Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Reserve’s Process Modifications Succeed at Silver Bay

    By Charles L. Allie

    Since Reserve Mining Co. began commercial operations at Silver Bay, MN, some 25 years ago, major improvements in taconite processing technology have become available. In addition, significant new gove

    Jan 12, 1980

  • SME
    Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, Ohio

    By Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert

    PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with

    Jan 1, 2007

  • SME
    Copper Precipitation And Cyanide Recovery Pilot Testing For The Newmont Yanacocha Project

    By S. Acar, M. Botz

    Introduction In 2007, Newmont Mining Corporation will begin construction of a milling and cyanidation leaching circuit for the Yanacocha site in Peru. Ore to be processed in the circuit contains a r

    Jan 1, 2007

  • SME
    Forensics Of Difficult Ground Conditions Leading To Advanced Solutions For Recovery Of An Abandoned Tunnel Project

    By Faruk Oksuz, Phillip L. Covell, Martin Doll

    A series of difficult ground conditions causing high groundwater inflows and hazardous gas intrusion abruptly halted the construction of a 6.4-meter (21-foot) finished diameter and 1,890 meters (6,200

    Jan 1, 2007

  • SME
    A Mathematical Programming Model For Open Pit Short-Term Production Scheduling

    In this paper, a mixed integer linear programming (MILP) model for the short-term scheduling of open pit mines is formulated. The proposed model aims at sequencing the blocks extraction over multiple

    Jan 1, 2011

  • SME
    An Underground Concept For Oil Field Development In Offshore Areas

    By Cherie H. Tilley

    The possibility of drilling oil wells from underground locations is not a new concept. It bas not been cost effective for the oil industry in the past and therefore disregarded. Today's state of

    Jan 1, 1983

  • SME
    Influence of Rock Mass Properties on Performance of Hard Rock TBMs

    By Jamal Rostami, Richard Kastner, Ahmad Ramezanzadeh

    Improving the accuracy of the performance prediction models for hard rock Tunnel Boring Machines (TBMs) is important in estimation of the schedule and cost of tunnelling in related projects. The effec

    Jan 1, 2005

  • SME
    Evaluation Of Cyanide Producing Microorganisms To Recover Gold From Low-Grade Ore ? Introduction

    By D. Shin

    The gold leaching using cyanide from ore or waste has been almost universally in use [1]. Recently, biological gold bioleaching using cyanide producing bacteria, e.g. Chromobacterium violaceum, Pseudo

    Jan 1, 2012

  • SME
    Timing, Motivation, Technology Important for Improved Mining Productivity

    By William G. Doepken

    With most of the mining industry emerging from the deepest business recession in 50 years, primary attention must be given to surviving in a business climate where dominant foreign competition, depres

    Jan 11, 1983

  • SME
    The Characterization Of Frothers And Frother Blends Based On Dynamic Surface Tension Measurements

    By B. Comley, M. C. Harris

    There is as yet no accepted method of predicting flotation frother performance in plant processes based on laboratory scale characterisation techniques. This paper investigates the use of dynamic surf

    Jan 1, 2001

  • SME
    Laboratory Investigation of the Anisotropic ConfinementDependent Brittle–Ductile Transition of a Utah Coal

    This paper was developed as part of an effort by the National Institute for Occupational Safety and Health (NIOSH) to identify risk factors associated with bumps in the prevention of fatalities and ac

    Jan 7, 2020

  • SME
    Real Options: A Tool For Managing Technical Risk In A Mine Plan

    By J. A. Botín

    NPV is a static measure of project value which does not discriminate between levels of internal and external risk in project valuation. Due to current investment project?s characteristics, a much more

    Jan 1, 2012

  • SME
    Creation Of An Underground Mine Development Sequencing Optimizer

    By M. J. Blattman

    Upon completion of an underground mine design, the planning engineer is faced with a surprisingly complex problem, “What development and mining sequence should be implemented so as to maximize the ret

    Jan 1, 2003

  • SME
    Mine and Mill Labor Productivity Study Shows Wide Range of Values

    By Leons Kovisars

    Introduction Labor is the major cost element for most mining operations. Labor costs are continually increasing, both in nominal and constant terms. This is true in developed as well as less develope

    Jan 11, 1983

  • SME
    Timber Supported System – Introduction

    By George L. Wilhelm

    Timber support of mine openings continues to be an effective system for ground support, due to its avail¬ability, flexibility, and ease of installation. Timber support of mine openings as a primary m

    Jan 1, 1982

  • SME
    Big Hole Drilling -- The State Of The Art

    By M. D. Lackey

    The "Art" of Big Hole Drilling has been in a continual state of evolution at the Nevada Test Site since the start of underground testing in 1961. Emplacement holes for nuclear devices are still being

    Jan 1, 1983

  • SME
    Helping Banks To Manage Mineral Land Trusts

    By S. M. Pickering

    Banks frequently manage large privately owned mineral land trust accounts for estate heirs. The bank has a fiduciary obligation to follow the “Prudent Man Rule”, which requires that trust properties

    Jan 1, 2002

  • SME
    High Pressure Water Jet Assisted Tunneling

    By Russell Miller, Fun-Den Wang

    High Pressure Water Jet Assisted Tunneling The high pressure water jet assisted tunneling project was conducted in a granite quarry near Skykomish, Washington, approximately 90 miles east of Seattl

    Jan 1, 1976

  • SME
    Designing, Installing and Maintaining Clean, Stable and Efficient Conveyor Belt Systems

    By R. P. Stahura

    Conveyors are the lifeline of mining and processing operations. They continuously supply materials to and carry finished products and waste away from operations. When conveyors are running at less tha

    Jan 1, 1992

  • SME
    Port of Miami Tunnel Update?A View From Design Builder?s Engineer

    By Wern-ping Chen

    Technical and non-technical challenges exist in each mega infrastructure project. It?s no exception to the first US underground PPP Port of Miami Tunnel (POMT) project in Miami, FL. The POMT will conn