Search Documents

  • NIOSH
    Using Proximate Analysis to Characterize Airborne Dust Generation from Bituminous Coals

    By Steven J. Page, John A. Organiscak

    The amount of airborne respirable dust generated from break- age of different coals varies widely. This research was conducted to identify the facets of airborne respirable dust liberation from the co

  • ISEE
    Presplitting Techniques for Conventional, Air Deck and Dimension Stone Applications

    "The objective in controlled blasting is to reduce overbreak to control the final pit wall slope, shaft, drift ditch, bench, etc. to the final planned excavation limit. The six main types of controlle

    Jan 1, 1994

  • SAIMM
    A Case Study On The Operation Of A Flottweg Tricanter® Centrifuge For Solvent-Extraction Crud Treatment At Bwana Mkubwa, Ndola, Zambia

    By Gift Chisakuta, Bravo Mbao, Nils Schwarz, Angus Feather, Anthony Mukutuma

    Bwana Mkubwa is a 50 000 tons per annum copper cathode producer, owned by First Quantum Minerals and located in Ndola, on the Zambian Copperbelt. The Bwana Mkubwa solvent-extraction circuit was starte

    Jan 1, 2007

  • CIM
    Chipewyan Granite - a Building-Stone Prospect in Alberta

    By John D. Godfrey

    Geological mapping on the Canadian Shield in northeastern Alberta outlined severalgranitoid rock massespotentially suitable as building stone. A particularly attractive prospect, the Chipewyan Red Gra

    Jan 1, 1979

  • SME
    Case Study: Correcting Mechanical And Control Problems On Essroc?s Multi-Drive Station Horizontally Curved Conveyor ? Introduction

    By A. Jennings

    [ ] In November 2005, Essroc Cement, part of the Italcementi Group, commissioned a long overland conveyor at their Nazareth plant in Pennsylvania. This conveyor, tagged CV-105, was designed to tran

    Jan 1, 2012

  • CIM
    Minimum variance or maximum profitability?

    By R. Mohan Srivastava

    "The goal of estimation is considered in the light of decision analysis. A simple example reveals the essential elements of decision-making in the face of uncertainty. A second example shows that thes

    Jan 1, 1987

  • NIOSH
    RI 7576 Structural Deformation Of Green River Oil Shale As It Relates To In Situ Retorting

    By P. R. Tisot

    Structural response and/or deformation was determined for each of four different grade Green River oil shales (27.0-, 34.5-, 45.5-, and 63.5-gal/ton) as they were heated in an inert atmosphere, under

    Jan 1, 1971

  • SME
    Mine Power Systems

    By Christopher J. Bise

    INTRODUCTION A mine's power system represents the driving force behind all of the extraction and auxiliary operations, because the production and transportation of mined material and the oper

    Jan 1, 1986

  • CIM
    Footwall anchoring at Smoky River Coal Limited

    By Peter L. Sheehan, David A. Fawcett, Dennis C. Martin

    "Smoky River Coal Limited has successfully completed a major program involving the pattern rock anchoring of a high, steeply dipping footwall slope. The slope dips at approximately 65 to 70 degrees to

    Jan 1, 1988

  • NIOSH
    Back Injury Control Measures For Manual Lifting And Seat Design

    By S. Gallagher, A. G. Mayton

    Back injuries account for a high proportion of lost workdays in the mining industry and are a leading cause of disability in mine workers. Two risk factors for low back injuries are manual lifting and

  • NIOSH
    RI 7202 Comparison Of Trip Lights And Reflectors

    By R. H. Oitto

    To determine whether reflectors could substitute for the trip lights referred to in the Federal Mine Safety Code, the Bureau of Mines studied trip safety devices under simulated haulageway conditions.

    Jan 1, 1968

  • SME
    Size Reduction/Mineral Liberation Simulation For A Magnetic Taconite Concentrator (451168a3-7660-4e82-9e41-cf07bc59aaec)

    By R. L. Wiegel

    Several mineral process modeling and simulation packages are currently available for use in evaluating the performance of alternative process flowschemes. A critical link that has been missing from t

    Jan 1, 2002

  • SME
    Face Ventilation on a Bleederless Longwall Panel Mining, Metallurgy and Exploration

    By S. J. Schatzel, J. D. Addis, V. Gangrade, L. L. Chasko, C. A. Hollerich

    A ventilation study using tracer gas was conducted at a western US coal mine. The objective of the study was to evaluate the movement of longwall face air exchanges between the face and worked-out are

  • DFI
    The Reliability Of Conventional Design Methods For Driven Piles In Sand - Synopsis

    By Kenneth Gavin

    The accurate prediction of the shaft capacity of drives piles in sand continues to present problems for foundation designers. Research in this field has been carried out for many years and has yielded

    Jan 1, 1996

  • SME
    Geotechnical Considerations No. 7 Subway Line Extension Project in New York City

    By P. K. Das, S. K. Singh, C. C. Chang, E. C. Wang, R. B. Roberts

    As part of the New York City’s redevelopment of the far west side of mid-town Manhattan, this project will add 1.5 miles of twin bored tunnel to No. 7 Subway Line. The proposed alignment extending fro

    Jan 1, 2005

  • NIOSH
    RI 3254 The National Safety Competition of 1933

    By W. W. Adams

    "The ninth yearly National Safety Competition covering the calendar year 1933, conducted by the United States Bureau of Mines, w participated in by 332 mines and quarries situated in 35 States. Enroll

    Jul 1, 1934

  • AUSIMM
    Calibration of a Frantz Isodynamic Separator and its Application to Mineral Seperation

    A calibration of the Frantz isodynamic magnetic separator relates the current in the electromagnet and the transverse slope of the chute to the specific susceptibility at which separation is being eff

    Jan 1, 1957

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • AUSIMM
    Taharoa Minesite Plant Relocation

    By P Rowe

    New Zealand Steel's Taharoa titano-magnetite mine, south of Auckland, set two national load records when it transported around 2000 t of mining equipment three kilometres overland on time, under

    Jan 1, 2001

  • ISEE
    Journal: Musings of a Safety Philosopher Relating to Blasting Safety

    By Ralph Dawson

    The following additions to SLP-4 “ALWAYS AND NEVERS” have been approved by the Board of Governors since the last printing 6/97 and will be included in the next printing soon. They are also included in

    Jan 1, 2001