Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SAIMM
    Further studies on the elution of gold from activated carbon using water as the eluant

    By R. J. Davidson, V. Veronsee

    Some of the parameters affecting the elution of gold from freshly loaded activated carbon using pure water as an eluant were studied. The procedure involved pretreatment of the gold-loaded activated c

    Jan 1, 1979

  • SAIMM
    A note on the strength of Flint particles

    By N. A. Smith, R. J. Fowell, J. L. Hislam

    Abstract: Data are presented from two sites in southeast England, where problems were encountered in tunnelling through ground containing flint. In response to the difficulties, substantial laboratory

    Jan 1, 2003

  • SAIMM
    End-Users, Recyclers And Producers: Shaping Tomorrow?s PGM Market And Metal Prices

    By S. A. Forrest, B. Clarke

    Trends in PGM demand?The conference paper will cover a concise analysis of demand trends, which will include the major PGM end-use sectors (autocatalysis, jewellery, glass, petroleum, nitric acid, med

    Jan 1, 2006

  • SAIMM
    Geotechnical Characterization and 3D Modelling of the Biologically Cemented Mandena Heavy Mineral Sand Deposit - A Case Study

    By F. Hees, A. H. Bracken, L. I. Boshoff

    "Biological cementation of the Mandena heavy mineral sand deposit in Madagascar was causing difficulty in dredge mining and hence in planning and control of production rates. An investigation was init

    Jan 1, 2017

  • SAIMM
    Technical and Economic Assessment of Subsurface Rock Mass Deformation and Pore Pressure Monitoring Using a Network of Wireless Devices

    By C. Holck, J. Yarmuch, J. Read

    "Steepening of slopes provides the means to reduce waste extraction and increase ore recovery in open pit mines; however, it may also adversely affect safety by posing a higher risk of slope failure.

    Nov 1, 2018

  • SAIMM
    Managing Mine Road Maintenance Interventions Using Mine Truck On-Board Data

    By Willem J. Marais

    The management of unpaved mine road networks on large surface mines rarely results in optimal road maintenance strategies and minimised total road-user costs. This is ascribed mostly to the complex a

    Jan 1, 2008

  • SAIMM
    Size effect on shear strength of computer-aided-manufactured joints

    By Y. -H. Chang, Y. -J. Jou, T. -S. Ueng, I. -H. Peng

    In order to systematically study the size effect on the shear strength of rock joints, this study used the computer-aided-manufacturing system to reproduce the artificial rock joints for saw-toothed j

    Jan 1, 2003

  • SAIMM
    Mining and Treatment Plant Practice at the Finsch Mine, De Beers Consolidated Mines Ltd.

    By D. Rankin, H. J. Stucke, W. K. B. Loftus

    Discussion: H. J. Wright (Member): The authors are to be congratulated on presenting such a comprehensive and lucid account of bringing a large diamond mine into efficient production from the grass r

    Jan 3, 1969

  • SAIMM
    Extending the Application of PAS 55/ ISO 55 000 to Mineral Asset Management

    By T. Tholana, P. N. Neingo

    "A mineral resource constitutes the principal underlying asset of a mining company, and must be exploited and managed in such a way that maximum value is derived from it. Various asset management fram

    Jan 1, 2016

  • SAIMM
    Thermodynamic And Experimental Aspects Of Thallium Extraction From Liquid Lead

    By Piotr M. Kapias

    Keywords: extraction, lead refining, Pb-Tl solutions, PbCl2-TlCl solutions. The theoretical part of the paper presents an analysis of the conditions of Tl extraction from Pb using different extra

    Jan 1, 2008

  • SAIMM
    Mechanical behaviour of rock salt masses under high stress to strength ratio (damaging) and under very low stress to strength ratios with high confining pressure (healing)

    By Z. Hou

    ABSTRACT: Short-term strength, damage and healing boundaries for rock salt are experimentally determined and integrated into the Hou/Lux-MDS damage-healing model. This model can be used to describe th

    Jan 1, 2003

  • SAIMM
    Stability analysis of ore passes in the Kiirunavaara mine

    By J. Sjöberg, P. Lundman, E. Nordlund, C. Quinteiro

    Abstract In the Kiirunavaara underground mine, crude ore is transported through ore passes from the production levels to the main haulage level. Failure and stability problems have occurred in som

    Jan 1, 2003

  • SAIMM
    Optimal Valuation And Kriging - 9.1 Definitions: Kriging Estimator And Kriging Error

    [Consider a square block W in an ore body S2, to be valued from one centre sample w, and one corner sample w2 (Fig. 9.1). The sample set is ws = Iw,;w21. We can estimate the block average µw by the a

    Jan 1, 1978

  • SAIMM
    Behaviour analysis of a slope in the river Sela right back

    By J. E. Quintanilha de Menezes, L. Ribeiro e Sousa, I. Ferreira

    The Paradela dam has a spillway that makes it possible to discharge a maximum flow of 400 m3/s, the water discharges being on the river Sela, about 2km upstream the river Cávado. After the first use o

    Jan 1, 2003

  • SAIMM
    Note on Some Characteristics of Anfex

    By N. W. Munro

    SYNOPSIS Certain disadvantages associated with the use of Anfex have been raised on previous occasions. This interim investigation shows that by loading at lower pressures the sensitivity to initiati

  • SAIMM
    Orange Free State Branch Proceedings of the Annual General Meeting

    The annual General Meeting of the Branch was held in the St. Helena Club on Wednesday, 4th August, 1971 at 8.00 p.m. Mr N. A. Honnet (Immediate Past Chairman) was in the chair. There were also p

  • SAIMM
    3-D Modeling of rock mass quality

    By P. Syrjänen, Lovén. P.

    Because geostatistics together with block modeling has not been studied in detail before in the rock mechanics, a two-year research program to investigate the practical use of geotechnical modeling wa

    Jan 1, 2003

  • SAIMM
    Calculation Of [?] And [s] ; Auxiliary Functions And Graphs - 6.1 General

    [The following notations will be used: O an ore body. W a sample of size w located in O; the size of this sample. W a block or a sample, of size W, located in O; the size of this block or sample.

    Jan 1, 1978

  • SAIMM
    An evaluation of yielding timber props as a support system in rockburst conditions

    Written contribution by J.F. Curtist The paper is an interesting exercise in the application of mathematics to a theoretical situation presumed to oc¬cur underground. However, some of the assumptions

    Jan 1, 1991

  • SAIMM
    A parametric study of the discontinuity in rock mass and its influence on tunnel behavior

    By D. -H. Park, G. -j. Kim, Y. -J. Park, C. -S. Hong, S. -Y. Choo

    To evaluate the quantitative tunnel behavior influenced by characteristics of discontinuity, this pa-per executes the parametric study using 2 and 3-dimensional DEM analysis. First of all, this study

    Jan 1, 2003