Search Documents

  • CIM
    Characterising Ore Micro-Texture Using X-Ray Micro-Tomography

    By X. Yuan

    "The processing behaviours of ores such as their liberation characteristics in comminution and their response in separation processes are affected by their mineralogical characteristics. Key ore chara

    Jan 1, 2012

  • CIM
    Capital Cost Estimating for Mineral Processing Plants

    By R. J. Balfour, T. L. Papucciyan

    "INTRODUCTIONCapital Cost considerations are basic to feasibility in the achievement of success for Mineral Processing Projects as much as or more than in many other industries. Capital cost is an imp

    Jan 1, 1972

  • SAIMM
    1.1 Kenyon

    Standards And Laboratory Monitoring In Gold Assay Key Components Of Best Practice

    Jan 1, 2005

  • AUSIMM
    Presidential Address, 1959

    A President, soon after he is appointed, sees looming ahead of him the Presidential Address; and in something approaching despair wonders what he can possibly talk about which might hold the interest

    Jan 1, 1959

  • CIM
    Evidence of an iron-gold corrosion cell during the Zadra pressure elution of loaded carbon

    By C. Taschereau, G. A. Vickell, A. R. Laplante

    Evidence in support of an iron-gold corrosion cell during the high-temperature/highpressure elution of loaded carbon is presented herein including, but not limited to, its discovery, mode of genesis,

    Jan 1, 2006

  • SME
    Mining Heritage: Preservation And Sustainable Development Of An Outstanding Universal Value

    By J. Kretschmann

    Mining heritage can be of outstanding value for many regions around the world, because mining has been done for thousands of years for the benefit of mankind and its development. This paper presents a

    Feb 27, 2013

  • SME
    Tunneling for the Eastlink Project, Melbourne, Australia

    By Peter Campi, Harry R. Asche, Ian P. Callow, Edmund G. Taylor, P. Scott Smith

    The US$1,850 million EastLink project is a 39km tollway and includes twin 3-lane,1.5km long, undrained driven tunnels. The hard rock tunnels are being built to avoid passing the motorway through the M

    Jan 1, 2007

  • CIM
    Development of a 3D Modeling System For the Monitoring of the Daniel-Johnson Dam

    By Vincent Roy

    Numerous on going activities at the Daniel-Johnson Dam : ? Surveillance / monitoring ; ? Structural investigations & evaluation ; ? Injection work ; ? Crack mapping ; ? Instrumentation management

    Aug 1, 2013

  • CIM
    Hydro Cyclone Operations under Unusual Conditions

    By L. R. Plitt, A. J. Neale, B. C. Flintoff

    "INTRODUCTIONThis is not a technical paper in the normal sense. It is an informal document which is intended to share the results of some recent cyclone research with our colleagues both in operations

    Jan 1, 1986

  • SME
    Role Of The Mill In A Competitive Minerals Company - Is Low Cost Enough?

    By Bruce Cavender

    Historically, the processing function has been regarded as efficiently managed as long as production costs were kept low, recovery was adequate and sufficient plant capacity was avail-able. In this pa

    Jan 1, 2008

  • AUSIMM
    The Washing of Calcine to Remove Soluble Salts at Great Boulder Gold Mines Limited (add9b255-f732-4157-b8bc-50ff50a1fd29)

    At Great Boulder Gold Mines Ltd. a number of attempts were made to remove water soluble copper and iron salts from calcined pyritic concentrates but variou~ problems arose and the methods were abandon

    Jan 1, 1964

  • CIM
    Grinding Calculations Related to the Application of Large Rod and Ball Mills

    By C. A. Rowland Jr

    "I. INTRODUCTIONFred C. Bond's ""Third Theory of Comminution"" (1) was published in 1952. The mathematical statement of the Third Theory is the well-known Bond Formula:where W - Kw H per short tonWl -

    Jan 1, 1972

  • NIOSH
    RI 9463 - Thermal Modeling of Portable Power Cables

    By P. Cole Gregory, Michael R. Yenchek, John C. Edwards

    The U.S. Bureau of Mines investigated the performance of portable power cables under transient conditions. This research had a twofold purpose: (1) to define the thermal characteristics of electricall

    Jan 1, 1993

  • ISEE
    Response of Manufactured Houses to Blast Vibrations

    By Michael Mann

    Two house trailers and a modem modular house, all pillar-supported with cantilevered perimeters, were monitored for structural response to vibrations from surface coal mine blasts. Due to the large bl

    Jan 1, 2000

  • SAIMM
    Optimization of shuttle car utilization atan underground coal mine

    By P. R. Segopolo

    "The purpose of the project is to convert current shuttle car utilization on an underground coal mine to best practice by focusing on change-out points and tramming routes, which have a major influenc

    Jan 1, 2015

  • CIM
    Long-term planning at Raglan (b8ce356e-c666-4ad8-a03a-11ba76659079)

    By L. W. T. Weitzel

    "This paper reviews the Falconbridge- SMRQ’s Raglan project in northern Quebec and the process that was used in developing its current long-term mine plan. Challenges were many and not only limited to

    Jan 1, 2003

  • SME
    Reproducibility Of Bond Work Index With Different Standard Ball Mills

    By P. C. Fletcher, E. Kaya

    The Bond grindability testing procedure has been standardized to measure the same grindability values, i.e. Bond work index (BWi), for the same ore when tests are performed in different laboratories o

    Jan 1, 2002

  • SAIMM
    Design and Positive Financial Impact of Crush Pillars on Mechanized Deep-Level Mining at South Deep Gold Mine

    By B. P. Watson

    Crush pillars have been incorporated into a mechanized, low-profile trackless system at South Deep Gold Mine. These pillars had to be designed to fail near the face and to ensure that pillar failure i

    Jan 1, 2014

  • CIM
    Using 3D Computer Simulation to Improve Construction Project Planning

    By Patrick Cloutier

    Presentation objectives ? Introduce discrete-event 3D computer simulation as a tool to design, improve and optimize construction projects: ? Describe a real typical construction project planning i

    Aug 1, 2013

  • AUSIMM
    The Dissolution of Gold in Cyanide Solutions-An Electrochemical Study

    By Koch D. F A

    An electrochemical study of the dissolution of gold in aerated cyanide solution shows that the dissolution rate is determined by the nature of the surface. A passive film (probably a basic cyanide) fo

    Jan 1, 1964