    Pile Foundations For Algiers New Airport Terminal

    By Ramdane Bahar

    The new Algiers airport building is a reinforced concrete building of more than 80 thousand square meters of floor slabs. It is located at Dar-EI-Beida, near the old passenger terminal, about 20 km ea

    Jan 1, 2002

  • DFI
    Levee Repair and Upgrade by Dual Sheet Pile Walls and Accordion Sheet Pile Wall

    By Takefumi Takuma, Ali Fayad, Shigeru Kambe

    "This paper discusses the unique design and construction circumstances of the cantilevered dual sheet pile walls and the Accordion Sheet Pile Wall for the repair and upgrade of the East Garden Grove-W

    Jan 1, 2017

  • DFI
    Augered Cast-In-Place Pile Load Tests On The Cincinnati, Ohio/Northern Kentucky Riverfront

    By Theodore W. Vogelpohl

    Augered cast-in-place piles have proven to be effective, adaptable and economical for projects throughout the Ohio River Valley. Specifically, they have been used extensively for high-rise structures,

    Jan 1, 2005

  • DFI
    The Use of Thermal Integrity Profiling (TIP) to Verify the Integrity of Deep Foundations

    By Beim Jorge, Piscsalko George

    "Verifying the quality of cast-in-place foundation applications, particularly those cast under slurry, is of course important, due to its great dependency on the methodology employed and on the practi

    Jan 1, 2015

  • DFI
    Mediation Of Construction Disputes - An Advanced Preparation Guide For Mediation Of The Complex Construction Case - Introduction

    By Alan Alhadeff

    Why is mediation being hailed as the wave of the future? The high cost of putting on a trial, over-crowded court calendars and long trial delays have resulted in what prominent attorneys and leadi

    Jan 1, 1990

  • DFI
    Ground Freezing In Urban Areas And Under Special Conditions

    By Frank Haehnig

    Ground freezing is a technique which is used more and more in tunnelling under complex ground conditions. This paper will present three case studies which highlight different aspects of the ground

    Jan 1, 2008

  • DFI
    Comparison of the Pre-Construction and Production QC Test Results for the Sela-22 Elliptical Jet Grouting Project (New Orleans, LA)

    By Filippo Maria Leoni, Alessandro Bertero, Gianluca Pianezze

    "As part of the Southeast Louisiana (SELA) drainage program, designed by the U.S. Army Corps of Engineers (USACE) to reduce flood damages in the City of New Orleans and surrounding parishes through th

    Jan 1, 2016

  • DFI
    Drilled Pier Foundation In Hard Carbonate Rock ? Synopsis

    By K. E. Darnell

    Drilled pier foundations have long been a favored foundation type for heavily loaded structures. Drilled piers derive their load-bearing capacity from end-bearing, and/or sidewall friction. This type

    Jan 1, 2010

  • DFI
    Ralston Dam Spillway Stability Over Pierre Shale

    By Gokhan Inci

    Stability problems with dam spillways on existing landslides and appropriate mitigation measures to remedy them are ongoing concerns for geotechnical engineers. The first successful application of dri

    Jan 1, 2007

  • DFI
    Innovative Foundation Support and Liquefaction Mitigation Using Deep Soil Mixing and Micropiles

    By Leo Panian, Ryan Nagle, Priyanshu Singh, Gina Carlson, Wayne Magnusen

    "This case study presents the design and construction of an integrated foundation and ground improvement solution utilizing deep soil mixing (DSM) and micropiles. 270 Brannan is a midrise office build

    Jan 1, 2017

  • DFI
    TTMJ – The New System for Slurry (Diaphragm) Wall Joints

    By Maurizio Siepi, Paul van Horn, John Coupland, Julian Crawley

    "TTMJ is the acronym for the Slurry (Diaphragm) Wall Tension Track Milled Joint currently in development as part of the European Union's innovative and far-reaching Horizon 2020 initiative (FTI Pilot-

    Jan 1, 2017

  • DFI
    Using Seismic Tomography To Evaluate Foundation Structures

    By Ed Kase

    Cross-hole sonic logging (CSL) has become the universal standard, nondestructive testing (NDT) method used in evaluating the integrity of foundation structures to maintain quality assurance and qualit

    Jan 1, 2003

  • DFI
    Performance Analysis Of Fly Ash Stabilized, Highly Saline Unsaturated Expansive Clays: A Case Study

    By Mohini Patel, Jahnavi Parmar, Pranav R. T Peddinti

    Expansive clays pose a variety of geotechnical problems. Although the admixture stabilization is proven to address their problematic swelling and shrinkage characteristics, the influence of unsaturate

    May 1, 2022

  • DFI
    Session 23 "Grout in Rock and Mining"

    By John Davie

    We used a Remtek survey in Glenrock and had very good luck with it when we first started the initial investigation. We would have loved to have used that more but my understanding is the equipment is

    Feb 10, 2003

  • DFI
    Instrumented Static Load Testing-Auger Cast-In-Place Piles - Introduction And Purpose

    By Michael T. Lambert

    The purpose of the this paper is to demonstrate the benefits of using additional instrumentation during load tests of auger-cast-in-place piles. Traditionally, only load and butt displacement are dete

    Jan 1, 2000

  • DFI
    John F. Kennedy Airport Site Redevelopment: Tapertube Pile Foundation

    By Gisele R. Passalacqua, Aly Mohammad, Joanna Smith

    The $13 billion John F. Kennedy (JFK) airport construction redevelopment program includes new terminals and buildings that are supported on piles to meet the airport expansion demand due to increased

  • DFI
    Improvement Of Bearing Capacity Of Bored Piles By Grouting Method

    By Andrzej Tejchman

    A method of improvement of a subsoil under bored pile base by injection is presented. The method employs a special chamber attached to the reinforcement at the bottom of the drilled borehole. The cham

    Jan 1, 2002

  • DFI
    Micropile Performance Variability: A Fundamental Case Study

    By Walter E. Vanderpool

    Type 1B micropiles (Bruce and Juran, 1997) can be installed rapidly and efficiently. During an 85-day period, 536 micropiles were installed to depths of 61 meters within a site 41 meters by 43 meters.

    Jan 1, 2002

  • DFI
    Incorporating Site Variability into LRFD Design of Pile Foundations

    By Murad Y. Abu-Farsakh, Md Habibur Rahman

    The properties of all natural soil deposits are highly variable, and they are rarely homogeneous. Cone penetration tests (CPT) were used to assess the site variability, which was then incorporated in

    Sep 8, 2021

  • DFI
    Time-Dependent Increase Of The Bearing Capacity Of Displacement Piles

    By Florian König

    It is well known that the bearing capacity and stiffness of displacement piles may increase significantly with time, a phenomenon usually referred to as set-up. In cohesive soils the set-up is commonl