Vibratory Driver/Extractors Do More Than Drive Sheet Piles - SummaryBy John L. White
Vibratory driver/extractors do more than drive and extract sheet piles. I would say more than sixty percent (60%) of the time, vibratory pile driver/extractors are engaged in work that has nothing to
Jan 1, 1997
-
Beneficios del uso de "simuladores" en la mejor continua de las operaciones metalúrgicasBy Francisco Anglade
Dado que la simulación digital es una herramienta auxilar para los ingenieros de procesos -en tanto evalúa la factibilidad de un flowsheet propuesto y predice el efecto de una modificación para un fl
Sep 9, 2007
-
New World Class Industrial Clay DepositsBy H. H. Murray
Recently developed clay deposits that will impact regional and world markets are described. These deposits, their location, geology, and physical properties are delineated. Kaolins from the State of P
Jan 1, 1999
-
Mechanical Mining: Challenges and DirectionsBy Richard E. Gertsch
Mechanical mining holds great promise for the mining industry. Realizing this promise depends on developing the tools needed to mechanize a mining operation with a reasonable expectation of success.
Jan 1, 1994
-
Estimated Sound Power Radiated By Surfaces On A Continuous Miner Tail Section Using Vibration MeasurementsBy David S. Yantek
Miners in underground coal mines experience prolonged exposure to high noise levels, often with A-weighted sound levels in excess of 90 dB. Field tests have shown that the continuous miner conveyor i
-
OFR-112(1)-82 Safety Analysis Of The Impactor Shaft Sinking SystemBy C. A. Geffen
This report, sponsored by the U. S. Bureau of Mines, presents the results of an examination of the safety of the impactor shaft sinking system in comparison to conventional shaft sinking technology. D
Jan 1, 1982
-
Establishing Metal Levels in the Ohinemuri RiverBy W Donovan
Concern exists about the potential release of metals from the proposed mining operation at Martha Hill to the Ohinemuri River. Speculation on possible impacts is fuelled by the dearth of published dat
Jan 1, 1986
-
Application of advanced blasting technologies for large scale de-stress blasts at Brunswick mineBy S. Chung
Mining in highly stressed ground conditions has been an increasing challenge at the Brunswick mine. Over the past 30 years, two large regional pillars were established on the 1000 m Level to support t
Jan 1, 2005
-
New Opportunities ? Exhaustive Monitored Copper Coolers For Submerged Arc Furnaces (0496ee01-222b-4cf7-b688-79441e60e149)By M. Hopf
The use of water-cooled copper components as sidewall elements of submerged arc furnaces and other pyrometallurgical applications has become increasingly common. The high cooling efficiency of copper
Jan 1, 2006
-
Tunneling Through Faults In Volcanic Rocks For The Construction Of The La Joya Project (Costa Rica)By R. Grandori, L. Pellegrini
The construction of the La Joya hydropower plant (Costa Rica) was awarded by the Spanish power company, Union Fenosa, to the Italian Joint Venture formed by the companies SELI SpA and Ghella SpA. T
Jan 1, 2007
-
Semi-Autogenous Grinding (SAG) Mill Liner Design And DevelopmentBy D. Royston
SAG mill liner development draws primarily on practical experience from SAG milling operations supported by computer-based modeling of charge motion in SAG mills and on established good design practic
Jan 1, 2007
-
Raising The Bar Of Ventilation For Large-Opening Stone MinesBy R. H. Grau, S. B. Robertson, R. B. Krog, T. P. Mucho
Due to the difficulties of ventilating large opening stone mines, the effective dilution of diesel particulate matter and noxious gases has often been problematic. Since stone mines have large opening
-
Drill and Blast Instrumentation for Troubleshooting Underground Up-Hole StopingBy Braden Lusk, Tristan Worsey, Nathan Rouse, Kyle Hall
Loading explosives up hole has challenges that are typically not seen in down hole explosive loading. Most explosives applications are not up hole. Lack of experience and technology can cause signific
Jan 1, 2018
-
Analyzing and Interpreting Blast Vibration Data Using New Windows-Based SoftwareBy Randall M. Wheeler
Using Computer software to analyze and interpret blast vibration effects has never been so practical. Fully digital seismographs and powerful desktop and portable computers have led to the development
Jan 1, 1994
-
The Installation and Operation of Heap Leaching Test FacilitiesBy J. Maheu
Heap leaching is an old technique for the recovery of copper, but a fairly new technique for the recovery of gold.The paper outlines the equipment required for the establishment of heap leaching test
Jan 1, 1982
-
Storage and Time - A Paradigm for Aquifer Pressure Management Beneath Open Cut MinesBy S Yuen, T Rana, S Khan
Many open pit mines require dewatering or need aquifer depressurisation systems to manage mine water inflow and/or mine floor stability. In many instances these mining operations impact on regional gr
Jan 1, 2009
-
A New Short- And Medium-Term Production Planning Tool - Minesight® Schedule Optimizer (MSSO) - Preprint 09-079The MineSight Schedule Optimizer (MSSO) is a new production scheduling tool developed by Mintec, Inc. using mixed integer linear programming (MILP) techniques. This tool was developed to solve the sho
Jan 1, 2009
-
Flotation Kinetic Studies -Going from Laboratory to the PlantBy Richard Klimpel
"Over the last 15 years, there has been a number of plant scale sulfide mineral flotation tests organized by this author specifically aimed at understanding how flotation rate varies with reagent type
Jan 1, 1997
-
Professional Divisions (9585aa83-04df-4ba3-9ce6-868b5f673db3)[Chairman ZAY JEFFRIES, Vice-chairman S. SKOWRONSKI, Chairman WILLIAM M, CORSE, Secretary Executive Committee J. R. FREEMAN, JR., Local Section G. E. JOHNSON R. S. ARCHER, Non-ferrous Data
Jan 1, 1928
-
Pit Optimization on Clustered Realizations: Identifying Functional Scenarios Mining, Metallurgy and ExplorationBy Tyler Acorn, Brandon Wilson, Jeff Boisvert
Scenario-level uncertainty is a representation of large-scale differences encountered when considering ultimate mining pits optimized over various subsets of stochastic realizations. Accounting for sc