Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Production Scheduling At LKAB’s Kiruna Mine Using Mixed Integer Programming
By M. Kuchta, A. Newman
LKAB’s Kiruna Mine, located in northern Sweden, produces about 24 Mton of iron ore yearly using sublevel caving. For efficiency, the mine must deliver planned quantities of three ore products. We use
Jan 1, 2002
-
Structural Geologic Mapping to Identify Controls on Ground Instability in Surface and Underground Limestone Mines
By S. E. Phillipson
During the course of evaluations by the Mine Safety and Health Administration’s Roof Control Division, the controls on ground instability were investigated at surface and underground limestone mines t
Jan 1, 2006
-
Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, California
By Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan
Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E
Jan 1, 2007
-
‘Here’s to Low-Grade Ore and Plenty of it,’ the Hearsts and the Homestake Mine
By Duane A. Smith
They are gone now. Gone like that long ago generation that gave them birth. The Homestake Mine, nestled in the northern Black Hills, closed in 2001 after 125 years, the longest run of any major Amer
Jan 1, 2003
-
A Case History Of Aggregate Resource Development On Allotted Indian Lands
By D. R. Hack
Increased consumption of concrete in the Pacific Northwest has pushed aggregate resource development pressure from urban areas west of the Cascade Range to rural areas east of the Cascades. Some recen
Jan 1, 2002
-
Recent Developments In Dense Medium Cyclone Circuit Design – Preprint
By L. Watters, R. Terry, D. Placha
Dense medium cyclones are the preferred means for cleaning 1/2 in. x 14Mesh to 28Mesh (12.7 mm x 1.0 mm to 0.6 mm) raw coal and are becoming a common choice for cleaning raw coal from a nominal top si
Feb 24, 1997
-
Underground Mine Air and Strata Temperature Change Due to the Use of Refuge Alternatives
By M. A. Reyes, L. Yan
Heat and humidity buildup within refuge alternatives (RAs) may expose occupants to physiological hazards such as heat stress. The Mine Safety and Health Administration (MSHA) regulations require RAs i
Nov 22, 2019
-
Correct Identification Of Chrysotile Asbestos In Ores
By Allison
During the 1980’s, laboratories opened throughout the United States to serve the analysis needs of a rapidly growing asbestos abatement industry. The samples analyzed were either collected during the
Jan 1, 2005
-
Rehabilitation of New Croton Aqueduct Shafts
By W. James Marold
The New Croton Aqueduct (NCA) was the first major water supply tunnel for New York City. The 50-km (31-mi) long tunnel has 33 open shafts 6 m (20 ft) to 121 m (397 ft) deep. The tunnel and shafts are
Jan 1, 2008
-
Problems Encountered on the Upper Reach of the Northeast Interceptor Sewer Project
By Rajni Patel, John McDonald, Steve Dubnewych, Michael McKenna
The Upper Reach segment of the Northeast Interceptor Sewer (NEIS) is a3.2-km-long tunnel excavated in interbedded marine sedimentary deposits with approximately 40 m of cover. The tunnel was initially
Jan 1, 2005
-
Cable Shovel Dynamic Modeling For Determining Component Cycle Stress - Preprint 09-121
This paper presents a virtual prototype for the stress analysis of cable shovel components based on combination of flexible and rigid body approach. The general mechanical system of the cable shovel i
Jan 1, 2009
-
Probabilistic Approach To Project-Specific Political Risk Analysis For Mineral Projects
By S. Dessureault, Z. Gavelan
As globalization continues, sustainability and social responsibility has become essential in foreign mining investment. However this global trend and the increasing acceptability toward the globalizat
Jan 1, 2004
-
Application Of Impact Resistant Steel Sets For Underground Roof Fall Rehabilitation
By J. C. Stankus
To protect mine personnel and moving equipment at underground roof fall areas, mine operators typically install steel sets, which are covered with wooden blocks and backfilled with an expanding type c
Jan 1, 2011
-
Grinding Mill Scale-up Problems
By N. Arbiter, C. C. Harris
The economic advantages of large diameter ball mills can be compromised by unexpected capacity limiting conditions. These arise because media rotational flow to ore axial flow ratios, and the number o
Jan 1, 1982
-
Stress, Geologic, And Support Design System (SGSSM) For Underground Mine Slopes
By J. C. Stankus
Accurate evaluation of stress and geological conditions is critical to ground control design in underground openings. For a slope entry, the problem is more difficult because a slope will transverse
Jan 1, 2011
-
Evinos-Mornos Tunnel – Greece Construction of a 30 Km Long Hydraulic Tunnel in Less Than Three Years Under the Most Adverse Geological Conditions
By Remo Grandori, Manfred Jaeger, Fabrizio Antonini, Luis Vigl
The EVINOS-MORNOS tunnel project with its 30 km of length is one of the longest hydraulic tunnel in the world realised with TBM method. The adverse geological conditions, the high cover and the sho
Jan 1, 1995
-
Final Tunnel Liner at Mill Creek 3 Project - Case Study
By M. Schafer
The 20 foot diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT-3) has been completed. This paper will summarize aspects of liner design and address the construction approac
Jan 1, 2008
-
Flotability Of Metallic Iron Fines From Comminution Circuits And Their Effect On Flotation Of A Sulfide Ore
By H. K. Lin
The effect of metallic iron fines on froth flotation of a sulfide ore was examined by comparing the flotation results with and without iron fines present in the flotation feed. Mild steel and ceramic
Jan 1, 2008
-
Design And Construction Of The Lenihan DAM Outlet Tunnel And Shaft
By Hemang Desai
A damaged outlet pipe beneath Lenihan Dam has restricted reservoir discharges, severely constraining the owner?s groundwater recharge program. The solution, a new outlet pipeline through the dam?s rig
-
A Public-Private Partnership Success Story: Treating Abandoned Mine Drainage At Jennings Environmental Education Center
By R. Hedin, M. Dunn
The Pennsylvania Department of Environmental Protection (US EPA 319 program) provided funding to aid a public-private effort in the installation of an environmentally-friendly system to treat abandone
Jan 1, 2002