Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Massive Sulphide Deposits In Nova Scotia

    By B. J. Keating

    "AT PRESENT, it is not certain that any of the sulphide de in the Province of Nova Scotia attain the lower grade limit of 60 per cent sulphides over the minimum area of 1,000 square feet suggested as

    Jan 1, 1960

  • CIM
    Forward and reverse numerical modeling of the nanoindentation of coatings

    By W. Beres, Li. J.

    The finite element method (FEM) has been applied to investigate the stress fields and deformation of a TiN/Ti-6A1-4V coating/substrate system subjected to nanoindentation. MSC Patran and MSC Marc were

    Jan 1, 2004

  • CIM
    Structural control of gold mineralization at the Sigma Mine, Val d'Or, Quebec

    By Francoi Robert, Andre J. Audet, Alex C. Brown

    "The Sigma gold deposit is in a band of deformed metavolcanic rocks that are cut by an irregular mass of porphyritic diorite and by narrow undeformed feldspar porphyry dykes. The gold is in veins cons

    Jan 1, 1983

  • CIM
    Structural control of gold mineralization at the Sigma Mine, Val d'Or, Quebec (600da5a7-f4b6-4b7c-9c1a-0b20e710d663)

    By Francoi Robert, Andre J. Audet, Alex C. Brown

    "The Sigma gold deposit is in a band of deformed metavolcanic rocks that are cut by an irregular mass of porphyritic diorite and by narrow undeformed feldspar porphyry dykes. The gold is in veins cons

    Jan 1, 1983

  • CIM
    The Electric Furnace Melting of Copper

    By R. H. Waddington

    Historical The limitations of reverberatory furnace operation have prompted many investigators to consider electric furnaces for melting electrolytically refined cathode copper. In the majority of

    Jan 1, 1946

  • CIM
    A study on kriging small blocks

    By Margaret Armstrong, Normand Champigny

    "In order to define the ore/waste boundaries as finely as possible, mine planners often insist on kriging very small blocks (relative to the spacing of the available sample grades). These kriged estim

    Jan 1, 1989

  • CIM
    Development and Evaluation of Polarization Parameters As Quality Predictors for Zinc Electroplated From Acid Sulfate Electrolytes

    By E. Chiyangwa, L. Schoeman

    The commercially successful electrowinning and refining of metals typically requires the optimization of the electrolyte composition and operating parameters to produce high quality compact electropla

    Jan 1, 2014

  • CIM
    Slurry Pipelines ? A Historical Perspective

    By Ron H. Derammelaere

    Coal Slurry Test Pipeline and First Recorded Commercial Pipeline Wallace Andrews founder of New York Steam Company awarded patent for ?Method of Transportation? that involved pumping finely divide

    May 1, 2013

  • CIM
    Marconaflo and Its Use In New Mineral Developments

    By L. P. Connolly, M. J. Fraser

    "Hydraulic transport of solids has long been an important technique in mining and beneficiation. More recently, slurry pipelines have proved to be economic for longdistance overland transport of many

    Jan 1, 1972

  • CIM
    Investigation of Y-doped BaCeO3 as electrolyte in propane fueled proton conducting solid oxide fuel cell

    By Y. Feng

    Perovskite structured oxide 15% Y-doped BaCeO3 (BCY15) has been evaluated for use as proton conducting electrolyte in SOFC with propane as the fuel and Pt as both electrodes. Under the fuel cell condi

    Jan 1, 2005

  • CIM
    Influence of Nonpolar Group Structure on Collecting Property of Two Hydroxamic Acid to Hemimorphite

    By C. Han, S. J. Zhou, Y. B. Shen, D. Z. Wei, P. Fang

    "Collecting property of two hydroxamic acid collectors have different type of nonpolar structure to hemimorphite has been comparatively studied via monomineral flotation test, and the reason causes di

    Jan 1, 2016

  • CIM
    Community Engagement: When Is It The Right Time To Initiate And How And Why Should It Be Done?

    By Mark Liskowich

    When is it the proper time to initiate engagement with various stakeholders, including Indigenous communities? This paper will demonstrate what stage of a project’s evolution is the appropriate time t

    Jan 1, 2020

  • CIM
    Debottlenecking the Primary Grinding Circuit of the Nunavik Nickel Project

    By M. Lebeuf, A. Dumais, C. Farsangi, N. Singh

    The Nunavik Nickel project began ramp-up of a new ore body (Expo) in November 2014. This new deposit is significantly more competent than the previous ore type milled (i.e., the plant moved from a fee

    Jan 1, 2016

  • CIM
    Management of Thorium and Uranium in Mining and Processing of Rare Earth Minerals

    "Ore deposits containing rare earth elements normally contain small amounts of the radioactive elements thorium (Th) and/or uranium (U). These are the naturally-occurring isotopes U238, U235, and Th23

    Jan 1, 2012

  • CIM
    Forging of Nickel-Iron Based Superalloy 901

    By A. R. Khodabandeh, T. Nematkhah

    Correct selection of forging parameters is very important to produce sound superalloy parts. In this investigation nickel-iron base superalloy IN901 successfully forged and seal spacer, which is a par

    Jan 1, 2006

  • CIM
    Lithogeochemistry related to gold mineralization in saskatchewan

    By Michel Mellinger

    This paper presents preliminary results of a project aimed at obtaining a better understanding of the genesis of gold mineralization in northern Saskatchewan using lithogeochemistry. The properties sa

    Jan 1, 1986

  • CIM
    Pumping Ores Up Vertical Shafts

    By Ellie Condolios

    Hydraulic hoisting offers a number ~f attractive features over conventional hoisting methods: small shaft space requirements; great flexibility of layout, including pick-up or delivery of the material

    Jan 1, 1963

  • CIM
    Environmentally Friendly Recycling Of Automotive Catalysts in a Closed Hydrometallurgical Loop

    By S. Steinlechner

    "Today the common recycling technologies of automotive catalysts are either energy intensive pyrometallurgical processes generating huge amounts of residues or hydrometallurgical ones which have to co

    Jan 1, 2014

  • CIM
    Grain Refining Aluminium Alloys by the Same-Alloy Rod

    By D. G. Eskin

    "It is well known that it takes some time for the solid phase to completely dissolve upon melting, especially inside the defects of insoluble particles, e.g. oxides. Until then the oxides remain activ

    Jan 1, 2018

  • CIM
    Pillar Blasting at the Murray Mine

    In April, 1961, a large pillar was removed by blasthole mining methods at Inco's Murray mine. More than half a million pounds of explosives were used to break 2,120,000 tons of ore in a single un

    Jan 1, 1963