Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Seepage Barrier Mix Design Development, Installation, and Evaluation

    By George W. Little, John Councilman

    "The selection, evaluation, and modification of contractor mix designs for self-hardening seepage barriers, completed by the slurry trench excavation method, can be one of the most critical and challe

    Jan 1, 2016

  • DFI
    Design And Construction Of Micropiles Each Subject To 110 Kips Of Lateral Load

    By Andrew Baxter

    The Crystal Bridges Museum of American Art in Bentonville, Arkansas is a beautiful glass and concrete structure cut into a valley that mingles with water ponds spanned by multiple bridges with suspend

    Jan 1, 2008

  • DFI
    Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach

    By M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek

    "The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB

    Jan 1, 2016

  • DFI
    Construction of a Ground Improvement Scheme to Support Large Mechanically Stabilized (MSE) Earth Walls in Kitimat, BC – Using Cutter Soil Mixing

    By James Coull, Brian Wilson, David Siddle

    "In 2012, Golder Construction Inc. was awarded a Design-Build contract for the design and construction of an extensive, deep ground improvement scheme to support up to 20 metres (66 ft) high Mechanica

    Jan 1, 2017

  • DFI
    The Use of Controlled Modulus Column (CMC) Ground Improvement for Support of Large Warehouses

    By Brandon T. Buschmeier, Sonia S. Swift, Michael P. Walker, Frederic Masse

    "Ground improvement has undoubtedly become a cost-efficient and effective solution to support the development of poor soil sites. Ground improvement elements, such as Controlled Modulus Columns (CMCs)

    Jan 1, 2017

  • DFI
    Goethals Bridge Replacement Project - Performance-Based Design of the Drilled Shaft Foundations

    By Chunli Wei, Mark Jen, Xiaojun Wang

    "After more than 85 years of service, a critical link between New York and New Jersey, the Goethals Bridge over the Arthur Kill waterway, is being replaced with two new parallel bridges. Each bridge i

    Jan 1, 2016

  • DFI
    Diggs Does Deep Foundations

    By Robert Bachus, Nikolaos Machairasm, Allen Cadden

    Data Interchange for Geotechnical and Geoenvironmental Specialists (DIGGS) is a data transfer standard that is gaining widespread acceptance in the geotechnical and geoenvironmental communities. Origi

    Jan 1, 2019

  • DFI
    R C Harris Water Filtration Plant Expansion - Excavation Support Design, Installation and Performance

    By Michael Cianchetti, Nadir Ansari, Matthew Janes

    "PROJECT DESCRIPTIONThe R C Harris Filtration Plant underwent an expansion to install an underground sludge treatment capability consisting of a series of underground tanks within stepped excavations

    Jan 1, 2007

  • DFI
    Effective Sampling, Testing and Specification Approaches for Deep Mixing at Kitimat LNG, BC

    By Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li, Donald A. Bruce

    "In-situ wet grab sampling and post-installation coring of soil-cement structures are typically carried out for Quality Control (QC) and Quality Assurance (QA) of deep mixing (DM) schemes. Wet grab sa

    Jan 1, 2015

  • DFI
    Helical Pile Foundation Solution for Landfill Redevelopment

    By Kevin Baumgartner, Steven Babcock

    A landfill in Phoenix, AZ reached capacity and was graded over in the 1970s. The property was subdivided into lots in 2007 to create a business park. However, the challenging site conditions caused by

    Sep 8, 2021

  • DFI
    Impact Assessment Of Excavation Induced Settlements: A Study Of Chennai Metro Phase Ii

    By Ganesh Deepak K., Anjana R. K., Dr. Kumar Pitchumani N., Rajasekharam R. M. V. M. S. S.

    The Phase 2 of Chennai Metro is being introduced in the city to ease the dependence on the existing transportation systems. Phase 2 is a combination of underground and elevated metro stretches compris

    Nov 1, 2022

  • DFI
    Drilled Displacement Rigid Inclusions Support Port-Based Cement Facility

    By Morgan NeSmith

    The Port of Palm Beach is a full-service landlord port in Riviera Beach, Florida. The port and its tenants process more than $14 billion in commodities. About 80% of these are exports, which makes the

    Apr 1, 2023

  • DFI
    Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off Wall

    By James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.

    "The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150

    Jan 1, 2016

  • DFI
    Virtual Imaging Technologies as Decision-Making Tools for Geo- Hazards

    By Arpana P. Sabu, Themis Vaxevanis, Sissy Nikolaou, Guillermo Diaz-Fanas

    Geo-failures from extreme events (landslides, wild fires, earthquakes, floods, etc.) have increased exponentially in recent years around the world and within the USA. When catastrophic failures occur,

    Jan 1, 2019

  • DFI
    A Digital Twin For Deep Vibro Ground Improvement

    By Negin Khalili-Motlagh-Kasmaei, Paul O'Leary, Christopher J. Rothsiedl, Dimitar Ninesvski, Alexander Zöhrer, Vincent Winter

    This paper presents the implementation of a digital twin for the vibro-replacement ground improvement process, as part of a digital construction site. The goal is to implement an evidence-based qualit

    May 1, 2022

  • DFI
    Gowanus Pumping Station; Jet Grout Bottom Seal and Deep Support Columns

    By Paul C. Schmall, Kevin Clarke, Paul J. Lewis, John M. Stanbury

    "The $200M rehabilitation of the more than 100-year-old Gowanus Flushing Tunnel and pumping station located on the Gowanus Canal in Brooklyn, NY required deep excavations in an extremely congested urb

    Jan 1, 2016

  • DFI
    Installation and Efficiency of Common Helical Pile Couplings

    By Jason Herron, Joseph Brown

    The common couplings for joining sections of helical piles with an outside diameter of 6.625 inches and 8.625 inches are square on square, flange to flange, external pipe sleeve, internal pipe sleeve,

    Jan 1, 2019

  • DFI
    Nicholson In The Neighborhood: Virginia’S North Hill Project

    By Dominic Ammon, Mark Rothbauer, Paul Landers P. E.

    Across the Potomac River from the location of the DFI47 Annual Conference (October 2022), in Alexandria, VA, two large permanent anchored walls with a decorative shotcrete face were recently construct

    Oct 1, 2022

  • DFI
    Assessment of Existing Bulkhead Walls for Dredging Impacts

    By Rakam Lama Tamang, Michael J. Byle, Stephen Ernst

    "For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen

    Jan 1, 2017

  • DFI
    Challenges Of Earthen Cofferdam In Deep Excavations For Waterfront Structures, A Case Study

    By Balasubramani M., Ramana P. V., Bairagi K.

    This paper is a case study of an earthen Cofferdam, constructed for a deep excavation at Intake location in river Aaundha, Maharashtra, India. A 12 m (39 ft) deep excavation was made to construct the

    Nov 1, 2022