Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Small-scale mining using the modular gold processing unit at the Granada mine, Rouyn-Noranda, Quebec (d2911615-1db3-4ddc-ae0e-f3be18f048cf)By P. Trudel, É. Cabot, L. Cabot
"A modular gold processing unit (MGPU) was designed, installed and operated over an eight-month period by RSW-Béroma at the Granada mine located near Rouyn-Noranda, Quebec. A description of the projec
Jan 1, 2003
-
The Gold Deposits of Nova Scotia: An Analysis of the History and Present Status and a Hypothesis Concerning the Structural Features of the Province in Relation to the Deposition of Gold.By Sir Stopford Brunton
Gold was first found in Nova Scotia about 1830-40, but its significance at that time was not appreciated. Probably the first discovery that resulted in any work was made by Lieut. C. !'Estrange,
Jan 1, 1926
-
Dust Collection Methods for Primary and Secondary Crushing (NOVEMBER 21, 1975 )By D. Ingram
"PRIMARY DUST COLLECTOR A. 42,000 CFM James Howden Fan Z-6 Size 3650 Fan Dia 40"" HP 75It was found that the fan was not large enough to remove the air that was displaced by the trucks dumping. So it
Jan 1, 1976
-
The rebirth of Corbinthe Byron Creek Collieries storyBy J. Aiello
"A brief history of previous mining activity on Coal Mountain, near Corbin, British Columbia, is followed by a description of the steps leading up to the resumption of mining in /974 by Byron Creek Co
Jan 1, 1980
-
A Novel Approach to Recover Precious Values from Low-Grade Canadian OresBy V. I. Lakshmanan, D. A. Mackie
"1. INTRODUCTIONIn the past two decades, low-grade gold and silver ore bodies in the United States have been exploited by heap leaching, primarily with sodium cyanide solutions. This method has proven
Jan 1, 1989
-
Challenges in moving from Ad-Hoc to Planned Mine Technology InnovationWhy Innovate in Mining? ?Obvious, right? ?Increase productivity and profitability ?Improve safety and ergonomics ?Improve our environmental record and eliminate liabilities ?Implement process c
May 1, 2006
-
Cyclone Modelling - Case StudiesBy R. N. Murarka
"Hydrocyclone modelling and selection procedure is illustrated. Computerized procedure for hydrocyclone cut size determination for grinding and non-grinding applications is described.A standard proced
Jan 1, 1992
-
White Pass and Yukon RouteBy C. J. Brown
"Access to the outside world is supplied by the Alaska Highway to continental Canada and the United States, the Haines Highway, and by the White Pass & Yukon Route to Skagway and Vancouver. Communitie
Jan 1, 1973
-
Distinguishing ore types at the Lac des Iles PGE-gold-copper-nickel mine, Ontario: Implications for resource modelling, mining and processingBy M. J. Michaud, M. J. Lavigne
"A cornerstone of any successful mining project is an understanding of the mineral assemblage and metal distribution comprising the deposit. Knowledge of the precise mineral/ metal zoning enables an o
Jan 1, 2003
-
Petrology of the Mechanic Settlement Pluton and Related Platinum-Group Element MineralizationBy A. Dogan Paktunc
Abstract - The Mechanic Settlement pluton is a small body of mafic and ultramafic rocks of tholeiitic affinity, occurring in the Late Neoproterozoic volcanosedimentary rocks of the Avalon terrane of t
Jan 1, 2000
-
Treatment of Non-Magnetics at FalconbridgeBy C. H. Dionne, J. A. Holmes, B. J. Huls
"Falconbridge Limited is presently developing flowsheet alternatives for implementation at the Strathcona Mill. The main thrust for change arises from the need to reject more pyrrhotite from the conce
Jan 1, 1991
-
Preparing a Long-Lasting Environmental Impact StatementBy Glen A. White
The level of impact and mitigating measures that are forecast in an environmental assessment (EA) for a new, or significantly modified, metallurgical processing facility or mine are taking on increasi
May 1, 2004
-
The Highmont Concentrator StartupBy R. S. Fukuhara, M. J. Allan
"Highmont, a wholly owned subsidiary of Teck Corporation, operates a 25,000 ton/day mine and concentrator located in the Highland Valley of British Columbia. Construction of the plant commenced in the
Jan 1, 1982
-
The Environmental Impact of Submarine Tailings Disposal at the Island Copper Mine on Vancouver Island: A Case History in Environmental PolicyBy Patrick Moore
In 1971 the government of British Columbia issued a permit for the Island Copper Mine to commence disposal of 33,000 tons per day of mine tailings into Rupert Inlet, a marine fjord on the northwest co
May 1, 2002
-
Nickel production from low-iron laterite ores: Process descriptionsBy R. A. Bergman
"Process descriptions are provided for the following ten plants that treat high-magnesia lateritic nickel ores (saprolite) by pyrometallurgical means: PT Aneka Tambang; Cerro Matoso S.A.; Falconbridge
Jan 1, 2003
-
The Report of the Alberta Coal Commission, 1925: A Critical Analysis and Some Constructive SuggestionsBy J. A. H. Church
The report is too voluminous to be considered in detail within the scope of a single paper, so I will confine my consideration of it to the broader aspects, leaving other members to deal with points o
Jan 1, 1926
-
Autogenous and Semiautogenous Mills 2010 Update (c8ce50b9-7ed1-4029-b5bf-b13ac92a9d7b)By Jr. Jones
This paper is derived from a document that compiles autogenous and semi-autogenous mill installations worldwide, through the end of 2010. Updates have been solicited from all major mill manufacturers
Jan 1, 2012
-
Geotechnical challenges at the Beal Mountain mine, MontanaBy D. Stone
"The Beal Mountain mine near Anaconda, Montana, is an interesting case history of a mine that has continued operations despite several large pit wall failures over a period of approximately 10 years.
Jan 1, 2002
-
Characterization of Reference Gold CatalystsBy Susumu Tsubota
Three types of reference gold catalysts, i.e., 3wt%Au/TiO2 (Au-Ti: Type A), and 0.3wt%Au/Fe2O3 on alumina beads (AUS: Type B), and 5wt%Au/Fe2O3 (Au-Fe: Type C), were produced in a test plant scale by
Oct 1, 2003
-
Dust Control at Granisle CopperBy L. W. Hamel
"DUST CONTROL - GRANISLE COPPER LIMITEDINTRODUCTIONGranisle. Copper Limited is located in the north-central region of the Province of British Columbia, approximately 200 road miles north-west of Princ
Jan 1, 1976