Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Numerical Model Calibration for Simulating Coal Pillars, Gob and Overburden Response

    By Essie Esterhuizen, Michael M. Murphy, Chris Mark

    "The design of underground coal mines requires a clear understanding of the overburden response, the loading of pillars, the loading of the gob, the pillar failure process, and the ultimate load carri

    Jan 1, 2010

  • SME-ICGCM
    Research on Coal and Gas Outburst Dynamic System

    By Chaojun Fan, Du Wenzhang, Sheng Li, Hong-Hong Shi

    "Coal and gas outburst is an extremely complex dynamic disaster in coal mine production process which will damage casualties, equipment facilities and disorder the ventilation system by suddenly eject

    Jan 1, 2016

  • SME-ICGCM
    Deign of Support System for Mining Tunnels in Carboniferous Rock Conditions

    By B. N. Whittaker

    The paper briefly reviews the type of support and stability problems encountered in mining tunnels in U.K. Carboniferous rock conditions, particularly the Coal Measures where almost all such tunnels a

    Jan 1, 1987

  • SME-ICGCM
    Roadway Roof Support Design in Critical Areas at Anglo American Metallurgical Coal's Underground Operations

    By Ismet Canbulat

    "In order to ensure the stability of roadways, Anglo American Metallurgical Coal (AAMC) has developed a roof support design methodology that integrates analytical, numerical and empirical modelling. T

    Jan 1, 2010

  • SME-ICGCM
    Applications of ARMPS (Version 6) to Practical Pillar Design Problems

    By Christopher Mark

    The Analysis of Retreat Mining Pillar Stability (ARMPS) program has been used to evaluate room and pillar retreat mining layouts since it was first released in the mid 1990s. After the Crandall Canyon

    Jan 1, 2011

  • SME-ICGCM
    The Design and Management of Wide Roadways in Australian Coal Mines

    By Rob Thomas

    "In Australia, a wide roadway is commonly defined as any roadway that is driven to a width greater than 5.5 m (18 ft). These roadways are typically required to enable the installation of longwall equi

    Jan 1, 2010

  • SME-ICGCM
    Quantification of Ventilation Enhancement Using the Eye Can Roof Support

    By Mark F. Sindelar, Yi Luo, Hua Jiang, Michael T. Shook

    "Convergence of roof and floor in underground mine openings is a common occurrence. This convergence not only adversely affects the ability of workers, equipment and supplies to travel through the min

    Jan 1, 2016

  • SME-ICGCM
    Shear Strength Characteristics of Soft Rock Joints Based on Constant Normal Stiffness Testing

    Large-scale shear apparatus is designed to investigate the shear hehaviour of simulated soft rock joints under constant normal stifmess condition. Regular saw-teeth profiles having inclinations betwee

    Jan 1, 1997

  • SME-ICGCM
    FlexKnot: An Innovation in Roof and Rib Surface Control

    By Anand Bhagwat

    Surface control can prevent the falls of ground between primary roof support systems and rib support. Using existing industrial products, and adopting them for mining applications, has historically at

    Jan 1, 2014

  • SME-ICGCM
    Applications Of Reflection Seismics To Mapping Coal Seam Structure And Discontinuities

    By T. L. Dobecki

    As a means of demonstrating the effectiveness of reflection seismology in determining continuity of coal seams, three U. S. field projects are reviewed. The three projects involve coals of varied thic

    Jan 1, 1981

  • SME-ICGCM
    CBM Extraction Engineering Challenges and the Technology of Mining the Upper Protective Seam in the Daxing Mine, China

    By Yuanping Cheng, Jingyu Jiang, Qiang Zhang

    "With the increase of mining depths, deep-seated coal seams face threats from high ground stresses, high gas pressures, high gas content, and low seam permeability, which significantly increase the li

    Jan 1, 2017

  • SME-ICGCM
    Load And Deflection Response Of Ventilation Stoppings To Longwall Abutment Loading - A Case Study (49571726-6a2d-49b8-8ef0-957c4421195c)

    By David C. Oyler

    Few studies have specifically measured and documented the large-scale loading behavior and durability of ventilation stoppings to mining induced movements, particularly from longwalls. Ventilation sto

    Jan 1, 2001

  • SME-ICGCM
    Fundamental Principles of an Effective Reinforcing Roof Bolting Strategy in Horizontally Layered Roof Strata and Areas of Potential Improvement

    By Martin McKinnon, Guy Reed, Russell Frith

    "It is arguable that the development of reinforcing roof bolting systems has largely stagnated in recent times, primarily due to the prevailing industry view that few, if any, further improvements can

    Jan 1, 2017

  • SME-ICGCM
    Geotechnical Planning and Development of the BHP Minerals San Juan Pilot Mine, Waterflow, NM

    By P. E. Christensen

    Due to ever-increasing stripping ratios associated with the No. 8 Seam at the San Juan Mine surface operation, BHP Minerals decided to implement longwall mining for the extraction of the substantial f

    Jan 1, 1998

  • SME-ICGCM
    Geophysics For The Detection Of Abandoned Mine Workings

    By Christopher Phillips

    In light of recent events in the mining industry, there has been an increasing demand for technology to detect underground voids and abandoned mine workings. This paper summarizes the use of geophysic

    Jan 1, 2003

  • SME-ICGCM
    User-Friendly Finite Element Design of Main Entries, Barrier Pillars, and Bleeder Entries

    By William G. Pariseau, Mark K. Larson, Douglas R. Tesarik, Heather E. Lawson

    "This contribution describes development and application of a user-friendly finite element program, UT3PC, to address three important problems in underground coal mine design: (1) safety of main entri

    Jan 1, 2017

  • SME-ICGCM
    A Case Study of a Low Overburden Longwall Recovery with Pre?Developed Recovery Entries

    By John C. Stankus

    The 3 Right pre-developed longwall recovery entry at Signal Peak Energy?s Bull Mountain No. 1 mine was designed to prevent the abnormal roof conditions encountered in its firsttwo recovery entries. Un

    Jan 1, 2014

  • SME-ICGCM
    Design Optimization of Longwall Chain Pillars

    By Behdeen Oraee, Amirhossein Bangian, Kazem Oraee

    "Determination of the optimum design of chain pillars has a significant effect on the economics and safety of longwall operations. Most pillar design formulae are based on empirical methods and supple

    Jan 1, 2010

  • SME-ICGCM
    Geotechnical Considerations in Highwall Mining Applications in Indonesia

    By Takashi Sasaoka, Hiroshi Takamoto, Kikuo Matsui, Hideki Shimada

    "Indonesia is the second largest coal exporter to Japan. Almost all the coal is produced from open cut mines. However, a great deal of coal is left in the highwalls of the mined-out pits. The use of h

    Jan 1, 2010

  • SME-ICGCM
    Cable Bolts - An Effective Primary Support System

    By Stephen C. Tadolini, John P. McDonnell

    "High-strength cable bolts have been used for ground support in underground coal mines for many years. Cable bolts are routinely used as secondary ground support in numerous longwall gateroad support

    Jan 1, 2010