Nature?s Alum/Sulfur MineBy John Heter
An alum/sulfur deposit (USDA organic registered) was mined underground for alunite (K,Na) Al3 (SO4)2 (OH)6 from the early 1900s to the 1930s. It is now being mined as an open pit quarry. A larger as
Jan 1, 2008