Search Documents

  • NIOSH
    RI 3031 Acrolein as a Warning Agent for Detecting Leakage of Methyl Chloride from a Multifle Refrigeration System

    By H. H. Schrenk, W. P. Yant, F. A. Patty

    "INTRODUCTION In accordance with the outline of investigation described in a previous report 5 of the Bureau of Mines dealing with the use of acrolein for detecting leakage of methyl chloride from uni

    Sep 1, 1930

  • SAIMM
    Use a Can solve SO2 scrubbing system to better link your batch-operated furnace with its by-product sulphuric acid plant - Synopsis

    By P. Roy

    Smelting or converting of sulphide concentrates and mattes in a batch operation presents a challenge when directing the off- gas to a conventional acid plant. The Hindustan Zinc Ltd. (a division of th

    Jan 1, 2007

  • DFI
    Evaluating Degree of Consolidation of Soft Soil by Using Asaoka, Hyperbolic and Back Analysis Method

    By Aminul Islam, Vinay M. Kumar

    "About 100 Hectares of land reclamation over the very soft to soft marine clay at Uran Creek in Maharashtra is planned. The depth of marine clay varies from 10m to 24m as observed from the geotechnica

    Jan 1, 2017

  • SAIMM
    Investigating continuous time open pit dynamics - Synopsis

    Current mine production planning, scheduling, and allocation of resources are based on mathematical programming models. In practice, the optimized solution cannot be attained without examining all pos

    Jan 1, 2008

  • NIOSH
    OFR-2-72 Program Of Acoustic Research For Underground Coal Mining Operations

    By Damon C. Gray

    This report contains a recommended program of acoustic research to be conducted by the U. S. Bureau of Mines. The program is directed toward the abatement and control of machinery noise in underground

    Jan 1, 1971

  • CIM
    Kansanshi Copper Smelter: The First Four Years of Operation

    By S. Hunt, D. de Vries

    Kansanshi Copper Smelter began operation in March 2015. The smelter features a single Isasmelt furnace for smelting, one 6-in-line electric furnace for matte-settling and slag-cleaning duties, four Pe

    Jan 1, 2019

  • AUSIMM
    Mine Rehabilitation for Sustainable Landcare: Cost-Effective Strategies

    By R Simcock

    Why Rehabilitate? Legislative Requirement Land rehabilitation is a condition of resource consents for mining. Clause 17 (1) of the Resource Management Act 1991 (duty to avoid, remedy, or mitigate adve

    Jan 1, 1997

  • AUSIMM
    Geophysical Characteristics, Deep Structure, Magmatism and Metallogeny of the Pacific Belt

    By L A. Maslov

    We have considered the following characteristics of the crust and upper mantle of the Pacific Belt: seismic wave velocity anomalies, mechanical stress and shear deformation rate fields, heat flow and

    Jan 1, 1995

  • SAIMM
    Geotechnical Considerations In The Design Of The MOCB Mining Method At Konkola No.3 Shaft.

    By M Lipalile, A B. Tunono, A W. Naismith

    Konkola No 3 shaft experienced severe mining induced stress and time related deterioration in ground conditions in an area where an over-cut and bench (OCB) mining method was used to extract a shallow

    Jan 1, 2005

  • SME
    Monitoring Acidophilic Microbes With Real-Time Polymerase Chain Reaction (PCR) Assays - Preprint 09-014

    By F. F. Roberto

    Many techniques that are used to characterize and monitor microbial populations associated with sulfide mineral bioleaching require the cultivation of the organisms on solid or liquid media. Chemolit

    Jan 1, 2009

  • SAIMM
    Key Performance Indicators ? A Tool to Assess ICT Applications in Underground Coal Mines

    By C. Dauber

    Implementing new technologies in industrial operations entails the challenge of measuring the improvements gained by the applied technology. Nevertheless, it is absolutely essential to assess the tech

    Jan 1, 2014

  • CIM
    Application Practice of Bottom Blowing Continuous Converting to Replace Copper P-S Converter

    By Hongfei Li, JianLong Wang

    This paper introduces the technical characteristics, transformation scheme and production practice of the project in which Copper P-S Converter was replaced by Bottom Blowing Continuous converting for

    Jan 1, 2019

  • SME-ICGCM
    Application of Electrohydrodynamic Method and High-Pressure Water Jets as Non-Blasting Alternative of Rock Breaking and Splitting in Open Pits

    By Krzysztof Kotwica

    The steady demand for rock materials leads not only to on increase in mining but to the need for decreasing the loss of material in the process of exploitation as well. It brings about an increase in

    Jan 1, 2006

  • SAIMM
    A Heuristic Sublevel Stope Optimizer With Multiple Raises

    By X. Bai

    A new heuristic sublevel mining stope optimizer is presented. The optimizer seeks the best locations and lengths of a series of vertical raises that, together with the blocks linked to each raise, def

    Jan 1, 2014

  • SME
    Robot-Human Control Interactions In Mining Operations (0b1217a6-1d54-43fe-b0e6-c8bd395d732a)

    By G. Danko, R. Tiwari, J. Knowles

    Many excavation and loading tasks require equipment operators to simultaneously coordinate the motion of multiple machine links, in order to achieve complex tool trajectories. Efficiency, ore selecti

    Jan 1, 2006

  • TMS
    Onset of Void Coalescence Studied by X-Ray Computed Tomography

    By Akihide Hosokawa

    The void growth and coalescence in model materials involving a pre-existing three dimensional void array (i.e. multiple layers of a void array) was studied by X-ray computed tomography (XCT) coupled w

    Jan 1, 2010

  • AUSIMM
    Stemming of Blastholes in Mining Excavations

    By Lamont G

    The significance of blasthole stemming in determining blasting efficiency has been extensively studied for small diameter holes using gelignite explosives. Recent developments in blasting technology w

    Jan 1, 1979

  • CIM
    Performance Enhancement of Semi-Autogenous Grinding Mills Through the Use of Instrumentation Based on Acoustic Signals

    By David G. Almond

    "Economies of scale and the variable characteristics of many large ore deposits have resulted in grinding installations having large SAG mills fitted with variable speed drives. Problems associated wi

    Jan 1, 2005

  • AUSIMM
    Stacking and Reclaiming Facilities at South Blackwater Coal Mine, Queensland

    By Hoskings R

    Conceptual studies of the run of mine stockpiling and reclaiming requirements at Thiess Bros Pty Ltd South Blackwater coal mine commenced in 1975.Final selection of equipment was made in 1978 and the

    Jan 1, 1981

  • AUSIMM
    Active and Extinct Geothermal Systems - A Summary

    Active geothermal fields show many of the characteristics seen in hydrothermal ore deposits but there are important differences as well. There are, for example, many differences in geology and chemist

    Jan 1, 1986