Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Controlled Blasting for Twin Tunnels with a Shallow Cover under an Operating Railway Line

    By G Gopinath, R Balachander, H S. Venkatesh

    This paper describes in detail the controlled blasting adopted and the measurements undertaken for the successful excavation of large twin tunnels under a shallow cover for a six-lane highway project

    Aug 24, 2015

  • AUSIMM
    Multielement Geochemical Reconnaissance For Uranium in the Palmyrides Region of Central Syria

    By Hale Y. M

    Multielement reconnaissance geochemistry coupled with ground scintillation gamma ray measurements has been used to investigate the dispersion patterns of uranium and other major and trace element

    Jan 1, 1988

  • AUSIMM
    Design considerations for an iron tailings filtration plant and their conveying and disposal systems

    By C Garrido, J Barrera, H Alvarez, L Perez, S Ramirez

    In recent years, there has had a greater recurrence of studies and projects that consider tailings filtration followed by dry stacking to reduce the consumption of fresh water, the space required for

    Nov 8, 2021

  • AUSIMM
    Comparison of Min/Max Autocorrelation Factors, Kriging, Co-kriging and Inverse Distance Block Totals – A Magnetite Hematite Case Study

    By D Kentwell

    For deposits where a full assay suite of elements/oxides is available and where several variables are critical to the evaluation of the deposit, it is desirable for the estimated block values of all e

    Jul 13, 2015

  • AUSIMM
    Improved Trigger Action Response Plan Development Based Upon Mine-specific Data

    By D Cliff, B Belle

    Trigger action response plans (TARPs) are inherent to managing multiple hazards such as high gas content with multiple coal seams, high spontaneous combustion propensity, heat and ventilation. TARPs a

    Aug 31, 2015

  • AUSIMM
    Reducing ventilation change downtime and increasing operational uptime

    By J A. Rowland

    When executing a ventilation change the mine ventilation circuit is in a state of flux throughout the entire change period with discrete mine areas both under ventilated and/or over ventilated during

    Oct 12, 2022

  • AUSIMM
    Alternative Access, Mining and Hoisting for Underground Deposits

    It is proposed to consider a new access, mining and hoisting system for underground deposits, as an alternative to the commonly used decline or vertical shaft access. The proposed system offers fundam

    Jan 1, 2000

  • AUSIMM
    Ventilation Planning Considerations when Dealing with Hot Groundwater

    By S Bluhm, L van den Berg

    In planning mine ventilation systems, heat issues are normally associated with deep-level mines where auto-compression and virgin rock temperatures play a major role. However, a number of mines suffer

    Aug 31, 2015

  • AUSIMM
    Light Airborne Platforms for Monitoring Mines and Minerals

    By C Cavern, G Jacobs, F Durufle, L Ameglio

    Airborne geophysics and geomatics is at a crossroads as to whether it remains a viable mapping tool, both technically and commercially, and broadens its potential for new applications (eg environmenta

    Nov 4, 2015

  • AUSIMM
    Tailings Dewatering, Dry Screening and Water Clarification for Reduced Water Usage

    By R Norris, M Dunne

    Substantial efforts by the industry, as well as by process and equipment designers, have resulted in many innovative developments that provide cost effective reductions in water usage. This paper show

    Jan 1, 2006

  • AUSIMM
    Unlocking the Value in Waste and Reducing Tailings – Magnetite Production at Ernest Henry Mining

    By J Siliézar

    The Ernest Henry Mine (EHM) is situated 38 km north-east of Cloncurry in the Mount Isa – Cloncurry mineral district of northwest Queensland. The EHM orebody is an iron oxide copper gold deposit with a

    Jul 11, 2011

  • AUSIMM
    Automated Production Data Collection and Reporting at a Large Open Pit Mine

    By T Mattiske

    The Fimiston Open Pit (commonly referred to as the æSuper PitÆ) is a part of the Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) operation in Kalgoorlie-Boulder. KCGM manages the Fimiston Open Pit,

    Jan 1, 2002

  • AUSIMM
    The Influence of Charge Distribution on the Grindability of the Blasted Material

    By J Seccatore, G Sadao, M Cardu, G De Tomi, L Finoti, F Galvão, J Romero Huerta, A Rezende, J Bettencourt

    In the mining industry, rock blasting can be considered as the first phase of comminution. The downstream phases of comminution are mechanical, and consist in consecutive stages of crushing and millin

    Aug 24, 2015

  • AUSIMM
    Setting Restoration Goals for Restoring Pit Lakes as Aquatic Ecosystems – A Case Study from Southwest Australia

    By E J. B van Etten

    Pit lakes may form when open cut mining leaves a pit void that then fills with ground and surface waters. This often replaces terrestrial ecosystems that existed prior to mining with an aquatic ecosys

    Oct 5, 2011

  • AUSIMM
    Technology and Changes in Mines Rescue

    As the mining industry looks to new technologies for a safe work environment and increased production rates, so should emergency response teams when dealing with organisational incidents. Implementati

    Jan 1, 2004

  • AUSIMM
    VHMS Mineralisation in NW Papua New Guinea

    By K Akiro

    Volcanogenic massive basemetal sulphide and gold mineralisation of predominantly low sulphidation style has been located within Lower Tertiary basaltic and felsic volcanic and sedimentary sequences at

    Jan 1, 1999

  • AUSIMM
    In-pit In Situ Recovery – a New Approach That May Allow for Increased Value Extraction before Pit Closure

    By D J. Robinson, L L. Kuhar

    "Regardless of orebody value, at some stage, the pit will reach a depth where the reward for mining wider and/or deeper is not justified by the anticipated returns. ‘Last-blast’ strategies may help to

    Nov 15, 2016

  • AUSIMM
    The Composition of the Peko Copper Orebody, Tennant Creek

    The Peko copper orebody is associated with a body of magnetite rock which it has partly replaced. The primary ore averages about 9 per cent. copper and 4 dwt. gold per ton and locally IS much richer.

    Jan 1, 1955

  • AUSIMM
    Transition of mechanical cooling refrigerants

    By T Roberts

    The transition of mechanical cooling refrigerants from their inception in the 1800s through to the current day has been driven by several factors. Original refrigerants such as sulfur and carbon dioxi

    Oct 12, 2022

  • AUSIMM
    Geology, Mineralisation and Potential of the Clogau St DavidÆs Mine, Dolgellau Gold-Belt, Gwynedd, Wales

    By I M. Platten, S C. Dominy

    The Clogau St DavidÆs gold mine has a recorded production of around 81 000 oz Au and it is the largest mine in the Dolgellau gold-belt and BritainÆs most prolific historical producer. The original min

    Mar 26, 2012